Loading...
HomeMy WebLinkAboutAUTOZONE MINOR SUBDIVISION - 34-94 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTSUMMARY OF TEST RESULTS Boring No. Depth Ft. Moisture % Dry Density (PCF) Compressive Strength (PCF) Swell Pressure (PCF) Soluble Sulfates % pH Liquid Limit % Plasticity Index % Group Index Classification AASHTO USCS Resistivity (OHM -CM) Penetration Blow/In. A -I 1-2 18.1 1 9/12 3-4 28.0 2160 4-5 21.2 4112 7-8 11.9 36/12 14-14.8 10.9 50/9 19-19.5 20.9 50/6 A-2 1-2 22.8 4/12 3-4 24.9 97.0 2380 40 4-5 20.9 10/12 7-8 16.0 29/12 14-15 4.6 19/12 19-19.3 20.8 50/4 A-3 1-2 13.0 10/12 3-4 24.7 97.0 1 3900 95 44.2 20.8 19.3 A-7-6(19); CL 4-5 21.4 4/12 7-8 18.4 18/12 14-15 12.9 32/12 19-19.5 21.0 50/6 A-4 1-2 18.0 7/12 3-4 21.0 102.4 2660 95 LOG OF BORING NO. A-1 Page 1 of 1 CLIENT ARCHITECT/ENGINEER.AutoZone Inc. SITE 1180 N. College Avenue PROJECT Fort Collins Colorado Proposed Buildinj & Pavement SAMPLES TESTS o Z m 0 ': o E >- W Uf 2 DESCRIPTION H a Z\ U.0 a W in du. oU 1 U) 0 Z2 ow ce �z W ~J �rJm O s 0: on 9F.-M uJo. m Approx. Surface Elev.: 97.2 ft. o 0.5 6" GRAVEL SURFACE 96.7 PA 1.0 BASE COURSE %'2 CL 1 SS 12' 9 18.1 EILL-Lean clay with sand Brown/red, moist 94.2 3.0 2 [PACL 12" 28.0 92 2160 LEAN CLAY 312" 4 21.2 Dark brown, moist, soft to medium 5 6.5 90.7 w SAND WITH GRAVEL SW 4 SS 12" 36 11.9 y Tan/ 8mY. wet � *" Dense to very dense PA Cobbles below 9.5' 10 ..f ..f GP 5 SS 9" 50/9" 10.9 IS PA 18.0 79.2 WEATHERED SANDSTONE 19.0 Tan/olive, wet, hard 78.2 S ND� STONE Tan olive, wet, very hard END OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS A_ 4 Laboratories Incorporated BORING STARTED 4-19-93 WL, g 6.250 w.D. BORING compiErED 419-93 J:Ermllpire RIG CME-55 FOREMAN DAR wL Division of Terracon w'I- Boring filled in A.B. APPROVED NR.S JOB f 20935081 1 Terracon show soils encountered, location of sampling, and groundwater at the time of the exploration. The borings were advanced with a four -inch diameter, continuous -type, power -flight auger drill. During the drilling operations, a geotechnical engineer from Empire Laboratories, Inc. was present and make continuous observations of the soils encountered. SITE LOCATION AND DESCRIPTION The site is located at 1180 North College Avenue south of JAX Surplus in north Fort Collins, Colorado. More particularly, the site is described as a tract of land situate in the Southwest 'W of Section 1, Township 7 North, Range 69 West of the Sixth P.M., City of Fort Collins, Larimer County, Colorado. The site of the proposed AutoZone store is currently occupied by Classic Housing Mobile Home Sales. The property is located on the east side of College Avenue south of JAX Surplus. The site is relatively flat and has minor drainage in a southeast direction. The majority of the site is overlain by a 4 to 6 inch layer of gravel surfacing used for mobile and modular home parking. The southwest portion of the site is asphalt paved. The east portion of the site is vacant and is vegetated with grass and