of materials and color to match the proposed kiosk and existing center. Screening of
rooftop mechanical equipment is provided by stucco panels to match the building on the
kiosk, and screened by the parapet on the convenience store. The conduit, meters, vents
and other equipment attached to the buildings will be painted to match surrounding
building surfaces.
Section 3.5.3, Mixed -Use, Institutional and Commercial Buildings:
Consideration was given to the relationship of the building, canopy and fueling area to
the streets, private drives, walkways and parking areas. The entrance of the convenience
store faces directly onto a connecting walkway that leads to the public pedestrian system
along E. Harmony Road. The building facade includes wall articulation by patterns of
stucco, stone veneer and window planes. The entrance is clearly defined by the same
pitched roof element characteristic of the existing center. A freestanding tower feature is
located at the northeast comer of the site to mirror the tower element used on the building
east of the entrance driveway off E. Harmony Road. Pursuant to Planning Department's
request, we have provided a picnic table under the tower for an amenity to the center.
Signs:
The proposed site is located within the Non -Residential Uses in the Residential
Neighborhood Sign District and will comply with City Code Section 3..8 (E). According
to discussions with Peter Bames in the Zoning Department, there is one "secondary"
ground sign available for the Harmony frontage, which the proposed project will utilize.
The proposed secondary ground sign will be installed on a stone veneer base to match the
store. The secondary sign is 28 square feet per face and measures six foot high. There
will be one canopy logo sign located on the Harmony Road frontage not to exceed 12
square feet. Wall signage for the Phase II convenience store consists of one s_iign per.
elevation, within the allowable area.
Np 1
SUMMARY STATEMENT:
The Safeway Fueling Facility will provide a quality project to further gnhance the
existing Harmony Safeway Marketplace retail center development. We respectfully
request approval of the Project Development Plan (PDP) upon design and plans meeting
and exceeding the codified development standards and design guidelines for the
Harmony Corridor project.
6
with Phase II. The sidewalk will connect the internal walk along the north property line
with the detached sidewalk system along the E. Harmony corridor. A bicycle rack is
located west of the western access drive.
Two points of access are provided to promote efficient circulation at the fueling activity
area. Striped parking spaces will be provided for Phase II, with the convenience store
addition. The parking will be located directly in front of the store, to eliminate any
conflict between the fueling area and convenience users.
The paved areas for fueling and parking are setback approximately 85 feet from the E.
Harmony right-of-way. Parking requirements utilized for this development are 4 spaces
per 1,000 square feet of retail space. A total of nine spaces is provided with Phase II
construction, one of which will be handicap accessible.
Site Lighting 3.2.4:
LTV % .44 `.
Sight lighting is designed with safety provisions for the users and sensitivity to V �`b VP
surrounding uses within the center. The existing light standards are 400 watt high
pressure sodium luminaries, with down cast fixtures, not to exceed 0.10 foot candles on
E. Harmony Road. The poles will match the overall center light poles and be constructed
23' high to match the existing lighting. Site lights will match the existing center. Light
sources will be shielded. A photometric light analysis is provided to demonstrate
compliance with the Land Use Code requirements.
Engineering Standards:
Utilities: All utilities are stubbed to the site. A 4" sanitary line will be extended from the
existing line located at the northeast corner of the site. A 1" waterline will be extended
from the existing main located at the northeast corner of the site. Electric and gas will be
serviced from existing lines located in the existing drive along the north property line.
Drainage: The site complies with the approved drainage for the overall center as well as
current drainage criteria adopted by the City.
Public Improvements: There are no public improvements associated with development
of this site. All public improvements were constructed with the initial development phase
for the Harmony -Safeway Marketplace PUD.
Building Standards:
Measures were taken to provide architectural compatibility with the established
architectural character a overall center. The same colors and materials are
incorporated into the esi f the structures, which include stone veneer, stucco to
match Retail Buildin "D", orrice/cap flashing to match the Safeway grocery store, and
concrete roof tile to atch a existing buildings.
5
• Lighting — Internal site lights will match the existing center light standards.
Pedestrian lighting and private drive lighting currently exist along the east property
frontage. Canopy lighting is restricted to recessed light fixtures with flat lens that G e o D
will be mounted flush to the canopy ceiling deck. This light design will 'prevent any
onsite and offsite glare commonly associated with fuel canopies.
