HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE, LOT 6, FUEL FACILITY - PDP - 33-94F - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYMultimodal Transportation Level of Service Manual P. 18
LOS Standards for Development Review - Pedestrian 7-/2
A Part Petri n n T .CAS Wnrksheet
project location classification:
Ia
I1fl
Ia
IF
description of applicable
destination area within 1,32W
including address
ycHu�/Art-
E
6014 47' T {a/ s4sT2�0
iT� t%SvJ Crx of
SW oFAfE
.t
I
(enter as many as apply)
destinatilevel of service (minimum based on project location classification)
classifie-+n.
(see t®.«tne+ m+ n w""�a S—ity
'4I1 F- -actual
1'-
�a/NdCGA(, tr---
actual
IF Proposed
C
act-ual
PI poposed
City of Fort Collins Transportation Master Plan
Multimodal Transportation Level of Service Manual P. 18
LOS Standards for Development Review - Pedestrian
2
I 'C;n,,,.o A Pori PCI-rlan T.n.q Worksheet
project location classification:
is
1a
IE
description of applicable
destination area within 1,32W
including address
�IC[.AtrE S���y
I,.1,vE[vA�6�T `i�sr1s�
Rock 904?wE Mtiu7 fi�wl:'/
/?�Sio6.a'TIRL.
uxsi
�,�A3DN Diet ✓E (oF
SChFao� - 1
N �
Mom"
s3vs.NEss �
NE eeIAN6-e N�Nvi
E. o f
T1✓�T ���/T't (enter as many as apply)
destination area level of service (minimum based on project location classification)
classification d Qaan. WwJ
(se! text) dlraaer m+w+4 i°`~ �nerati muroy
...as.,
%A& actual
Proposed
miinan
actual
proposed
merimm
actual
proposed
%�� City of Fort Collins Transportation Master Plan
Ms. Peggy Friesen June 6, 2000
Galloway, Romero & Associates Page 4
The Comfort Suites hotel and surrounding retail land uses, located in the southwest
quadrant of Harmony Road and Wheaton Drive are not as easily accessible for
pedestrians. Sidewalk does exist on the north side of Harmony Road - adjacent to
the Harmony Center Marketplace. However, the intersection of Harmony Road and
Wheaton Drive is not particularly pedestrian friendly. This is a three-quarter
movement intersection with the STOP -control on Wheaton Drive. If pedestrians
from the Harmony Center Marketplace desired to walk to the Comfort Suites, etc.,
they could cross at the Harmony/McMurry intersection but would have to walk on
the south side of Harmony which does not have sidewalks.
Within the Harmony Center Marketplace, good pedestrian amenities exist.
Pedestrians can comfortably walk to and from each of the individual land uses.
Bicycle Analysis
"On -Street Bicycle Lanes" exist on Harmony Road, Wheaton Drive, McMurry
Avenue, Monte Carlo Drive that would provide access to/from the Harmony Center
Marketplace to any of the destination areas outlined above.
Transit Analysis
The ease of using transit to access the proposed project was reviewed. According
to City of Fort Collins staff, there is existing, limited peak hour transit service on
Harmony Road. With the development of the proposed gasoline/service station, a
bus shelter will be constructed on the existing transit pad located on the north side
of Harmony Road on the west side of the existing right-in/right-out access point.
To summarize, because the proposed gasoline/service station is located on one of
the internal pads within the Harmony Center Marketplace, the pedestrian and
bicycle amenities have already been constructed. This gasoline/service station will
not have an impact on the existing amenities. This lot is easily accessible from
within the Harmony Center Marketplace and from the destination areas outlined
above. In addition, a bus shelter will be constructed on the existing transit pad on
the north side of Harmony Road with the development of this gasoline/service
station.
believe that this letter addresses both the trip generation adjustments and the
alternative modes analysis for the City of Fort Collins. If you have any other
questions, please feel free to call me.
Sincerely,
Ann T. Bowers, P.E.
Transportation Engineer
enc.
Ms. Peggy Friesen June 6, 2000
Galloway, Romero & Associates Page 3
The analysis determined the existing Pedestrian LOS for each destination area by
looking at directness, continuity, street crossings, visual interest & amenities, and
security.
The Enclave single-family residential development is located just north of Monte
Carlo Drive, on the north side of the Harmony Center Marketplace. There is very
good pedestrian connectivity and continuity between the Harmony Center
Marketplace and the Enclave development. There are sidewalks on both sides of
Monte Carlo Drive. In addition, there are safe, well signed, raised crosswalks
across Monte Carlo Drive from the site to the north side of Monte Carlo Drive. The
raised crosswalks are located at Iva and Monaco Place.
The RockBridge multi -family residential development, located on the west side of
Wheaton Drive can be accessed easily from the Harmony Center Marketplace.
Continuous sidewalks exist on both sides of Wheaton Drive from Harmony Road
north for at least 1/2 mile. Crosswalks do not exist at the intersection of Wheaton
Drive/Harmony Center Access/RockBridge Access. However, there is good
visibility for both the pedestrians and the motorists so that pedestrian crossings
could be made safely. V
Knuse Elementary School is located northeast of the Harmony Center Marketplace,
on the northeast corner of McMurry Avenue and Monte Carlo Drive. Continuos
sidewalk exists on the west side of McMurry Avenue from Harmony Road to north
of the school. Sidewalk exists on the east side of McMurry from north of the school
to the undeveloped parcel on the northeast corner of McMurry and Harmony.