weeds. Trees are located along the east property line. An irrigation or drainage ditch is located along the northeast, east and southeast property lines. East of the northeast corner of the site is a one- story metal frame warehouse. South of the property is an autobody shop and a used car lot, and College Avenue forms the west property boundary. -2- MOISTURE DENSITY RELATIONSHIP DETERMINATION Samples of representative fill materials to be placed shall be furnished by the contractor to the geotechnical engineer for determination of maximum density and optimum moisture or relative density. Sufficient laboratory moisture density or relative density curves will be made to determine the optimum moisture content and maximum density for the various soils placed as fill. Tests for this determination will be made using the appropriate method conforming to the requirements of ASTM D 698 (Standard Proctor), ASTM D 1557 (Modified Proctor) or ASTM D 4253, D 4254 (Relative Density). The materials used for fill shall be classified in accordance with ASTM D 2487 in order to permit correlation between the moisture density relationship data and the material being placed and compacted. Copies of the results of these tests will be furnished to the client and ,others as directed by the client. These test results shall be the basis of control for all compaction efforts. FIELD DENSITY AND MOISTURE TESTS The in -place density and moisture content of compacted fill will be determined by the geotechnical engineer or his representative in accordance with ASTM D 1556 (sand cone method) or ASTM D 2922, D 3017 (nuclear methods). Material not meeting the required compaction and/or moisture specifications shall be recompacted and/or moisture conditioned until the required percent compaction and/or moisture content is obtained. Sufficient compaction tests shall be made and submitted to support the geotechnical engineer's or his representative's recommendations. The results of density test will also be furnished to the client and others as directed. lifts extending the entire length of the fill. The thickness of the layers before compaction shall not be greater than eight (8) inches. Fill being placed on slopes or hillsides shall be benched into the existing slope. A minimum two (2) foot horizontal bench shall be cut into the existing excavated slope for each four (4) feet vertical of fill, or each lift should be benched slightly into the existing grade. MOISTURE CONTROL Prior to and during compaction operations, the fill material being placed shall be maintained within the range of optimum moisture specified. A general recommendation is to maintain the fill material within two percent (2%) plus or minus of optimum moisture so that proper compaction tot the specified density may be obtained with a minimal effort. In building pad and paved areas, material exhibiting swelling potential shall be maintained between optimum moisture and two percent (2%) wet of optimum moisture content. The moisture