HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE, LOT 8 - PDP ..... MAY 1, 2003 P & Z BOARD HEARING (CONTINUED FROM APRIL 10TH) - 33-94G - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTS(d) Visual integration of fences or walls: providing plant material in
conjunction with a screen panel, arbor, garden wall, privacy fence or
security fence to avoid the visual effect created by unattractive
screening or security fences;
(e) Landform shaping: utilizing berming or other grade changes to alter
views, subdue sound, change the sense of proximity and channel
pedestrian movement.
Lot 8 Harmony Safeway Marketplace
1996 Prelim. P.U.D.
Total Sq. Ft. 115,780
Bldg. Sq. Ft. 6,600
Parking 31
Ratio 4.7/1,000 sq. ft.
2003 P.D.P.
122,074
9,900
49
4.9/1,000 sq. ft.
H.C.P.
130,000
From the Harmony Safeway Marketplace, Preliminary P.U.D., #33-94A, Staff
Report of April 22, 1996:
"The Safeway will be setback from Monte Carlo by 60 feet. The berming
behind the other retail buildings will be less substantial due to the smaller
building forms resulting in less mass."
Applicable Landscape Standard Section 3.2.1 (E):
(E) Landscape Standards. All development applications shall include landscape
plans that meet the following minimum standards:
(1) Buffering Between Incompatible Uses and Activities. In situations where
the Director determines that the arrangement of uses or design of
buildings does not adequately mitigate conflicts reasonably anticipated to
exist between dissimilar uses or building designs, one (1) or more of the
following landscape buffering techniques shall be used to mitigate the
conflicts.
(a) Separation and screening with plant material: planting dense stands of
evergreen trees, canopy shade trees, ornamental trees or shrubs;
(b) Integration with plantings: incorporating trees, vines, planters or other
plantings into the architectural theme of buildings and their outdoor
spaces to subdue differences in architecture and bulk and avoid harsh
edges;
(c) Establishing privacy: establishing vertical landscape elements to
screen views into or between windows and defined outdoor spaces
where privacy is important, such as where larger buildings are
proposed next to side or rear yards of smaller buildings;
tally constrained areas, the FAR should be adjusted ac-
cordingly.
MAXIMUM FLoOIZ
AREA pol- ^ /
F. A . 2 . OF o. 2
= 8 ,712 Se. FT. e.
FLOO(L A2EA aT10
F::-A. FZ- _ TOTAL FSUIL01pjr FLpp
AREA
TOTAL
Figure 39
FLORICULTURE L of 8
FLOWMETER Lda� -
/i 166 es the rate
FLUE GAS L a r AX" = S $� 3 -x !
stion that
FLUME
9,900 _
FLY ASH SS, 3 �' � 0 107 g
d in a gas
FLY-LN DEVELOPMENT
-ated with
creational
.., ...
FOOD PROCESSING An establishment in which food is processed or otherwise
ESTABLISHMENT prepared for eventual human consumption but not con-
sumed on the premises.
120
FO
PROJECT
COMMENT SHEET
City of Fort Collins
OM
Current Plannine J
DATE: October 22, 2002 TO: Traffic Ops
PROJECT: #33-94G Harmony Safeway Marketplace, Pad 8 PDP —
Type I (LUC)
All comments must be received by Ted Shepard no later than the staff
review meeting:
November 20, 2002
Note - PLEASE identify your redlines for future reference
RF
c
or"
�q 2g ^ O
9FNTA� �✓��
N��NG
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape of Fort colons
No Text
No Text
Naw Tran
Cwcrwm
1.102* RIV
COBBLEl
(3)Aci;r—
z ..;(72)Rupo
plat Oam".01".s—
hag.&2 ;1
(12)EUN
LOT 8
HARMONY SAFEWAY MARKS
LOCATED IN THE SOUTHWEST QUARTER OF SECTI
NORTH, RANGE 68 WEST OF THE STH PRINCIP,61 kAEF
COLLINS, COUNTY OF LARIMER, STc F
xkotn W�qfy —
lm lovmal
(6)JUMP
CmrWdtDE3dst4'
wAlh
--licaring DOW100:1 &
amadmor Junipers 10
Remain.
Extwmg Transtomor
to Ramon.
%I-
Fi ngcunRorft
:mmin,
r'j b mm
at
(73)Rupe '
S'.in aarvics snail be hi &
------- (2)Acgr Mortar Pt sw t1Z , ftm buildov.