• Setbacks — Generous setbacks are observed in the proposed site layout.
• Architectural Design — High quality design has been upheld for this project. The
kiosk and convenience store will be constructed with similar exterior finishes as the
retail shops, incorporating stucco, concrete roof tile, stone wainscot and canopy
columns, and metal framework accents to match the retail buildings. Development of
the pad will complete the Harmony frontage with a cohesive presentation. A tower
will be added at the northeast corner of the site to component the tower entry feature
on the VD�
of the shopping center entry drive. The structures will match Retail
Buildicolor. IJNMr'� 'p � L' AParkinvice Areas — The parking spaces will be striped with Phase II
construction of the convenience store. The parking area and fueling activity area will
be screened from E. Harmony with a combination of berming and plantings including
deciduous and evergreen trees and shrubs in the 83' landscaped buffer.
Compliance with General Development Standards
Open Space/Landscaping:
The proposed landscaping supports functional purposes by creating spatial definition of
the site as well as creates a buffer between the fuel activity area and the public street.
Perimeter landscaping exists along both the Harmony frontage and along the private drive
into the center, located immediately east of the site. Combinations of evergreen and
deciduous trees and shrubs provide buffering along the perimeter of the pad. The
selection of planting materials and landscape design is from the landscape palette
approved for the PUD.
46% of the site is provided in landscaping, which meets and exceeds the standards of
Division 3.2.1 of the Fort Collins Land Use Code. Additional plant materials added to
the existing perimeter plantings exceed minimum planting requirements.
The placement and interrelationship of required landscape elements enhances visual
continuity within and between adjacent pad developments, and provides visual interest
year round. Placement of the shrub beds along the internal fueling area provides
additional screening and frames the monument price sign.
Access Circulation and Parking 3.2.2:
The proposed development is designed with safety, efficiency and convenience in mind
for vehicles, bicycles and pedestrians, both within the development and to and from
surrounding areas. Phase I of the project is strictly a vehicular use, with no attraction for
pedestrian services. The pedestrian sidewalk connection through the site is proposed
4
• This use does not directly abut a residential neighborhood. It is surrounded by
commercial development on the north, east and west. The land use area directly
south of E. Harmony consists of undeveloped Oakridge Park Business Center and an
historic cemetery site. The proposed structures will match the existing retail anchor
and center with regard to building materials, color and architectural design
components.
• There will be no outdoor storage or sales of items except as otherwise authorized
through the Zoning Code and Harmony Marketplace PUD Declarations of Covenants,
Conditions and Restrictions.
• The Safeway -Harmony PUD is included as the context diagram. This demonstrates
compatibility between the proposed project and developed sites within the retail
center. Existing development within the center consists of a variety of unrelated
mixed -use retail uses and a restaurant. The design offers vehicular access through the
existing public street system and pedestrian links through a combination of public and
private walkways and pedestrian paths.
Building Design:
• The proposal is a two-phase construction project. Phase I is strictly a fuel facility for
vehicular use. Phase H introduces the convenience store, which is oriented with an
entrance that faces and opens directly onto an adjacent sidewalk that, has direct
linkage to the street sidewalk without requiring pedestrians to cross any intervening
driveways or parking lots. The proposed sidewalk will also link the development to
the retail center's existing connective paths for pedestrian circulation among the
businesses. ? e
• The scale and height of the�ronose�doffices are com li entary to surrounding
developments within the center in both mass and hei t.
Compliance with Harmony Corridor Design Standards and Guidelines
• Harmony Road Setback — The setback zone along the E. Harmony Road frontage was
established with approval of the Harmony - Safeway Marketplace Final PUD Site
Plan. There is an 83' landscaped setback from the edge of street pavement. The
setback also includes berms and a drainage swale. Proposed buildings are located
over 80' from E. Harmony Road, exceeding the zoning setback requirements.
• A detached, meandering 8' sidewalk/bikepath was installed with the original
perimeter and infrastructure construction along the Harmony frontage. In addition, a
concrete pad for the planned ansit stop wasalso_constructed with the original =rJ TN
infrastructure connecting to the direct sidewalk path established to the main retail W F at, 6
shops. `rbe
• Grading — The site grades have been established through previously approved plans
for the overall center. This pad will be developed in conformance with the
established grades for this site.