content of the fill material shall be maintained uniform throughout the fill. The contractor may be required to add necessary moisture to the fill material and to uniformly mix the water with the fill material if, in the opinion of the geotechnical engineer, it is not possible to obtain uniform moisture content by adding water on the fill surface. If, in the opinion of the geotechnical engineer, the material proposed for use in the compacted fill is too wet to permit adequate compaction, it shall be dried in an acceptable manner prior to placement and -compaction. Uniform mixing may require discing, blading or other methods approved by the geotechnical engineer or his representative. Adjustments of moisture content shall be made on the basis of determinations of moisture content by field tests as construction progresses. COMPACTION The contractor shall furnish and operate the necessary types and kinds of equipment to perform the operations required to obtain the specified compaction. This equipment may include approved tamping rollers, rubber tired rollers, smooth wheeled rollers and vibratory rollers. If a sheepsfoot roller is used, it shall be provided with cleaner bars so attached as to prevent the accumulation of material between the tamper feet. Fill areas which are not accessible to full-sized construction equipment shall be placed in maximum four (4) inch lifts and compacted with power tampers to the specified density. Compaction should meet the minimum percentages of maximum density as set forth in the project specifications or the recommendations of the report. The contract specifications supersede the recommendations given in this report. s 'S t APPENDIX C Suggested Minimum Specifications for Placement of Compacted Earth Fill and/or Backfills GENERAL The geotechnical engineer .shall be the owner's, architect's, engineer's or contractor's representative to observe placement of his compacted fill and/or backfill on the project. The geotechnical engineer or his representative shall approve all earth materials prior to their use, the method of placement and the degree of compaction. MATERIALS Soils used for all compacted fill and backf ill shall be approved by the geotechnical engineer of his representative prior to their use. Fill material shall be free from organic matter, frozen material and other unsuitable substance and shall not contain rocks or lumps having a diameter greater than six (6). inches. SUBGRADE PREPARATION All topsoil, vegetation, trees, brush, timber, debris, rubbish and all other unsuitable material shall be removed to a depth satisfactory to the geotechnical engineer or his representative. The material shall be disposed of by suitable means prior to beginning preparation of the subgrade. The subgrade shall be scarified a minimum depth of six (6) inches, moisture conditioned as necessary and compacted in a suitable manner prior to placement of fill material. Fill shall not be placed until approval by the geotechnical engineer