Ms. Peggy Friesen
Galloway, Romero & Associates
5350 D.T.C. Parkway
Englewood, CO 90111
RE: Harmony Safeway Fuel Facility
Dear Peggy:
ices
SAo�
On Thursday, January 18, 2001, at the regular meeting of the City of Fort Collins
Planning and Zoning Board, the Board voted 6 — 0 to approve Harmony Safeway
Marketplace, Lot 6, Safeway Fuel Facility, P.D.P., #33-94F, subject to the following
condition: 11
Harmony Safeway Marketplace, Lot 6, Safeway Fuel Facility, P.D.P., is
approved subject to removal of the flush wall signs on the south and west
elevations of the convenience store.
If you have any questions or concerns regarding this action by the Planning and Zoning
Board, or about the Final Compliance process, please feel free to call our office at 970-
221-6750.
Sincerely:
oze—t -,00J
Ted Shepard
Chief Planner
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
�i
?Passed and adopted at a regular meeting of the City Council held the 9th day of April, A.D.
k {',
t Mayor
N A /l Y
:*e
fW
4
r�.
r .
ryX
RESOLUTION 2001-46
OF THE COUNCIL OF THE CITY OF FORT COLLINS
MAKING FINDINGS OF FACT AND CONCLUSIONS REGARDING
THE APPEAL OF A DECISION OF THE PLANNING AND ZONING BOARD
RELATING TO THE HARMONY SAFEWAY MARKETPLACE LOT 6,
SAFEWAY FUEL FACILITY P.D.P.
WHEREAS, on January 18, 2001, the City Planning and Zoning Board (the "Board")
conditionally approved the Harmony Safeway Marketplace Lot 6, Safeway Fuel Facility P.D.P #33-
94F, with the condition that there be not flush wall signs on the south and west elevations of the
proposed convenience store building; and
WHEREAS, on February 2, 2001, a Notice of Appeal of the Board's decision was filed with
the City Clerk by Galloway, Romero & Associates as representatives of Safeway Stores 46, Inc. ("the
Appellants"); and
WHEREAS, on March 20, 2001, the City Council, after notice given in accordance with
Chapter 2, Article II, Division 3, of the City Code, considered said appeal, reviewed the record on
appeal, heard presentations from the Appellants and other parties in interest and, after discussion,
decided to modify the decision of the Planning and Zoning Board by eliminating the condition
imposed by the Board regarding the flush wall signs on the south and west elevations of the proposed
convenience store building.'
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT
COLLINS that, pursuant to City Code Section 2-56(e), the Council hereby makes the following
findings of fact and conclusions:
1. That the grounds for appeal as stated in the Appellant's Notice of Appeal
conform to the requirements of Section 2-48 of the City Code.
2. That the Board failed to properly interpret and apply the relevant provisions of
the City Code and Charter, specifically the provisions of the City's Land Use
Code pertaining to signage as set forth in Section 3.8.7(E)(2) and also Section
3.5.3(D)(1) in requiring the removal of flush wall signs on the south and west
elevations of the proposed convenience store building.
3. That the City Council upholds the decision of the Board in approving the
Harmony Safeway Marketplace Lot 6, Safeway Fuel Facility P.D.P., but
modifies that decision of approval by eliminating the condition imposed by the
Board that required the removal of the flush wall signs on the south and west
elevations of the proposed convenience store building.
Galloway, Romero & Associates
Design Engineering Planning
5350 DTC Parkway
Englewood, Colorado 80111
(303)770-8884
(303) 770-3636 fax
david_moore@graa.com
April 16, 2001
Mr. Ted Shephard
Chief Planner
Community Planning and Environmental Services
City of Fort Collins
281 N. College Avenue
Fort Collins CO 80522-0580 Fax 970-416-2020
Re: Final Compliance Process, Harmony Safeway Fuel Facility.
Dear Mr. Shephard:
Please provide us with the details of the Final Compliance process to complete the Planning action on this
project. Both the Civil Engineering plans and the Building permit plans are in process at the City awaiting
the Final Compliance action.
Attached are a copy of the City Council Resolution 2001-46 and of your most recent communication on
the process.
Please call me if you have any questions.
G oway Rom ro & Associates
David H. Moore
Project Supervisor
CC: Cameron Gloss, Planning Director
Peggy Friesen, John Scales GRA
Dan Clayton, Safeway Real Estate.
