Loading...
HomeMy WebLinkAboutHARMONY SAFEWAY, CENTENNIAL BANK - FDP - 33-94D - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSWYATT &ASSOCIATES, PC`\ALARCHITECTS and PLANNERS May 7, 1999 Mr. Ted Shepard Planning Department City of Fort Collins 281 N. College P.O. Box 580 Fort Collins, CO 80522-0580 RE: Final Plan P.U.D. L G % At CE/V 1T4(VNt4 L Lot 4 Site Plan Harmony Road Fort Collins, Colorado Dear Ted Shepard: Attached is the resubmission of the Final Plan Application originally submitted to Fort Collins on March 1 1999. Thank you for reviewing the attached documents, regarding Lot 4. We have responded to your concerns that were called out in the Staff response letter dated April 7th and in our review meeting April 12th. A stronger pedestrian connection to the adjacent lot and the Longs Drugs site has been added. In Addition to the walkway a bicycle rack has been added to encourage alternate forms of transportation to the site. The landscaping has been intensified between the parking and Harmony Rd. and McMurray to further screen the cars from view of the road. The trash enclosure has an increased amount of landscaping and a monument sign / clock to better screen it. These changes have increased the pedestrian friendly atmosphere previously found on the Lot 4 submittal, meeting Fort Collins desires for pedestrian oriented design. Thank you for your prompt response to this resubmission. If you have any questions, please don't hesitate to call. Cordially, Wyatt ssociate P.C. Michael Davison, Project Manager (Applicant's Representative) cc: Dave Armstrong Q/9NK 1865 so. pearl st., denver, colorado 80210 (303) 698-1717 fax (303) 778-6004