Ex" 2.1/r Hon►- _—.r :
che=1"'ha"'
i!\SnreinFklkem
r Rn
I0.
Fx" Turto Remn
AMMS mx1adnV10Awsmn
(E) SAEFWAY
\FXI V AWb%%n Ww Woram.ExROWgTufIJrm(Fair Condftn) SUILZMG
�w M W Removed ASPEN MULCH
.�cryp)
Exlg-g3ft RilnAwtun
Ah(E Co ltiv.LsbngI.rVhal w w Remmm
A21 (002d) W.be Rsmwsd (3)Jm
'V
(3)EuxI
Exiobng 3* While Exfftng 3.12- White Annuals
Asn,(FiwCqndon) Ash (Fair Condition) X 0il !,\ ..%"I Annuals
to Rmwecl to be Romwoo Existi (12) Mlxed
Perenroats
1.1,21 RIVE
'0'88'L.E P.) ExIffUng 40 WhIa
Aar (Faw Condmon)l
'M " L III) be RMWed % Exwwg
WWII Rhow Rwk
(5)EW11 1) MIN Cobble
01 I'musle man
X
ID Remain.(5)JUMP
i. (3)C4wB
STEEL- E
(a Milled EDGING
S=
TIN nroAfs (ryp.) to R@=IrL
MULL (6)JuvaB
(ryp) )(7)Co"s
1-12'RIVER ROCK
0 to Remin. COBBLE (rYP.)
Zz.
(3)E"l (16 1 B (S umP,- TURF
Fx
(3 u 1 C7 Cry-P,)OCIICONCrp
[I)Fm 1-Irr RIVER ROCK V-PAW"
COBBLE (TYP.) 7) 111
m Ram
4)Rhor \
(5)JMhA (24) MIXed —ExhatIN
(6)JIMS peni Dog� &
smori
Monumm (s)JLTnvP rnap imparsw
a go (I)Fm
(3)Ma ROMMM
Rmv . . �A B)CICI (4)Rhor STEEL (3)MmW 1.1f., RIVER
to Remirt W)A6E (4)Fapop )JuchA (Il W19 EDG11 0 ROCK
ASPEN MULCH COBBLE
(Mid cryp.) 7) cryp)
=Tud (2)Fm
zin 14r R R am
S.. R Bl. 183
IV I.. A I.. , .) A I,
Rernallm.. 1.
71
ail= r, R
L;
C2)Fm
ExIsift Tuft
(6)jusmS Eximill -to Romin
jury
&54j Hai jo Ro=k
Remove EX r G.V. lnfftml r
Pop &T.B.orEX. TEE.
Ex=
�"=dldawt0shubPR.Blr1
0
ff
ohk " . I kWh
I-ANDSCAPE PLAN G'w
LOT 8
HARMONY SAFEWAY MARKETPLACE
LOCATED IN THE SOUTHWEST QUARTER OF SECTION 31, TOWN
NORTH, RANGE 68 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY I
Nla TRAMOKPMR COLLINS, COUNTY OF LARIMER, STATE OF COLORADO.
W C04CMM PAD
cvMmc?1 T
FlGLN: "T
WLLK cowmll
ZONED rWe a' WOW nAaawr /
crr '� ac,vaN WELL To nAfeN''
[ [o wo
O� / / • 010ft"rq'LAC7 rU
9NIM0 I VIA*MaN TIO
Mae ro R gvV
mm
\ O /rA) WALL SAD( qp JUKE R a aTAL
LWNTi
am I I I` r[, aANnnRr aeu+a
tacATlom
o•urRrcr /\f / �' � i - � •� 6 `• oRAwAw IrtUIr
[Aaan[NT / / - ' [AaRTerl
I I 1 •u✓
\ 9.E00 aq fl \
` RETAIL LY I _ ?E
.SPRINCLED I IX
Maim
902WAX Y10 —OT 43
1P
q, aNRTIN; ,a ---. v. I ZONED Nc k` � � \\
- \au SC ►: ' V
en
AS T
,o
`1 I-ANC04CMTI rALLer
_ \oowLylO" ..if 1 t r •m
%Qf1acTNJ11 10 r4L•LIC \ .. 1 a �-d '• �`
L.T
W ` \�
' X 1 a /' LANpaCMMI
ilea \ \
/ n.AaN aNctoww �� lI1LOari nAi[RIALI
r 1 A r[1 To uIL y• •m \
I Q a mn \
Is
r
II � LANDaG.MfIG ,�, LA/DaCAAb ' , �
1 I — J L— Nu COLo cVrLITTNTuso _ _ �T[ASPUALT,
[AaQ1aNT �' — rAVaa\ ACc[w
r
I_ • `
rTLIIT w �r[1 abaWax
�uTtinr S ��
I [Aa@YNT \♦ PROMMT LOG / \
I _ i
qnw i
NroRArlr i
a
I 1 1 LOT 1 / I
ZONEDWC
01 ENLAWiED SITE 1°LAN aCAL[. r'.]r.P NORM
1 �
I VILLA" YN q A 1,••I'
I PAWM 40
1 •
LOT '1
fONlD MC
0
mm
OL
KND R
TDTAL 00 It µp.•
LOT , a.D
60RUAT WIT 4006
IOhD Mc
HARMONY SAFEWAY MARKETPLACE
LOCATED IN THE SOUTHWEST QUARTER OF SECTION 31, TOWNSHIP 7
NORTH, RANGE 68 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT
COLLINS, COUNTY OF LARIMER, STATE OF COLORADO.
