Loading...
HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE WTE (SPRINT), LOT 8 - PDP - 33-94H - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT NARRATIVEnot only the coverage area surrounding this site, but also the coverage areas of adjacent network sites. Since their induction, wireless telecommunications systems have proved to be an invaluable communications tool in the event of emergencies (traffic accidents, fires, etc.) and'natural disasters (earthquakes, floods, etc.) where normal land line communications are often disrupted, overlooked, or inaccessible during and after an event has occurred. This service and similar technology are utilized by numerous governmental and quasi - governmental agencies that provide emergency service. Wireless telecommunications systems, including cellular telephones, have also proved to be invaluable tools in business communications and everyday personal use. In this use, telecommunications system networks have proved to be desirable in the interest of public convenience, health, safety, and welfare. Coverage Objective Sprint PCS's objective is to provide upgraded coverage to the residential, business & emergency services needs of Sprint subscribers in the City of Ft. Collins. Introduction to AFL Telecommunications AFL Telecommunications is the general contractor for the Sprint PCS Keebler Project, responsible for site acquisition, zoning and construction management for Sprint Sites within the West Region. If you need additional information, please feel free to call Denise Griffin at 720-252-9840. Land Use Code: The proposed wireless telecommunications equipment is in accordance with the City of Ft. Collins Land Use Code (3.8.13) (A) Location. The proposed wireless telecommunication clock tower and equipment will be attached to the rooftop an existing building. (The building is currently under construction) (B) Co -location. Additional wireless telecommunication providers can collocate on the same building as Sprint PCS. (C) Setbacks. The proposed facility is not a freestanding tower or monopole. However, it does meet the setback requirements of one (1) foot for every foot of height. The facility is approximately 71' from the rear (North) property line, 50' from the right side (East) property line, 153' from the left side (West) property line and approximately 178 feet from the front (South) property line. (D) Stealth/Architectural style/color. The stealth clock tower design and screened equipment are consistent with the architectural style of the new building and surrounding architectural environment. All exterior materials utilized will match the color and texture of the building. The facility is compatible with the surrounding natural environment. (E) Equipment. The antennas will be concealed inside of the clock tower. The BTS equipment will be screened in a manner compatible with the building's design, color and material. The highest portion of the new rooftop is 29'. The highest portion of Sprint's proposed clock tower is 42'. (F) Interference. Sprint PCS will operate within the FCC authorized frequencies, which will not cause interference with authorized radios, televisions or computers. (G) Access Roadways. The current access roads are capable of supporting emergency response equipment. (H) Airports and Flight Paths. The facility is in compliance with the FAA. Sprint PCS — Request and Justification This site is needed to provide additional cell phone coverage in the area of Harmony and Lemay and Harmony and College Avenue (to include the surrounding areas) in the City of Fort Collins. In an effort to make the facility work best to serve the customers we propose to install this telecommunication facility at the Harmony Market Place Shopping Center. The selection of this site was determined with the following parameters: • Local topographic and geographic features • Ability to mitigate the antenna mounting structure's visual impact • Compatibility with existing land uses and zoning • Ability to lease with a landlord Integrating the proposed facility into the existing network will ensure that Sprint PCS is able to meet its commitment to the public to provide the highest quality service. To accomplish this goal, Sprint's sites must be placed in precisely calculated positions. Because all the sites in the network function together, the location of this site will affect To: City of Ft. Collins, Current Planning Department From: AFL Telecommunications Subject: Planning Objectives Wireless Telecommunications Equipment Review, Harmony Market Place, 1414-B E. Harmony Road, Ft. Collins, CO Sprint Site Name: Harmony Market Place DN60XCO83 — A PROJECT CONTACTS Applicant: Sprint PCS 6391 Sprint Parkway Overland Park, KS 66251 Agent: AFL Telecommunications Network Services, Inc. 2771 West Oxford, #7 Englewood, CO 80110 Contact: R. Denise Griffin Office: 303-730-0659 Cell: 720-252-9840 Fax: 303-730-0656 Property Owner: SB properties #22, LP Contact: Rick Lamont c/o Barclay Group 15974 N. 77`h Street, Suite 100 Scottsdale, AZ 85260 Office: 602-300-7369 Property Zoned: HC (Harmony Corridor) Lessee: Sprint PCS Access: Existing access Utilities: Electric from existing service. Telephone from existing service. Project Description Sprint PCS holds a low power wireless FCC license for Wireless communications. This proposal consist of the installation and operation of 9 antennas (3 of which will be for future use) concealed inside of a new 10' x 10' clock tower built on the roof top of the new Harmony Market Place retail building. The Base transceiver Station (BTS) equipment/cabinets will also be located on the roof of the new building and concealed with screening. This location of equipment has been coordinated with the property owner's representative, so that this wireless telecommunication facility will not impact the functionality, use, and aesthetics of the property.