or his representative; and in no case, shall fill material be placed on frozen or unstable ground. Subgrade which is not stable .may require the use of imported granular material, geotextiles or other methods for stabilization as approved by the geotechnical engineer. FILL PLACEMENT Fill material shall not be placed during unfavorable weather conditions. Material proposed for use as fill shall be approved by the geotechnical engineer or his representative prior to use. Proposed import material shall be approved by the geotechnical engineer or his representative prior to hauling to the project. site. Fill material shall be uniformly mixed such as to preclude the formation of lenses of material differing from the surrounding material. All clods shall be broken into small pieces. The contractor shall construct the fill in approximately horizontal 4 ,) a APPENDIX C SUMMARY OF TEST RESULTS f Boring Depth Moisture . Dry I Compressive I Swell Soluble pH Liquid Plasticity Group Classification Resistivity Penetration No. Ft. % Density Strength Pressure Sulfates Limit Index Index AASHTO (OHM -CM) Blow/In. .nfIm inrm form % . % % I I USCS SUMMARY OF TEST RESULTS Boring No. Depth Ft. Moisture % Dry Density (PCF) Compressive Strength (PCF) Swell Pressure (PCF) Soluble Sulfates % pH Liquid Limit % Plasticity Index % Group Index Classification AASHTO USCS Resistivity (OHM -CM) Penetratiorr Blow/In. A-4 4-5 20.1 15/12 7-8 10.9 1 21/12 14-15 9.2 45l12 19-19.8 11.6 50/10 A-5 1-2 27.0 3/12 3-4 17.0 107.1 1230 .0043 4-5 18.7 20/12 7-8 10.0 33/12 14-14.7 5.3 50/8 19-20 21.7 50/12 A-6 1-2 25.6 6/12 3-4 18.7 109.7 1 380 30 4-5 3.4 34/12 7-8 7.9 40/12 14-14.8 1 4.6 50/12 19-19 50/1h A-7 1-2 22.8 7/12 3-4 20.3 101.1 600 4-5 24.8 2/12 7-8 10.5 38/12 RA m RESISTANCE R-VALUE AND EXPANSION PRESSURE OF COMPACTED SOIL ASTM — D 2844 CLIENT: AUTOZONE INC. PROJECT: PROPOSED AUTOZONE STORE 1180 N. COLLEGE AVE. LOCATION OF SAMPLE: COMPOSITE SAMPLE BORING NO. B-1 @ 1.0' - 5.0' SAMPLE DATA TEST SPECIMEN 1 2 3 COMPACTION PRESSURE - PSI 0 80 120 DENSITY - PCF 106.8 110.5 111.9 MOISTURE - : 20.7 18.7 16.6 EXPANSION PRESSURE - PSI 0.00 0.00 0.00 HORIZONTAL PRESSURE @ 160 psi 152 146 138 SAMPLE HEIGHT - in. 2.56 2.58 2.53 EXUDATION PRESSURE - PSI 107 259 477 UNCORRECTED R-VALUE 3.1 5.6 9.3 CORRECTED R-VALUE 3.1 5.8 9.3 R-VALUE AT 300 PSI EXUDATION PRESSURE = 6.7 100 80 w 40 20 0 U-L 10O 200 300 4210 500 6A-0 EXUDATION PRESSURE — psi EMPIRE LABORATORIES INC. B- 5 700 800 I 100 90 r1 80 H 7 70 CO w 60 0 ~ z 50 s w 40 H 30 m 20 H 10 GRAIN SIZE DISTRIBUTION QJRVE PROJECT: AutoZone Store @ f1&0 N. College Ave. Ft. Collins Colo. LOCATION OF SAMPLE: Boring A-3 @ 7.0` # 200 # 100t-60 #40 #2E # 10 ## 4 'li'�2' , 2 a L .001 .01 .1 1.0 10 OPENING SIZE IN MILLIMETERS 1aU % CLAY % SILT I % SAND % GRAVEL FIPE MEDIUM ICOARGE 21.2 1 19.9 34.9 1 8.3 15.7 0 10 200 w z 30 S 40 uj 50 z 60 u 70 CL 80 90 100 540 .53 .52 .51 .0 CONSOLIDATION TEST PRO. 209:35081 BORING NO.: A7 DEPTH: 3.0 0 DRY DENSITY:107.1 PCr' MOISTURE: 