•I
o:
• I -
' • �OTIL 1•Y
PARKING CALCULATIONS
TOTAL SITE BUILDING AREA a 122,074 SO FT
VAX, ALLOWABLE PAWAG STALLS
CARs
TOTAL PARKING STAALLS ALL LOTSs/IOOD So) 10 • 6608 CAR*
EXCEPT (LOT 8)
ALLOWABLE LOT 8 PAM* STALLS . 102 CAR*
PROPOSED PARKING STALLS LOT 8 . +g CAR*
TOTAL STALLS AFTER LOT 8 DEVELOP ENT - 668 CAR* )
� I
TOTAL Na R z#A *,
LOT 3
I
I
I
I
I
I
I
I
I
I
T •�
I•• I
SArN4r OM PAD •a IT l,N* • w4 •a FT f)U 1
y I PAIYCNG • i PAWD 1I* PAJW.M N 1
Oa rr �,ccb 1
• LOT
LOT
-
------ - LOT I Awcw x
I
�-------- 1
wo
a I
L O'
rrr•rrn ir.'r.�T.si -frr � � � .�_�
i•�7i�
HARMONY ROAD
d
�I d
RA
00-0
VP
p , iY•Yp
J � 1 ,+�•��rr �y�`�q�j�'
` B •... _ ~af\i�.I-. ::vim - w'\'.• `. Y.i// � �ti t�E ��`\ I
• � .. .. � .may - -� - _ - -- - _ - _
_ o. �(�q � .- T.+n.....; - �o d�::::. 'o.oa' o ofpl r. _ - . •^ . _- \ u
\ u IAYAi nrNt .y . 1.) 1y-�_.__.
it
J
i va r� • - '� ;i CL
W
Q
. � 9
,. r i
i
t
-
•._..-..... ........Y...... _...-_
-
- -
OiA •
MAVOWRw
rnt uu•w � _ �� 6
MV
2LL
�Yr1oY •. V
+.t...+.... KMWOW--- SAFBUY HARKl1PL ZE
�-� �. I p 2 of 5
a nw.u,a
OR/G/NAG Ile P(/.D A/PAsvEo AP,c14 a.t, /94G
�♦aa
C
Cahen Architectural Group P.C.
LOT 8 — HARMONY MARKETPLACE
Southeast Corner of Monte Carlo Drive and Wheaton Drive
Fort Collins, Colorado
STATEMENT OF PLANNING OBJECTIVES
This project consists of the development of Lot 8 of the Harmony Marketplace. The 9900
square foot retail building shall house multiple tenants providing convenience services for
the surrounding neighborhood. The allowable building area and parking stalls provided
comply with the overall design guidelines for the entire shopping center.
The buildings are designed to compliment the existing shopping center, both the main
tenants as well as the out -parcels. Similar building materials and coloration shall be used
to create a cohesive design. Warm earth tone colors, strong horizontal elements and
pitched roof forms will create a smooth blending of the multi -family residential structures
surrounding the site.
The site is to be fully landscaped in and around the perimeter and a strong buffer of plant
materials shall be installed between the rear of the structure and the neighborhood to the
north. Plant species and character shall match the existing plant schemes found
throughout the existing shopping center. No wetland areas on on -site and thus no
negative effects exist.
