Loading...
HomeMy WebLinkAboutHARMONY SAFEWAY, BLOCKBUSTER - FINAL - 33-94C - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSWYATT 8c ASSOCIATES, PCXN ARCHITECTS and PLANNERS May 7, 1999 Mr. Ted Shepard Planning Department City of Fort Collins 281 N. College P.O. Box 580 Fort Collins, CO 80522-0580 RE: Final Plan P.U.D. Lot 5 Site Plan GOT s = BLaGKCiUS TE,e/REiL Harmony Road Fort Collins, Colorado Dear Ted Shepard: Attached is the resubmission of the Final Plan Application originally submitted to Fort Collins on March 1 1999. Thank you for reviewing the attached documents, regarding Lot 5. We have responded to your concerns that were called out in the Staff response letter dated April 7th and in our review meeting April 12th. Pedestrian connections to the adjacent lot and the "entry drive walkway" have been added and strengthened. A pedestrian friendly plaza has been added to strengthen the tie of the main parking area to the retail shops on Lot 5. In Addition to the walkways a bicycle rack has been added to encourage alternate forms of transportation to the site. The landscaping has been intensified between the parking and Harmony Rd. to further screen the cars from view of the road. The trash enclosure has an increased amount of landscaping to better screen it. The building elevations and the building plan have been revised to add more interest on all four elevations. Canopies have been added to both the north and east elevations as well as an open tower at the northwest corner. All these changes have increased the pedestrian friendly atmosphere already found on the Lot 5 site plan, meeting Fort Collins desires for friendly positive design. Thank you for your prompt response to this resubmission. If you have any questions, please don't hesitate to call. Cordially, Wya &Assoc tes, P.C. o Michael Davison, Project Manager (Applicant's Representative) cc: Larry Gilleland 1865 so. pearl st., denver, colorado 80210 (303) 698-1717 fax (303) 778-6004