HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE PUD - FINAL - 33-94B - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (3)46. Please modify the Land Use Data Table so that there are two situations
described. First, describe the data associated with the area devoted to the
Final. Second, describe the total area, Preliminary and Final combined. Be
sure to separate out all categories, including parking.
47. For buildings A, B, C, and D, please provide building envelope dimensions and
distance to nearest property lines.
48. Please indicate a typical parking stall dimension.
49. The vicinity map is not very legible. Please redo and be sure street names,
name of school, and name of subdivisions are legible. Also provide a north
arrow and approximate scale.
50. Please add water conservation data to the landscape plan.
This concludes Staff comments at this time. As mentioned, if permission from CDOT
for the Harmony access is not received by August 7, 1996, the P.U.D. will be forwarded
to the September 23, 1996 Planning and Zoning Board meeting. If permission is
obtained, please consider August 7, 1996 to be the deadline for revised plans based on
these comments. Five sets of revised plans should be provided.
If CDOT permission is not forthcoming by August 7, 1996, it is suggested that we
continue to work on all other issues on a timely basis.
As always, please call if there are questions or concerns regarding these comments.
Sincerely:
Ted Shepard
Senior Planner
xc: Kerrie Ashbeck, City Engineer
Enclosures
shall not allow national corporate identification architectural features become the
dominant form. Pad development bears the burden of demonstrating
compatibility with the shopping center.
39. Noise was an important issue for the residents on Iva Court. The rooftop
parapet screen wall on the north elevation must be carefully designed so that its
acoustic properties prevent sound from spilling over to the north. Such
properties could include wall thickness, wall height, a rough or fluted surface on
the inside for sound attenuation, or a foam core wall for sound aborpstion. The
developer must demonstrate that special consideration has been given to this
issue.
40. Please clarify on the south elevation of Safeway that the two garage doors that
block the loading dock will not be white but a muted, soft tone that has low
reflectivity and complements -the colors found in the center.
41. The architectural sheet should be labled Sheet 4 of 5.
Part Five - Notes and Other Details
42. The Cover Sheet should make it clear that plans include a Final P.U.D. for
Buildings A, B,C, and D as indicated by a heavy line designating the phases.
The balance of the shopping center is considered to remain in a Preliminary
P.U.D. status. The purpose of showing the balance of the center is to ensure
that the entire center will be designed and function as a cohesive unified
development, and act as a guideline for future development
43. The definition of a Neighborhood Shopping Center as stated in the Harmony
Corridor Plan, Standards and Guidelines, should be included on the Cover
Sheet.
44. Please add a note stating:
Bike racks shall be provided for each building and placed near the entry.
Racks shall be permanently anchored to concrete and allotted sufficient
space so they shall not interfere with pedestrian access or landscaped
areas.
45. Please indicate on the Site Plan that total square footage of Retail C and D
equals 24,760 square feet. (If this building exceeded 25,000 square feet, it
would be required to comply with Design Standards for Large Retail
Establishments.)
Part Three - Landscape Plan
32. As mentioned, Staff is primarily concerned about the dilution of the buffering and
screening function of the 80 foot setback area due to the stormwater detention
ponds and the water transmission main. Recognizing these conflicts, the
Landscape Plan must demonstrate how the design intent of the Harmony
Corridor Plan will still be achieved. If the design intent cannot be met, the new
design must be equal to or better. Water and sewer lines and other utilities with
potential conflicts must be shown on the Landscape Plan.
33. The two large pine trees at the southwest corner of the site should be specified
as to remain and protected from construction. Please add the standard tree
protection notes to the Landscape Plan available from the Forestry Department
or Planning Department.
34. Pad sites E and H have potential drive-thru facilities (although not for drive-thru
restaurants) that need more screening along Wheaton and McMurry. Please
add landscape materials to these areas.
35. A note should be added that for Pad Sites, shrub beds will be expected to soften
all screen walls for trash enclosures, electrical transformers, and other outdoor
utility appurtenant structures such as gas meters and telephone pedestals.
36. Please provide a Phasing Plan that relates to Note Number 5. It is expected that
the 80 foot setback zone along the entire Harmony frontage will be included in
Phase One.
37. The north elevation of Building D would benefit from shrub beds that help break
up the building facade that faces the neighborhood.
38. It is suggested that the two driveway entrances off Wheaton and McMurry be
considered for a landscaped median with street trees.
Part Four - Architectural Elevations:
38. A detailed note needs to be added to the Site Plan Cover Sheet regarding the
future architectural intent of the pad sites. This note should be titled
"Architectural Intent of Pad Site Development" and state that design of the pad
site structures shall be complementary to the design, form, materials, colors, and
height as found in anchor tenants (Buildings A, B, C, D). The note should clarify
that while individual expression may be allowed, such features shall not
dominate the pad structure. Such features include, but are not limited to,
covered entries, sloping rooflines, arcades, porches, decorative fencing,
windows, chimneys, or other such architectural elements that are reviewed and
found acceptable by the Planning and Zoning Board. Pad site development
setback zone along Harmony Road.