21.8 % 0 0 13 0 I e. 0.25 gm 2.0 Ul -2.0 4.0 0.5 1.0 5 10 APPLIED PRESSURE - TSF -8.0 1 1 - : I I I 0.1 0.25 rd. 5 1.0 5 APPLIED PRESSURE - TSF EMPIRE LABORRTORIES INC. B-3 ♦ I I CONSOLIDATION TEST PRO. 20935081 0 BORING NO.: A l DEPTH: 3.0 90 DRY DENSITY: 97.9 PCF MOISTURE: 24.5 % 60 70 60 50 40 30 20 l0 0.1 4.0 X 0.0 0.25 0.5 1.0 5 10 APPLIED PRESSURE - TSF 0.1 0.25 0.5 1.0 5 10 APPLIED PRESSURE - TSF EMPIRE LABORRTORIE INC. B-2 APPENDIX B i I LOG OF BORING NO. B4 Page 1 of 1 CLIENT ARCHTTECIYENGINEER AutoZone Inc. SITE 1180 N. College Avenue PROJECT Fort Collins Colorado Proposed uildi2q & Pavement SAMPLES TESTS } W z H w d H DESCRIPTION N z♦ I3 G LLO go HJ _ m W G. 1— O U) HUs 2Z r�r� P o dim g oar ¢7� Approx. Surface Elev.: 96.7 ft. 2 2' ASPHALT g6 g 8.5 96 Z PA BASE COURSE GP 1 SS 12' S 16.5 FE,L_-Gmvel with sand 1.5 Gray/tan, moist 95.2 CL 2 SS 12' 4 T.. N AY WrM SAND Brown, moist, soft to medium CL BS 26/15/I1 Composite sample F to 4' CL 3 SS 12' 3 4.5 92.2 SC 119-51 CLAYEY SAND 5.0 Tan, moist, very loose to loose 91.7 5 END OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS A-14 Empire Laboratories BORING STARTED 4-19-93 sNone w.D. = BORING coMPLETED 4-19-93 Incorporated LWL I RIG CME-55 PGRW" DAR Division of Terracon Boring filled in A.B. APPROVED NRs JOB 1 20935081 LOG OF BORING NO. B-3 Page 1 of 1 CLIENT ARCHTTECriENGINEnt AutoZone Inc. sITB 1180 N. College Avenue PROJECT Fort Collins Colorado Proposed uildi2& & Pavement SAMPLES TESTS WF J m J DESCRIPTION y Of z� + w N z HHz N � W W I a- W 1 d0 O KC�.1 8Zto y`! !— � N z DO. 9105 MU) Approx. Surface Elev.: %.6 fL O 8 z 0.2 2' ASPHALT 96.4 PA 0,7 BASE COURSE 95.9 CL 1 SS 12' 4 23.6 E&L-Lean clay with sand Brown, moist CL 2 SS 12' S 2.0 94.6 i.FAN AY WITH S ND Brown/red, moist PA Soft to medium stiff CL 3 SS 12' 1 18.9 4.5 92.1 Sc CLAYEY Y SAND 5.0 Brown/red, moist, very loose 91.6 5 END OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS A_ 13 Empire Laboratories Incorporated Division ofTeeacon BORING STARTED 4-19-93 vvl 9 None W.D. BORING COMPLETED 4-19-93 WL j RIG CME-55 FOREMAN DAR WL Boring filled in A.B. APPROVED I� toB - 20935081 LOG OF BORING NO. B-2 Page 1 of 1 CLIENT ARCHITECr/ENGINEER AutoZone Inc. SITE 1180 N. College Avenue PROJECT Fort Collins Colorado Proposed Buildinj & Pavement SAMPLES TESTS W o 0 J iy DESCRIPTION E H } cc zN W j zX W FO H t;U. ppz BMW Approx. SurfaceElev.:97.4ft. dim E oa �aiyo_ 6' GRAVEL SURFACE PA � 0.5 �•9 CL 1 SS 124 10 E1Ly-Sandy lean clay with gravel Brown, moist 110.3 1.5 95.9 CL 2 SS .12' 6 Y >; err [`T ev wrrr-T SAND Brown, moist, medium stiff PA 4.0 93.4 SAND WITH GRAVEL SW 3 SS 12' 24 9.7 :i Tan/gray, moist 5.0 Medium dense 92.4 5 END OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS A-12 Empire Laboratories Incorporated Divisi°° ofTemoon BORING STARTED 4-19-93 g None W.D. BowNG col immD 4-19-93 IWL WL RIG CME-55 FOREMAN DAR ZVL Boring filled in A.B. APPROVED pjR$ JJOB I 20935081 LOG OF BORING NO. B-1 Page 1 of 1 CLIEW ARCHIPECr/ENGMER