Pedestrian and bicycle traffic have direct access from the public way both from perimeter
sidewalks and the internal walking path which is existing and lined with decorative light
fixtures.
It is anticipated that the building will house approximately four (4) tenants at its initial
occupancy. Wall mounted signage shall be employed to identify each tenant on the
stucco band facing south towards Harmony Road. One ground sign is planned with
multiple tenant text to identify the buildings tenants from the adjacent traffic from the
existing Safeway Store. It is anticipated that this development will employ approx. 16-20
people.
As part of the existing Harmony Marketplace, the Owners shall maintain all common areas
including all landscaped areas, traffic control, snow removal and other periodic
maintenance.
-TWO TAMARAC, 7535 EAST HAMPDEN AVENUE, SUITE 425, DENVER. COLORADO, 80231 . (303) 743-0002 • (303) 743-0005-
No Text
Lot 8, Harmony Safeway Marketplace PDP, # 33-94G
May 1, 2003 P & Z Meeting
Page 8
A. The land use, retail and commercial services are permitted in the
Harmony Corridor zone district as part of a Neighborhood Shopping
Center, subject to Planning and Zoning Board Review.
B. The P.D.P. complies with the Land Use and Development
Standards of the Harmony Corridor zone district.
C. The P.D.P. complies with the applicable General Development
Standards.
D. As a result of the P.D.P., the shopping center continues to comply
with the standards for a Neighborhood Service Center as per the
Harmony Corridor Plan.
E. A neighborhood meeting has resulted in changes to the landscape
plan that meets the approval of the affected property owners.
RECOMMENDATION:
Staff recommends approval of Lot 8 Harmony Safeway Marketplace P.D.P., #33-
94G.
Lot 8, Harmony Safeway Marketplace PDP, # 33-94G
May 1, 2003 P & Z Meeting
Page 7
The neighbors have agreed to these changes based on information provided by
the City Forester. The applicant has agreed to make these changes and they are
reflected on the latest plans.
5. Compliance with the Harmony Corridor Plan:
In addition to the standards contained in the Land Use Code, the P.D.P. must
also comply with the standards for a Neighborhood Service Center as stated in
the Harmony Corridor Plan.
A. Permitted Use
The land use, retail and commercial services are permitted.
B. Scale
With the development of Lot 8, the shopping center remains in compliance
with the range of acreage (7 — 20 acres), minimum number of business
establishments with separate entrances (6), overall square footage
(130,000 square feet), relationship with the neighborhood, limitation on the
size of any one retail establishment (25,000 square feet) and the limitation
on the size of the supermarket (49,000 square feet).
C. Character
Public streets surround the center. There are two connecting walkways
on the north, and along the two access drives on the east and west. A
transit stop, with connecting walkway has been constructed when and if
transit service returns to Harmony Road. The center is integrated with the
neighborhood. The plaza on the east side of Safeway provides a "social
and identity" feature. Transitional land uses and building placement has
mitigated the negative effects of noise, traffic and exhaust so that the
neighborhood is not impacted.
6. Finding of Fact/Conclusion:
In evaluating the request for Lot 8 Harmony Safeway Marketplace P.D.P., Staff
makes the following findings of fact:
Lot 8, Harmony Safeway Marketplace PDP, # 33-94G
May 1, 2003 P & Z Meeting
Page 6
The entrance is connected to the sidewalk along Wheaton Drive and to
the private connecting walkway next to Safeway.
The build -to line standard is 15 feet. Wheaton Drive slightly curves and the
building features an architectural arcade/roof projection for interest. The
average setback is 15.5 feet along Wheaton Drive.
Section 3.5.3(C)(D) — Variation in Massing and Character and
Image
The building provides architectural variety by the use of projecting
elements, covered entrance and different materials. The roof is pitched.
The facades feature two color of texture masonry. The north elevation is
articulated projecting elements for horizontal relief. With a variety of
masonry materials,
windows and doors there is a recognizable base middle and top.
4. Neighborhood Compatibility:
A neighborhood meeting was held on April 16, 2003 between representatives of
The Enclave (Iva Court) and the City Forester and the Current Planner. As a
result of this meeting, the applicant has made the following changes to the plan:
The continuous sidewalk along the north elevation will be modified
so that there will only be one stoop per door. This stoop will meet
the exiting requirements of the Poudre Fire Authority.