26. Of the four pad sites along Harmony, only Pad F has the ability to provide a
pedestrian space or outdoor dining. As pedestrians traverse the interior parking
lot, they need a comfortable °landing zone° that is spacious, attractive,
illuminated, landscaped and leads to a building entry. Pedestrians should be
rewarded for using the internal sidewalk system and not arrive to a pad site only
to find conflicts with the auto. Each pad should feature a "comfort zone" for the
arriving pedestrian.
27. The developer is strongly encouraged to provide more opportunities for outdoor
dining on Pads E, G, and H. (I am always amazed that in the most unpredictable
of all spaces (detention ponds, berms, planter strips), people have put out picnic
tables for casual dining, work breaks, or waiting for a companion to conclude
business.) Pedestrian plazas should be anticipated and designed with attractive
features and not evolve haphazardly. Such places can be indicated on the plan
as a "plaza" and a note should be provided calling out what elements are to be
included in these spaces. (Please refer to City Comforts for ideas.) This will
help guide the Final P.U.D.'s for the pad sites.
28. Be sure that all electrical transformers are within ten feet of hard surface for
change -out by a boom on a line truck. Transformers must be placed within an
enclosure meeting the clearance specifications of Light and Power. Such
enclosures shall use similar materials as found on the buildings but gates may
be metal or wood. Please provide a detail or a note on the plan stating this
treatment.
29. Light fixtures need to be specified. Please provide manufacturer's specification
sheet for both pole and the building mounted lights. Also, please include details
regarding wattage and luminarie design. The lighting of this shopping center will
be complex due to the need for illumination in some areas and reduced levels in
other areas. Lighting on the north elevations will be carefully reviewed. The
P.U.D. must control lighting which may require submittal of a lighting plan. The
lighting plan will be reviewed by Light and Power so that the site is not over -
illuminated.
30. From an operational standpoint, it is not clear where all the step vans and soft
drink trucks unload. Does this happen in the service area on the east side of
Safeway? Would this service drive benefit from a gate that can be kept closed
after normal delivery hours? Please clarify on the plans.
31. Please indicate the materials and height of the screenwall on the east side of
Safeway and behind Building B.
needs to a direct, convenient pedestrian system that is not convoluted by
indirect routes and 90 degree angles. Parking stalls and drive aisles should not
disrupt a simple, continuous pattern of buildings, streets, and sidewalks. This
may mean losing a parking space or two. Staff realizes that the Pad sites are
illustrative only but we want to set the tone for the end -users. (See Attached
Sketch.)
20. Staff is concerned about the sizable amount of the 80 foot setback zone taken
up by stormwater detention and the water transmission line. As you are aware,
this area bears the burden of screening the shopping center and providing an
urban design enhancement for the Harmony Corridor. If berming and
landscaping are severely restricted due to these utility conflicts, then
opportunities for buffering and screening must be shifted north. This may result
in the loss of the parking bay just north of the 80 foot setback zone between
Buildings G and H. Please recall the condition of approval at Preliminary which
stated:
"At the time of submittal for Final P.U.D., additional landscaping shall be
provided within the '80 foot buffer along Harmony Road."
21. The area in front of Safeway designated as textured concrete paving is an
excellent design element that will help reduce the vehicular/pedestrian conflict in
this area. Since this drive aisle directly connects McMuny to Wheaton, there will
likely be considerable traffic flow crossing this area. In order to further reduce
the conflicts, Staff recommends the use of curb bulges on both ends of the
textured concrete paving area to reduce the lane width from 30 feet to 24 feet.
This narrows the perspective for the driver and reduces the exposure for the
pedestrian. Also, by narrowing, there will be less temptation for drivers to use
this area as a °drop -off -and -wait zone.'
22. Pads E and H indicate a drive-thru capability. Please recall the comment that
was made back on February 8, 1996 that Neighborhood Shopping Centers in the
Harmony Corridor allow only standard and fast food restaurants, not drive-thru's.
Drive-thru banks are permitted, drive-thru restaurants are not. If these pads are
for banks, there appears to be limited opportunity for multiple stations that banks
seem to favor.
23. Where drive-thru lanes conflict with pedestrian sidewalks, please provide raised
textured concrete crosswalks to minimize the danger.
24. A detached sidewalk should be added to the east side of the north -south drive
aisle that connects Harmony Road to the plaza.
25. On the southeast comer of Building H, a crosswalk should be provided
connecting the pad to the sidewalk that leads out to the meandering walk in the
pedestrian crossings and ramps are at locations where vehicles will not be
blocking the crosswalks. Please show signing and striping at this intersection.
16. Signing and striping plans are required for streets, driveways, and intersections
adjacent to the site such as Harmony, Wheaton, McMury and at the intersection
and driveway entrances.
17. The Harmony Water Transmission Line is located in the 80 foot setback zone
behind the meadering sidewalk. There may be conflicts between trees and this
line. Generally speaking, trees should be kept 10 feet away from this line.