• Plant Palette — Proposed plantings will be selected from the same palette used for
other developments in the center.
3
Compliance with Intent of Zone District
The proposed Safeway Fuel at Harmony Marketplace is located within the Harmony
Corridor Zone District (HC). The site is further located within the Neighborhood Service
Center area. The purpose of the Neighborhood Service Center is to provide a shopping
center located in a complex which is planned and developed as a unit, and located within
and intended to primarily serve the consumer demands of residents and employees who
live and work in adjacent and surrounding neighborhoods. A gasoline service station is
one of the limited permitted uses within this zone district.
The proposed fuel facility is compatible with the character of a Neighborhood Service
Center as outlined in the zone district in the following ways:
• Development of this site will further link the pedestrian system. A sidewalk will be
constructed with Phase II leading from the Harmony pedestrian system, to the store
and connecting -to the existing center. A transit pad was constructed with the original
direct sidewalk connection from E. Harmony. Development of Lot 6 will add the
required bus shelter for this pad and activate the Transfort route to this center.
• The Safeway Marketplace "identity" has been created with the previously approved
PUD, which established architectural themes, colors and materials. This development
will be compatible with the existing commercial structures. The facility will
incorporate the same building materials, color, and architectural elements as the
anchor and retail stores.
• Additional outdoor space is created through construction of a freestanding tower
structure and the installation of a picnic area on site.
• Additional landscaping will provide year-round screening of the vehicular activity
area from the public street and internal drives.
Compliance with Land Use Harmony Corridor Development Standards
The proposed fueling/convenience facility meets the Land Use Development Standards of
the Harmony Corridor Zone District as follows:
Site Design:
• Site development is subject to the Site and Landscape Covenants for Harmony
Safeway Marketplace PUD, and the Declaration of Easements with Covenants and
Restrictions Affecting Land in addition to the Harmony Corridor Development and
Design Standards as outlined in the Land Use Code. Pursuant to the real estate
contract on the property, Safeway commits to enter into cooperative agreements with
adjacent property owners within the center to create a site design in compliance with
a comprehensive development plan establishing an integrated pattern of internal
drives and pedestrian links, outdoor space, building style and land use. The Harmony
Marketplace Declarations of Covenants, Conditions and Restrictions require
approvals through an architectural control committee to insure a standard of quality
development contextually complimentary to other developments within the center.
2
STATEMENT OF PLANNING OBJECTIVES
SAFEWAY FUEL AT HARMONY MARKETPLACE
1426 E. HARMONY ROAD
FORT COLLINS, CO
Project Description:
The Safeway Fuel at Harmony Marketplace project is a proposed fueling and
convenience development located with the Harmony Safeway Center at the northwest
corner of E. Harmony Road and McMurry The 1.3-acre lot is described as Lot 6,
Harmony Safeway Marketplace P.U.D. The proposed development will be a two -phased
development as follows:
Phase I Construction
• Construct an 86' x 43' canopy (3698 sf).
• Install five multi -product fuel dispensers
• Construct a 22' x 12' kiosk (268 sf)
• Install perimeter landscaping and paved area
• Install freestanding tower feature
• Sod Phase II area until construction of the convenience store
• Install the trash enclosure and bicycle rack
• Install the secondary ground sign
Phase II Construction
• Remove kiosk and replace with sixth multi -product fuel dispenser
• Construct 46.5' x 60' convenience store (2790 sf)
• Stripe parking spaces
• Add Phase I1 landscaping
Forty-six percent of the site will be landscaped, including an existing landscape buffer,
drainage swale and detached sidewalk along E. Harmony Road. Vehicular access to the
site is by two curb cuts off the internal private drive of the retail center. Pedestrian access
to the site is by a public sidewalk network along E. Harmony Road as well as an internal
sidewalk system within the center. There is a bus pad that was installed with the original
Safeway center improvements at the southeast corner of the site to provide the option of
alternate transportation via Transfort.
The subject site is currently owned by SB Properties 22, in care of Wessex, PO Box
44033, Phoenix, AZ 85064. Developer and Contract Purchaser is Safeway, Inc., 1850
Mount Diablo Boulevard, #250, Walnut Creek, CA 94596. Galloway, Romero &
Associates will represent the owner and developer for all correspondence and matters
related to the development review process for the Project Development Plan approvals.