Where the sidewalk has been eliminated, foundation shrubs will be
planted. These shrubs will be a broad -leaf evergreen to provide
year-round color.
Five deciduous shade trees will be replaced by upright evergreens.
The species in the shrub bed between the back of the sidewalk and
the building will be replaced with a spreading juniper for year-round
color.
The three Swamp Oak trees have been replaced with Skymaster
English Oak which is better suited for the space provided.
Lot 8, Harmony Safeway Marketplace PDP, # 33-94G
May 1, 2003 P & Z Meeting
Page 5
D. Section 3.2.1(E)(5) — Parking Lot Interior Landscaping
The parking lot exceeds 6% interior landscaping in the form of islands,
which exceed the required minimum for lots with less than 100 spaces.
E. Section 3.2.2(B) — Access Circulation and Parking
Harmony Road is classified as a major arterial, Wheaton Drive is an
existing collector street and Monte Carlo is an existing local street. There
will be no vehicular access onto Monte Carlo in compliance with the
original overall P.U.D. Similarly, there is no access onto Wheaton as such
access would not have proper separation from existing access points
between Harmony and Monte Carlo.
Sole access if from the existing private drive that serves the shopping
center. This is in compliance with the original P.U.D.
Sidewalk connections are provided to the existing surrounding public
sidewalks and the private connecting walkway between Safeway and Lot
8. This will provide excellent pedestrian access to and through the site for
the surrounding residents of the neighborhood.
F. Section 3.2.2(K) (2) — Parking Lots — Maximum Number of Spaces
Parking has been calculated for both the site and the overall shopping
center, both of which cannot exceed five spaces per 1,000 square feet.
For the individual site, there will be 50 parking spaces for the 9,900 square
foot building, which equals five spaces per 1,000 square feet. For the
overall center, including Lot 8, there will be 562 spaces for 122,074 square
feet, which equals 4.6 spaces per 1,000 square feet.
G. Section 3.5. 1 (C)(E)(F) — Building Project and Compatibility
The new building will be similar to and complement the existing center.
The primary materials are textured concrete masonry, concrete tile roof,
with a brown color tone. Overall, the height, scale, roof form, building
materials, and building color achieve a high level of quality that matches
the level of quality of the various buildings within the shopping center.
G. Section 3.5.3(B)(1)(2) — Relationship of Buildings to Streets,
Walkways and Parking
Lot 8, Harmony Safeway Marketplace PDP, # 33-94G
May 1, 2003 P & Z Meeting
Page 4
C. Development Standards
(1.) Section 4.21(E)(1) — Harmony Corridor Development Standards
The P.D.P. complies with development standards of the Harmony
Corridor. It is important to note that the 80-buffer along Harmony Road is
in place.
(2.) Section 4.21(E)(2) — Site Design
The P.D.P. is part of a shopping center with cross -access protected by
platted easements. The outdoor space and connecting walkway between
Lot 8 and Safeway will be preserved. These improvements contribute to
an integrated pattern of streets and outdoor spaces.
3. Compliance with General Development Standards:
A. Section 3.2.1(C)(D) — Landscaping and Tree Protection
The P.D.P. provides full tree stocking and foundation shrubs around the
entire site. Street trees are provided along both Wheaton and Monte
Carlo Drives.
B. Section 3.2.1(E)(1) — Buffering Between Incompatible Uses and
Activities
Monte Carlo separates the site from condos to the west by Wheaton Drive
and from patio homes to the north. Overall, the setback and landscaping
along these two edges combine to mitigate any conflicts reasonably
anticipated to exist between the multi -tenant retail building and the two
residential neighborhoods.
C. Section 3.2. 1 (E) (4) (a) — Parking Lot Perimeter Landscaping
The parking lot is screened from Wheaton Drive by combination of trees
and shrubs. In addition, a row of shrubs is provided along the southern
edge of the parking lot along the internal private street.
Lot 8, Harmony Safeway Marketplace PDP, # 33-94G
May 1, 2003 P & Z Meeting
Page 3
On January 3, 1995, City Council adopted the Amended Harmony Corridor Plan
and Standards and Guidelines. The six-month moratorium expired on January
13, 1995. The lawsuit filed by the King Soopers' developer against the City was
eventually settled.
On April 22, 1996, the Harmony Safeway Marketplace Preliminary P.U.D. was
adopted. This P.U.D. complied with the new restrictions on commercial
development in the Harmony Corridor and allowed for a 48,000 square foot
Safeway grocery store.
