Loading...
HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE, LOT 8 - PDP - 33-94G - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE RELATED DOCUMENTCif)of Ft. Collins. Colorado MAJOR STORM (I 00-YR) RUNOFF COMPUTATIONS Overland Flow Time of Concentration: T, = 1.870. I-05)L112 / 51/3 Flow, Time Concentration: _Gutter/5wale of Tt = L / GOV T�=T.+Tt Intensity (i), taken from Figure 3-1 Velocity (Gutter Flow), V = 20.3282'S'12 Calculate Tons Bv: f WJC Velocity (5wale Flow), V = 16. 1 345'5'12 PrQject: LOT 8 - 5AFEWAY Rational Equation: Q = GA Date: October 22, 2002 Overland Now '60u- :_.. .y, I nten5ity, Design Area, A Length, L 51ope, 5 T, Length, L 51ope., I V it Length, L Slope, 5 v It T� flow, Point 625m5 (acre,) C,00 C I0 (ft) (%) (min) (ft) (%) (ft/5) (min) (ft) (%) (ft/5) (min) (min) (in/hr) (cft,; I N-1 0.54 0.97 0.78 105.0 2.00 4.9 180.0 I .65 2.61 1.1 0.0 0.00 0.00 WA 6.0 8.65 4.5 2 N-2 0.33 0.76 0.61 90.0 2.00 6.9 100.0 1.00 2.03 0.8 0.0 0.00 0.00 WA 7.7 8.10 2.0 3 N-18 2.16 0.58 0.46 140.0 2.00 11.2 1000.0 0.60 1.57 10.6 0.0 0.00 0.00 WA 21.8 4.90 6.1 4 5-1 0.91 1 0.80 0.64 60.0 2.00 5.3 250.0 1.50 2.49 1.7 0.0 0.00 0.00 WA 7.0 8.25 6.0 O 0 0.00 0.00 0.00 0.0 2.00 0.0 0.0 0.00 0.00 WA 0.0 0.00 0.00 WA 0.0 0.00 0.0 O 0 0.00 0.00 0.00 0.0 2.00 0.0 0.0 0.00 0.00 WA 0.0 0.00 0.00 WA 0.0 0.00 0.0 O 0 0.00 C.00 0.00 0.0 2.00 0.0 0.0 0.00 0.00 WA 0.0 0.00 0.00 WA 0.0 0.00 0.a Runoff Coefficient Project: LOT 5 - HARMONY 5AFtWAY MAMF,:TLACE Character of 5urface Employee: W.J.0 .5treet5, Parking Lots, Roof5, Alleys, and Drives: Ku ri t.5. ... a.r. c.. n-. -from the City of Fort Collins 5torm Drain 6je Dc5icln Criteriii and Con5t Area of Asphalt Area of Concrete Area of Gravel I 0-year I 00-year 5treet5, Parkinq Walks, Parkuuj Area of Area of Lawn Composite Composite l3a5in Area Lots, and Alleys and Driveways and Drives Rooftops and Landscape Ru n off Runoff [5a5in ID (acres) (acres) (acrc5) (acres) (acres) (acres) Coefficient Coefficient I I 's� -tf- R�-\."� OrS . • 1 I M . • 1 0 i 1 � N-98 2.17 AC (N- 1 s0 t 4 AC r N-8 `%off .56 AC 79 •� YY rr V .� AP _ N- 2 AP � _ 0.39 AC '%% ` rN- 4 C Those portions of this project located within basins N-1, N-2, N-18, and S-1 are small, and the developed runoff coefficients are essentially identical to the ones assumed before. Because of this they will not have any impact on the existing drainage conveyance system or the existing detention pond located at the northwest corner of the site. I have included a copy of the revised calculations for the composite runoff coefficient for basins N-1, N-2, N-18, and S-1. Please call us at 221-4158 if you have any questions regarding this project or require additional information. Sinncerely, � William Chmelir, EIT viewed by: Aaron Cvar, PE NORTHERN ENGINEERING NESERVICES, INC. October 22, 2002 Mr. Basil Hamdan City of Ft. Collins Stormwater Utility Development Review Division 235 Matthews Fort Collins, Colorado 80522-0580 RE: Lot 8 at Harmony Safeway Marketplace Dear Basil, As a part of the approved plan set for the Harmony Safeway Marketplace, there is one lot located in the northwest comer of the property, designated as Lot 8. This letter is intended to provide you with an overview of what the impacts development of this lot will have on the existing drainage design, approved for the site. As is typically the case with pad sites designed with this project, the ultimate user generally likes to make minor changes to the approved plan. I have attached copies of the plan that was the basis of our original runoff calculations, and what the proposed site modifications include. As you can see, the changes they are requesting are minor in nature, and the original intent of our engineering and drainage design has remained intact. Our original runoff design calculations did account for areas if imperviousness at this location. The differences are listed below. Attached is a copy of a portion of the drainage basins that were associated with the Harmony Safeway Marketplace site. As you can see lot 8 is located in sub -basins N-1, N-2, N-18, and S-1. I have also attached the proposed improvements to lot 8, which served as the basis for our original calculations. Also attached is a copy of the current proposed improvements for Lot 8. To recap, the sub -basins designated with an N prefix were designed such that developed runoff would be directed towards the northeast corner of the site to a proposed detention pond, and then ultimately to the Golden Meadows Regional detention pond. Basins designated with an S prefix were designed to release into an open channel, through proposed culverts under McMurray and Innovation Drive, and also ultimately to the Golden Meadows regional detention facility. Sub -basins with an S prefix were not designed to be detained on -site, should sufficient capacity exist in the downstream conveyance system. 420 SOUTH HOWES, SUITE 202 / FORT COLLINS, COLORADO 80521 / 970.221.4158 / FAX 970.221.4159