AutoZone Inc. SITE 1180 N. College Avenue PROJECT Fort Collins Colorado Proposed Buildinj & Pavement SAMPLES TESTS 0 c� DESCRIPTION W ? c LL mH\ IN W cUm LL F fAm Ic �d :)(a 0 Approx. Surface Elev.: 97.2 ft. O F W 5" 6' GRAVEL SURFACE PA ' d 0.5 96•7 CL 1 SS 12' 6 16.6 mj,_Lean clay with sand Brown, moist 2 SS 12' 6 2.0 95.2 32/17/15 T.FAN CLAY WEER SAND Brown, moist, medium stiff CL BS Composite sample ® V to 5' 4.0 93.2 CANDY LEAN CLAY CL 3 SS 12' 2 23.4 Brown, moist, soft 5.0 92.2 5 . END OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION NAY BE GRADUAL. WATER LEVEL OBSERVATIONS A_1 Empire Laboratories Incorporated Division of Tertacon BORJNG STARTED 4-19-93 WL $ None W.D.� BORING COMPLETED ¢M93 wL RIG CME-S5 FOREMAN DAR WL Boring filled in A.B. APPROVED NRS IJOBI 20935081 LOG OF BORING NO. A-7 Page 1 of 1 CLIENT ARCHITECf/FNGINEER AutoZone Inc. SITE 1180 N. College Avenue PROJECT Fort Collins Colorado Proposed. uildi2g & Pavement SAMPLES I TESTS . N W V, 0 ^ m III to zx H DESCRIPTION N m � z� W 1-o (a o�1a zz0.°° ow �o c�I it g oav~ia ga Approx. SurfaceElev.:95.9ft. v°iio 0.2 ASPHALT 95.7 PA 0.6 BASE COURSE 95.3 CI. 1 SS 12' 7 22.8 2.0 F1I.L=Lean clay with sand 93.9 rown, moist PA SANDY LEAN LAY CL 2 ST 12' 20.3 101 600 Cray/brown, moist, soft 3 SS 12' 2 24.8 � 5 6.0 89.9 JPAJ .f SAND WITH GRAVEL SW 4 SS 12' 38 10.5 Brown gray, wet, dense PA Cobbles below 9.0' 10 ..f ' GP 5 SS 12' 34 13.4 f 15 PA 10. +r 19.5 76.4 6 SS 12' 38 24.0 WEATffFRET) SANDSTONE Tan/olive, wet, hard END OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS A=10 . Empire Laboratories Incorporated Division ofTertacon BORING STARTED 4-19-93 WL JU 5.161 W.D. BORwia coliLErw 4-19-93 v y RIG CME-55 FOROAAN DAR WI Borifilled in A.B. APPROVED NR,S JOB / 20935081 a I LOG OF BORING NO. A-6 Page 1 of i CLIENT ARCHITECT/ENGINEER AutoZone Inc. SITE 1180 N. College Avenue PROJECT Fort Collins Colorado Proposed Buildi & Pavement SAMPLES TESTS o (3 �: o 0 U) LL(a N DESCRIPTION to z� w M _ CL Ul m W p> I t!1 ~ O KU 22 0 fim CD W 0: O~.J /nm QL On. MOD,n. Approx. Surface Elev.: 95.4 ft. ASPHALT 95.2 PA BASE COURSE 94•9 —4iCL ]g,LcLean clay 1 SS 120 6 25.6 PA [..:::4.5 Park brown, moist CLAYEY SAND 30 SC 2 ST 12' 18.7 110 380 Brown, moist to wet 3 SS 120 24 3.4 Medium dense 90.9 5 SAND WITH GRAVEL PA Tan/orange/gray, moist to wet Medium dense to very dense SW 4 SS 12' 40 7.9 •: � Cobbles below 7.5' PA :i 10 .•4 .. f GP 5 SS 10' 50/10-1 4.6 PA 15 4W .' 18.0 77.4 WReTHERRT1 SANDSTONE 19.1 Tan/olive, wet, hard - - - 76.3 r END OF BORING 1 1 . L THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS A-9 Empire Laboratories Division ofTeacon BORING STARTED 4-19-93 WL $ 4.66' W.D. i BORING COMPLETED 4-19_93 WL IIncorporated RIG CME-55 FOREMAN DAR WL Boring filled in A.B. APPROVED N1tS JOB 20935081 LOG OF BORING NO. A-5 Page 1 of 1 CLXENT ARCHITECrIENGINEFR AutoZone Inc. SITE 1180 N. College Avenue PROJECT Fort Collins Colorado ProposedBuildl & Pavement SAMPLES TESTS J o H DESCRIPTION " } 47 0: it W Z\ it ,7 6 ~~ U. C7 = 00 W OW. >p U 147 1-0 r N O �- O2Z C1�li ym ca MNd Approx. Surface Elev.: %.3 ft. ASPHALT 96.1 PA BASE COURSE 95.8 CL 1 SS 12' 3 27.0 [2.0) ILL.Lean clay with sand %.3rown, moist PAiEAN CLAY W= SAND � CL 2 ST12" 17.0 107 1230 Brown, moist, medium stiff 3 SS 12' 20 18.7 91.8 5 4 ~' PA SAND WITH GRAVEL Tanigray, moist to wet, dense SW 4 SS 12" 33 10.0 PA Cobbles below 8.0' 10 ..t �. s .