HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE, LOT 8 - PDP - 33-94G - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject:
Planner:
4x10 •
Traffic Operations:
Date:
Engineer:
Items Requested
Redlined Items Being Returned
°=i7i
J
1O
v
m
Other Items Required
'
Y
Z
v
U
0
Other Items being
Returned
Engineering
l
I
y
Stormwater
I
Water/Wastewater
Traffic Operations
Transportation Planning
Tra nsfort
Natural Resources
Park Planning
TOTALS
Other:
I Note: All redlined items should be returned with the resubmittal/revisions.
REVISION ROUTING SHEET - 4L)uA .7.7
i III 1•� II . .L■��I /./
•
PROJECT PLANNER
ENGINEERING PAVEMENT
'BUILDINGFILE:
•
-----�-_---
LIGHT & POWER
ME
ADVANCE PLANNING
R.O.W. PLANNING
WATER CONSERVATION
POST
--------_---