HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE PUD - FINAL - 33-94B - CORRESPONDENCE - TRAFFIC STUDY (3)From:
Eric Bracke
To:
FCI.CPES.TSHEPARD,
Date:
12/23/96 9:23am
Subject:
Harmony Safeway
FCI.ENG_NET.GDIEDE, FC1.ENG_NET...
The following traffic mitigation measures need to be define in the development agreement with the Harmony
Safeway, developers:
Au0 ray boa
Safeway will design and buildrand include within the Utility Plans include:
1. Design of the traffic circle at the intersection of Ticonderoga and New Bedford.
2. Landscaped median on the east leg of Ticonderoga and Lemay.
The City will design, build, and charge the Safeway development for the following:
1. 3 speed humps on New Bedford
2. 4 speed humps on Ticonderoga
3. 2 raised crosswalks on Monte Carlo (include in Utility Plans)
4. 1 raised crosswalk on McMurry(in front of school, existing crosswalk)
5. 1 raised crosswalk on Ticonderoga (@ Tewksbury)
I have some specific ideas on the design of the traffic cirlce and would like to set up some time with you to discuss
the design.
-Eric