On December 7, 1996, the Final P.U.D. for Lots 1, 2 and 3 (Safeway, Long's
Drugs and multi -tenant retail) was approved. Since then, four pad sites have
developed. These are:
Lot 4 — Centennial Bank
Lot 5 — Multi -tenant Retail (Blockbuster Video)
Lot 6 — Safeway Fuel Facility and Convenience Store
Lot 7 — Village Inn
The shopping center was originally approved under the Land Development
Guidance System. Lot 6 was the first pad to develop under the Land Use Code.
2. Compliance with the Harmony Corridor Zone District:
A. Land Use
The proposed land use, retail and commercial services, are permitted within a
Neighborhood Shopping Center in the H-C zone, subject to Planning and Zoning
Board review.
B. Land Use Standards
(1) Section 4.21(D)(1) — Harmony Corridor Land Use Standards
The parcel is"located within a designated Neighborhood Service Center.
The Harmony Corridor Plan describes "personal services" and "business
services" as primary permitted uses in such centers.
Lot 8, Harmony Safeway Marketplace PDP, # 33-94G
May 1, 2003 P & Z Meeting
Page 2
The land use, retail and commercial services are permitted in the Harmony
Corridor zone district. Since the site is part of a neighborhood shopping center,
the P.D.P. is subject to Planning and Zoning Board Review. The P.D.P.
complies with the Land Use and Development Standards of the Harmony
Corridor zone district and the applicable General Development Standards.
COMMENTS:
1. Background:
The surrounding zoning and land uses are as follows:
N: M-M-N; Existing Patio Homes (The Enclave)
S: H-C; Existing Neighborhood Shopping Center (Village Inn)
E: H-C; Existing Neighborhood Shopping Center (Safeway)
W: M-M-N; Existing Condos (Rock Bridge Condos)
The Golden Meadows area was annexed in 1977 as part of a 234-acre parcel
known as the Harmony Annexation. The shopping center was originally platted
as Tract B, Golden Meadows, 5th Filing, approved in 1980.
Originally master planned in the late 1970's, Golden Meadows was one of the
first large-scale neighborhoods in the City to propose a mixed -use development
in accordance with the Land Use Policies Plan. The objective was to create a
neighborhood with housing, shopping, employment and recreational
opportunities. All of these uses have been constructed. In addition, and not
originally anticipated, an elementary school (Kruse) was later incorporated into
the Golden Meadows Industrial Park.
In 1984, a Preliminary P.U.D. for a neighborhood shopping center, anchored by a
grocery store, was approved on the 17 acre parcel. This P.U.D. ultimately
expired.
In 1994, a Preliminary P.U.D. was again submitted for a grocery store — based
center (King Soopers). On July 5, 1994, City Council adopted Ordinance No.
103, 1994, which established a six-month moratorium on the processing of retail
and commercial P.U.D.'s within the Harmony Corridor. On September 15, 1994
the developer for King Soopers filed a lawsuit against the City for adopting the
six- month moratorium.
ITEM NO. 3
MEETING DATE 5/1/03
STAFF Ted Shepard
Citv of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Lot 8, Harmony Safeway Marketplace P.D.P., #33-94G
APPLICANT: Barclay Group
C/o Mr. Craig Cahen
Cahen Architectural Group
7535 E. Hampden Avenue
Denver, CO 80237
OWNER: Barclay Group
8145 N. 86th Place
Scottsdale, AZ
PROJECT DESCRIPTION:
This is a request for a 9,900 square foot; one-story multi -tenant retail building
located at the southeast corner of Wheaton Drive and Monte Carlo Drive in the
Harmony Safeway Marketplace. The site is the last vacant building pad in the
only neighborhood -scale center on East Harmony Road located between
Wheaton Drive and McMurry Avenue. The site is 1.27 acres in size. The parcel is
bounded by Harmony Road on the south, McMurry Avenue on the east, Wheaton
Drive on the west and Monte Carlo Drive on the north. The site is zoned H-C,
Harmony Corridor.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
This item was continued from April 10, 2003 to May 1, 2003 in order to meet with
the neighbors regarding setback and landscaping concerns along Monte Carlo
Drive. This meeting was held on April 16, 2003 and is summarized in Section
Four of this report. The issues have been resolved.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box580 Fort Collins, CO80522-0580 (970) 221-6750
PLANNING DEPARTMENT