Please note that the Harmony Corridor Design Standards and Guidelines state:
"As part of the preliminary development review process, the applicant
shall submit a drawing to the City for its approval which graphically
illustrates the water transmission main location, tree placement and
grading concept. The drawing shall demonstrate that the tree and berm
placement does not unnecessarily interfere with the City's water
transmission main and the operation and maintenance thereof."
18. Comments from the City's Stormwater Utility will be made under separate cover.
In general, if storm flows are released undetained, then improvements to the
downstream conveyance system will be required.
Part Two - Site Plan
18. Staff is concerned about the configuration of the building and parking lot of Pad
I. The placement of a the parking lot between the drive aisle and the front of the
building is an image that we are striving to minimize. This image is auto -
dominant and promotes the strip -commercial aspect of the shopping center.
This building should be shifted such that the front and long axis face east. The
parking lot is then located. between the building and the Safeway enclosed
loading area. The short axis faces the drive aisle and can be upgraded with a
second entry. The pedestrian access connecting to Iva Court remains in a
landscaped area. This side -mount placement of Building I will be framed on the
south by the side of Building H. A strong pedestrian connection is formed with
Building H in that pedestrians do not have to cross a hostile parking lot. In this
configuration, both buildings combine with landscaping to create an attractive
streetscape that more like a real town rather than a typical shopping center.
(See Attached Sketch.)
19. Pads E, F, and G can provide better pedestrian connections by eliminating the
inconvenient curves and the six 90 degree turns in favor of a sidewalk system
that reflects the way people navigate. As presently shown, the four foot sidewalk
system merely lines the parking and driveways as an after -thought. There
at the developer's expense.
6. The City of Fort Collins Light and Power Department cautions that the
transformers on the north side of Lots 1, A, B, C, and D, must be accessible by a
line truck for emergency change out.
7. Please add a note under "General Notes" that Safeway agrees to construct
speed humps on Ticonderoga according the location and design as specified by
the City of Fort Collins Transportation Department. Also, please be aware. that
the obligation to construct these traffic control devices will be a section in the
Development Agreement.
8. The Poudre Fire Authority cautions that the proposed buildings exceed 5,000
square feet for type V construction and must be fire -contained, construction type
upgraded, or fire sprinklered. This applies to all buildings except H and E which
are less than 5,000 square feet.
9. If the right-in/right-out is allowed, the right turn acceleration and deceleration
lanes will need to be continuous between Wheaton and McMurry since this
distance is so short.
10. Until the status of the right-in/right-out access is finalized, it may be difficult to
establish the point at which the 80 foot setback is measured. The 80 foot
setback must be measured from the future edge of pavement. The requirement
for turn lanes, onstreet bike lanes ( 8 feet wide), and break down lanes may
render this future edge of pavement a moving target. Consequently, the 80 foot
setback zone should be measured to allow for the maximum contingency for
pavement needs in order to be conservative and prevent problems with setback
violations for the future pad site development.
11. The centerline of Monte Carlo and the centerline of the entrance to Kruse
Elementary must align. Please re -design.
12. Show the driveways for Rockbridge Condos. Centerlines of driveways on
opposite sides of the street must align.
13. The narrowing of Monte Carlo Drive will require resolution of utility conflicts and
submittal of numerous details. There are many utility, drainage, and other
physical complications associated with narrowing of Monte Carlo. Please refer
to the Project Comment Sheet from Engineering for further clarification.
14. Additional easement and right-of-way dedication may be necessary to
accommodate the ultimate design for Monte Carlo both on -site and off -site.
15. Be sure the intersection of Monte Carlo and McMurry is designed so that
July 19, 1996
Mr. Dennis Wyatt
Wyatt & Associates
1865 South Pearl Street
Denver, CO 80210
Dear Dennis:
Staff has reviewed the request for Harmony Safeway Marketplace Final P.U.D. and
offers the following comments:
Part One - Utility and Engineering Comments
As you are aware, the Colorado Department of Transportation has not granted
approval for the proposed right-in/right-out on Harmony Road. Although these
plans have been allowed to be submitted for review, unless permisssion from
CDOT is obtained for the access by August 7, 1996, the P.U.D. will not be
forwarded to the Planning and Zoning Board for consideration on August 26,
1996. This comment has been made to Kathleen Krager, transportation
consultant, in a separate letter. Due to the importance of obtaining this access,
the comment is repeated here for emphasis.
2. U.S. West requests that the utility easements along the north and east be
widened in order to have proper horizontal clearance for the lanterns (north) and
all applicable underground utilities.
3. The sidewalks indicated on the landscape plan do not match those on other
sheets. Please clarify.
4. U.S. West is also concerned about placing utilities under berms. It is requested
that grades be nearly level in the easement areas.
5. It appears that the sidewalk along McMurry Avenue conflicts with existing
telephone pedestals. U.S. West would relocate its facilities at the developer's
expense. Due to the high cost of such relocation, U.S. West recommends that
the sidewalk be designed to curve around these pedestals. Please be aware
that any relocation of existing telephone facilities. required by these plans will be