The school entrance is just north of the intersection of McMurry and Monte Carlo.
The intersection of McMurry and Monte Carlo is a four-way STOP controlled
intersection with pedestrian crosswalks on all four legs. Monte Carlo Drive, east of
McMurry Avenue also has sidewalks on both sides of the roadway that stop short of
Innovation Drive.
The Golden Meadows Business. Park, located on the northeast:quadrant of
Harmony Road and McMurry Avenue is easily accessible by pedestrians, as well.
As indicated earlier, sidewalks exist on McMurry Avenue. Pedestrians can safely
cross McMurry Avenue at the signalized intersection with Harmony Road.
The Hampton Inn, Quiznos, Pizza Pipeline, and office development located in the
southeast quadrant of Harmony and McMurry are accessible to/from the Harmony
Center Marketplace relatively easily. Continuous sidewalk exists on the north side
of Harmony Road. The signalized intersection of Harmony Road and McMurry
Avenue has pedestrian push buttons and pedestrian crosswalks on all four legs.
South of Harmony Road, McMurry Avenue has continuous sidewalk on the east
side of the roadway. Sidewalk does not existing on the west side of McMurry nor
on the south side of Harmony - adjacent to the cemetery.
Ms. Peggy Friesen
Galloway, Romero & Associates
June 6, 2000
Page 2
TABLE 2 TRIP GENERATION
FROM APPROVED TRAFFIC STUDY
SIZE
ITE
AM PEAK HOUR
PM PEAK HOUR
LAND USE
(KSF)
CODE
ADT
IN OUT TOTAL
IN
OUT
TOTAL
Grocery Store
48.0
850
4,960
67 29 96
253
243
496
Retail
40.3
814
1,639
124 134 258
113
86
199
Restaurant
12.0
832
2,134
91 87 178
87
68
155
Fast Food
3.8
834
2,698
108 104 212
72
67
139
Bank
4.6
912
1,220
29 22 51
96
105
201
Daycare
6.6
565
523
46 40 86
42
48
90
TOTAL
13,174
465 416 881
663
617
1,280
KSF: 1000' gross floor area
II. ALTERNATE MODES ANALYSIS
Pedestrian Analysis
A pedestrian analysis, in accordance with the City of Fort Collins Pedestrian LOS
Standards, was conducted for this project. The following, in addition to the
Pedestrian LOS Worksheet, summarizes the findings of the analysis.
According to The City of Fort Collins Transportation Master Plan, the Harmony
Center Marketplace, including the proposed gasoline/service station, is located
within a location area deemed "activity corridor/center'. The applicable minimum
Level of Service for the "activity corridor/center' category is LOS B.
The Harmony Center Marketplace is bounded by Monte Carlo Drive to the north,
Harmony Road to the..south, Wheaton Drive totne'wesi, and McMurry Avenue on
the east.
The following destination areas within a quarter -mile of the proposed project site
were identified. These include the Enclave residential development to the north,
the Knuse Elementary School to the northeast, the Golden Meadow Business Park
to the east, the RockBridge multi -family residential development to the west, the
Hampton Inn, Quiznos Restaurant, and Pizza Pipeline development to the
southeast, an office development south of Hampton Inn, and the Comfort Suites
hotel and some retail uses to the southwest.
I
Krager and Associates, Inc.
1390 Stuart Street, Carriage House
Denver, Colorado 80204-1243
" (303) 446-2626 FAX i303i 446-0270
June 6, 2000
Ms. Peggy Friesen
Galloway, Romero & Associates
5350 DTC Parkway
Englewood, Colorado 80111
f
JUN 0 8 Zo4p
Re: Harmony Center Marketplace - Safeway Fuel - Fort Collins, Colorado
00491pf.wps
Dear Peggy:
Per your request I have conducted a Trip Generation and Alternate Modes analysis
for the proposed gasoline/service station for the Harmony Center Marketplace.
I. TRIP GENERATION
The revised project trip generation is shown in Table 1. Table 2 illustrates the trip
generation that was approved in the Traffic Impact Study for this site. As you can
see from the two tables, the addition of a gasoline/service station on this site
results in less traffic than the land uses assumed in the Traffic Impact Study.
i not
TABLE 1„
REVISED TRIP GENERATION
ITE
PM PEAK HOUR
LAND USE
SIZE
CODE
ADT
I
ENTER
EXIT
TOTAL
Grocery
48.3 KSF
850
5,386
284
272
556
Retail
49.1 KSF
814
1,997
55
72
127
Drive -In Bank
6windows
912
1,591
42
34
76
Restaurant
5.0 KSF
832
652
33
21
54
Gasoline/Service Station
12 VFP
845
1,953
80
80
160
w/Convenience Market
Day Care
6.0 KSF
565
476
37
42
79
TOTAL
12,055
531
521
1,052
KSF: 1000' Gross Floor Area,
VFP: Vehicle Fueling Positions