Attachments:
piNsion 2.5. Final Plan
MstoN 2.5 FIN.at. PLAN
Sections:
2.5.1 Purpose and Applicability
2.5.2 Final Plan Review Procedures
Purpose and Applicability
Section 2.5.1
The purpose and applicability of a final plan is contained in Section 2.1.3(D).
Final Plan Review Procedures
A final plan may only be submitted after approval of a project development plan
for the subject property or concurrently with a project development flan for the
subject property. For consolidated applications for a project development plan
and a final plan, the applicant shall follow both the project development plan and
final development plan review procedures.
A final plan shall be processed according to, in compliance with and subject to
the pfovisions contained in Division 2.1 and Steps 1 through 12 of the Common
Development Review Procedures (Sections 2.2.1 through 2.2.12, inclusive) as
follows:
(A) Step 1 (Conceptual Review): Not applicable.
(B) Step 2 (Neighborhood Meeting): Not applicable.
(C) Step 3 (Development Application Submittal): All items or documents
required for final plans as described in the development application
submittal master list shall be submitted. The Director may waive or
modify the foregoing submittal requirements if, given the facts and
circumstances of the specific application, a particular requirement would
either be irrelevant, immaterial, redundant or otherwise unnecessary for
the full and complete review of the application.
(D) Step 4 (Determination of Sufficiency): Applicable.
(E) Step 5 (Staff Report): Not applicable.
(F) Step 6 (Notice): Not applicable.
Article 2, Page 39
2
,Ted_Shepard__Final Compliance
From: Ted Shepard
To: inet:david_moore@graa.com; Ted Shepard
Date: Tue, Apr 17, 2001 9:25 AM
Subject: Final Compliance
Hello David:
For the Final Compliance review for Safeway Fuel:
1. Application Form
2. Fee - $1,000
3. 13 Site Plans
4. 13 Landscape Plans
5. 4 Arch. Elevations
6. 3 Utility Plans
7. 2 Final Drainage Reports
8. 1 Lighting Plan
Prior to submittal, please make an appointment with our Tech Staff, Voneen or Ginger, at 970-221-6750.
We can fax the application form down or you may fill it out at the counter.
If you have any questions regarding the Site, Landscape, Architectural and Lighting plans, please call me.
If you have questions regarding the Utility Plans or Drainage Report, please call Marc Virata. We are also
at 970-221-6750.
Galloway, Romero & Associates
Design Engineering Planning
5350 DTC Parkway
Greenwood Village, Colorado 80111-3006
(303) 770-8884
(303) 770-3636 fax
E-mail: peggy_friesen@graa.com
April 24, 2001
Ted Shepard
City of Fort Collins Current Planning Department
281 North College Avenue
Fort Collins, CO 85024
Re: Final Plan Approval
Harmony Safeway Marketplace — Lot 6 Safeway Fueling
Dear Ted:
David Moore forwarded an e-mail to me regarding submittal requirements for a Final Plan Review/Final
Compliance. We have already completed the Final Plan review. When we first met in May of 2000, we
were told by you to satisfy both the Project Development Plan and Final Plan submittal requirements and
checklists, which we did. All of the requirements for both checklists were submitted and reviewed over the
past year's process. The plan has always been labeled "Final Plan Approval" for that reason.
The Fort Collins Land Use Code provides for a concurrent project development plan and final plan review
if the applicant follows both of the review procedures (LUC Section 2.5.2). That was why all of the
material was provided with the August 1, 2000 submittal. Our understanding is the only items that I owe
you are Final Plan mylars and the reduced PMT's.
Civil engineering mylars were requested and submitted February 26. Full permit sets were submitted to
Building Department on March 14 and should be nearing completion of review. One of the reasons we
went through concurrent review to obtain "Final Plan Approval" was to be able to proceed with the building
permit as soon as the hearing process was completed.
As you know, this Final Plan was not only reviewed and approved by Planning Development Review Staff,
but also through public hearings at Planning Commission and City Council. Our files contain two staff
reports containing over two hundred pages of review and analysis. Included in these packets is the staff's
statement of project compliance to the Harmony Corridor Zone District and Neighborhood Service Center
planning area, Harmony Corridor Standards and Guidelines, City of Fort Collins Land Use Code General
Development Standards and the approved Harmony Safeway Marketplace Final PUD. Another review of
these approved Final Plans is unwarranted, inconsistent with the review of the last year, and redundant.
Please confirm that we can submit mylars to complete this process.
Sinc y,
�fitCa`—
Peg en
Project Manager
Enclosures