Loading...
HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE , LOT 6, FUEL FACILITY - FDP - 33-94F - SUBMITTAL DOCUMENTS - ROUND 2 - PROJECT SUBMITTAL AND RESUBMITTAL (3)0 rs Ted Shepard Harmony Safeway Fuel Page Two The signed mylars are enclosed for City approval signatures. Engineering received the final stamped civil engineering sets and executed Development Agreement on 5/25/01. A check for the Street Oversizing Fee will be delivered to the City on 5/30/01. We request that Planning sign off on the building permit so that construction might begin by June 1. Sincerely, Galloway, Romero & Associates Peg .esen Project Manager cc: Dan Clayton, Safeway Inc. Lucia Liley, March & Liley, P.C. mO6.psf.planning mylar subrnttal.doc 1, rJ Galloway, Romero & Associates V Design Engineering Planning 5350 DTC Parkway Greenwood Village, Colorado 80111-3006 (303) 770-8884 (303) 770-3636 fax E-mail: peggy_fdesen@graa.com May 25, 2001 Ted Shepard City of Fort Collins Planning Department 281 N. College Avenue Fort Collins, CO 80522 Re: Harmony Safeway Fuel Dear Ted: 11111 MAy 2 9 2��1 Thank you for your May 15 letter outlining final staff requests. The enclosed mylars reflect the response to the items outlined in your letter as follows: 1. Thank you for the suggestion for the sidewalk/boulder/landscaping modification, however we will not incorporate it into the site design. Current Planning Staff specifically requested the current sidewalk configuration and additional landscape area at our September 15, 2000 meeting. This was again outlined in the November 15, 2000 staff comments specifically asking for elimination of the northern most parking space and an additional Spring Snow Crab ornamental tree. We accommodated staff's requests at that time and staff stated we met all of the development design standards in the final staff reports. We will remain with that design. 2. General Note 8 on Sheet One of Six has been modified to reflect a construction date of 2001. 3. Plant Note Six on Sheet Three of Six will remain on the plan. This note has appeared on all previous plans approved in the City. 4. As you know, signage is a sensitive issue with Safeway and was the subject of the City Council appeal. Since this was a part of the document read into the record of both Planning Commission and City Council, Safeway and their attorneys advise that it remain on the plan with the note stating that separate permitting is required to obtain a sign permit. 5. Thank you for the suggestion to extend the shrub bed to the sidewalk edge. This was our oversight and would have been corrected during construction. The plan is amended to reflect the change. m06.psf.planning mylar submitUd.doc