Loading...
HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE PUD - FINAL - 33-94B - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS37. See plan revisions on landscaning plan. 38. Median islands added to these locations per site plan revisions. 38a. Requested notes and design criteria have been added to the cover sheet. 39. Refer to notes and roof locations shown or. the site plan. Refer also to building cross section submitted under separate cover. Narrative Responses September 4, 1996 Page Four 40. (Noted as 50 on staff comments) This note has been added to the landscape plan. ENGINEERING DEPARTMENT COMMENTS. Refer to attached narrative responses from Northern Engineering. Note the the substantive comments were from the Drainage Department and were related to overall evaluation of the previously approved and constructed community drainage facilities. Since this plan was previously approved and the subject site was a part of the original plan, we proposed to drain to the facilities as planned. See attached letter from the property owner, Bill Tiley, concerning maintenance of the system and comments from the Drainage Department for corrections to defective downstream improvements adjacent to other properties. Safeway intends to comply with the requirements of the original drainage plan, as modified by the site specific engineering and design modifications but is not in a position to either validate the original approved plan or make major improvements to the originally constructed improvements. Safeway will pay all required drainage fees and present detailed engineering studies describing our compliance, with modifications as required, to the originally approved plan. Please review the attached material and let us know if you need any additional data at this time. Cordially, 11'yatt stir Associates, P.C. Dennis W. Wyatt, NCARB 23. See notes # 18 and 422 above. Narrative Responses September 4, 1996 Page Three 24. No sidewalk has been added to this location. It appears that there will be limited pedestrian traffic in this area, and a single sidewalks will adequately serve the need and the area proposed for sidewalk can be landscaped. 25. A general note for this pedestrian link has been added to the site plan pending submittal of detailed plans. 26. A note to this affect has been added to the design criteria for pad development shown on the cover sheet. 27. A note outlining this requirement has been added to the cover sheet design criteria. 28. Notes have been added requiring masonry enclosures around the trash enclosures. Final requirements will be reviewed with Light and Power upon sizing of the actual transformers. 29. Light fixtures specified on drawing and specification cut sheets are submitted under separate cover. A detailed site lighting computer generated photometric layout has been submitted under separate cover for review. Ground mounted wall -wash flood lights have been added to the rear elevation of the Safeway building. 30. Site plan modified to illustrate vendor service truck locations. 31. Note added on plan to detail requirement. PART THREE - LANDSCAPE PLAN 32. See revised landscape plan for revisions. 33. Revision noted on landscape plan. 34. Pad sites deleted, see design criteria on cover sheet. 35. Pad sites deleted, see design criteria on cover sheet. 36. See notes on plan, perimeter landscaping as shown to be installed with Phase I construction of Safeway building. Narrative Responses September 4, 1996 Page Two 10. Based upon current understanding of the lane width requirements, the 80' setback along Harmony Road will not be affected. See site plan details. 1 l . Plan changed to reflect required conditions. 12. Rockbridge Condo access driveway now illustrated on the site plan. 13. Entire cross section of Monte Carlo now changed on site plans per agreements as a result of meetings with the City Engnnnering Department and the neighborhood association Board of Directors. 14. An additional easement on the south side of Monte Carlos has been added to allow for the revised 8' sidewalk on the south side of the street. 15. Plan revised to allow for required alignment. 16. Preliminary striping plan is included for Monte Carlo and Harmony Road per site plan. Additional details to be provided upon review by city and upon preparation of site construction plans. 17. Potential conflicts with new water main have been reviewed and landscape plan changes have been made. 18. See comments below for Stormwater Utility. PART TWO - SITE PLAN 18. (Should be item 19) Requirements per comment have been included in the Design Criteria notes on the cover sheet. All detailed pad designs have been deleted from the site plan per our staff meeting discussions. Each pad will be required to be submitted for future review by the City of Fort Collins and issues will be addressed at this time. 19. See comment # 18 above. 20. Additional landscaping has been added to the landscape plan in this area. 21. Curb bulges have been added to the plan as requested. 22. Drive-thru comments to be addressed per note 18 with future submittals. WYATT &ASSOCIATES, PC..X AL ARCHITECTS and PLANNERS September 4, 1996 Mr. Ted Shepard Senior Planner 281 N. College Ave. Ft. Collins, Colorado RE: Narrative Responses to Final P_.U.D. staff comments Dear Ted: The following are narrative responses to staff comments of July 19, 1996. They are presented in the order they were received per your letter. Part One -Utility and Engineering Comments 1. See attached letter (under separate cover) from C.D.O.T. concerning approval of proposed access from Harmony Road. 2. A new 15' easement has been added along Monte Carlo and McMurry as requested. 3. Plans have been modified to coordinate sidewalk locations. 4. We will work with U.S. West during the construction document phase to limit the berms above telephone lines to the greatest degree possible, without hindering the design intent of the berming. 5. Sidewalks have been rerouted around telephone pedestals are required. Verification of field conditions may further dictate adjustments during the construction document phase. 6. Sidewalks have been widened and radius dimensions increased at sidewalks adjacent to proposed electrical transformers to allow for the infrequent need to back up a serve truck to these locations. They may back up to the areas across the perimeter curbs. 7. Required note added to the cover sheet, and site plan illustrates graphic locations of required speed undulations on Monte Carlo St. 8. Building construction plans will reflect this requirement and a note has been added to the site -plan. 9. A continuous turn lane has been provided on revised site plan. 1865 so. pearl st., denver, colorado 80210 (303) 698-1717 fax (303) 778-6004