Loading...
HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE PUD - FINAL - 33-94B - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCommu_-_ry Planning and Environmental , ervices Current Planning January 3, 1997 City of Fort Collins Mr. Dennis Wyatt Wyatt and Associates, P.C. 1865 South Pearl Street Denver, CO 80210 Dear Dennis: As you prepare Final P.U.D. documents for recording Harmony Safeway P.U.D., please add the following information regarding offsite traffic calming onto the P.U.D. cover sheet or site plan: Safeway will design, build and pay for. A. One traffic circle at the intersection of Ticonderoga and New Bedford (Show on Utility Plans.) B. One landscaped median on the east leg of the Lemay and Ticonderoga intersection. (Show on Utility Plans.) The City will design, build, and charge Safeway for the following: A Three speed humps on New Bedford. B. Four speed humps on Ticonderoga C. Two raised crosswalks on Monte Carlo. (Show on Utility Plans.) D. One raised crosswalk on McMurry in front of Kruse Elementary. E. One raised crosswalk on Ticonderoga at Tewksbury. For those items that are to be shown on the Utility Plans, please coordinate with Northern Engineering. The City's Transportation Department has some specific ideas on the design of the traffic circle. Northem Engineering should contact Keene Ashbeck and Eric Bracke for further details. Since the above items are offsite, they need only be listed on the P.U.D., not shown on the Site Plan unless convenient. Please do not hesitate to call if you have any questions. It is our hope that these final details can be worked out so that final documents can be recorded in a timely manner and not hold up the construction schedule. Sincerely: . l — � Ted Shepard Senior Planner xc: Kerrie Ashbeck, Civil Engineer Eric Bracke, Traffic Engineer Bud Curtis, Northern Engineering, 420 South Howes Street, Suite 202, Fort Collins, CO. 80521 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 FAX (970) 221-6378 • TDD (970) 224-6002