•4 GP 5 SS 8" 5018" 5.3 +r is — PA .f 18.5 77.8 19.5 76.8 Tao olive, wet, hard 6 SS 12" 50 21.7 S NDA --STONE 20 rATHEuRDSANDSTONE Tan olive, wet, very hard END OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS A-S Empire Laboratories Incorporated Division ofTerracon BORING STARTED 4-19-93 s 5.66' W.D. BORING commETED 4-19-93 r RIG CME-5s FOREMAN DAR Boring filled in A.B. APPROVED NRS JOB S 20935081 F LOG OF BORING NO. A4 Page 1 of 1 CLIENT ARCHrIE TMNGINEER AutoZone Inc. SITE 1180 N. College Avenue PROJECT Fort Collins Colorado ProBuildi &Pavement SAMPLES TESTS J `� E } zN III to Z= W H DESCRIPTION rn w W zz ca M d F'J O W VHN W fla. 8 Z W dim = On. SUM 0 Approx. Surface Elev.: 95.9 ft. 0.5 6" GRAVEL SURFACE 95.4 1.0 BASE COURSE 94.9 PA CL 1 SS 12" 7 18.0 fIL-Lean clay with gravel Dark brown, moist PA 3.5 92.4 95 CL 2 ST 12" 21.0 102 2660 LFAN CLAY 4.5 Dark brown, moist, stiff 91.4 5 3 SS 12" 15 20.1 PA WITH GRAVEL • 4 SAND Tan/gray, moist to wet .: Medium dense to dense SW 4 SS 12" 21 10.9 PA .. 4 Cobbles below 9.0' 10 . i GP 5 SS 12" 45 9.2 15 PA •: yr 6 SS 10" 0/10" 11.6 76.1 19.8 END OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. wATER LEVEL OBSERVATIONS A_ 7 BORING STARTED 4-19-93 BORING COLLETED 4-19.93 Empire Laboratories wL g 7.419 W.D. 3 RJG CA�55 FOREMAN DAR Incorporated wL EBori Division of Tecracon APPROVED �]g$ JOB 1 20935081 w[ filled in A.B. LOG OF BORING NO. A-3 ftge 1 of 1 CLIENT ARCHTI•ECC/ENGINEM AutoZone Inc. SITE 1180 N. College Avenue PROJECT Fort Collins Colorado Pro ed Buildinj & Pavement SAMPLES TESTS o ZS c ^, o J r E } W Cn X Ha L) DESCRIPTION N W Z� w Coll)\ � Uf m W U F- O N } p5- f- a:�yy H\ o z it ym = Cad nl~Aa C CD Approx. Surface Elev.: 95.4 ft. 8.5 6' GRAVEL SURFACE R4 IPA CL I SS 12' 10 13.0 BASE COURSE 2.0 ELL --Sandy lean clay 93.4 rown/tan, moist PA LEAN CLAY 44/2321 CL 2 ST 12' 24.7 97 3900 Dark brown, moist, soft to stiff 3 SS 12' 4 21.4 5.5 89.9 5 PA CLAYEY SAND WITH ,RAVEL Brown, wet, medium dense SC 4 SS 12' 18 18.4 9.0 87.4 .� "r PA SAND WITH GRAVEL f �+ AND COBBLES Brown/tan, wet 10 Medium dense to dense GP 5 SS 12' 32 12.9 •�'' 15 PA 17.5 77.9 tx/FeTHERF.D SANDSTONE 19.0 Tan/olive, wet, hard 76.4 SANDSTONE_ Tan/olive, wet, very hard END OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS A_6 BORING STARTED 4-19-93 Empire Laboratories BGRING co►mErw 4-19-93 WL Y s.25* W.D. �_ Incorporated RIG C�55 FGRAN DAR w< Division of Tertacon WL Boring filled in A.B. APPROVED j1jR$ JOB t 20935081 LOG OF BORING NO. A-2 Page 1 of 1 CLIENT ARCHITECT/ENGINEER AutoZone Inc. SITE 1180 N. College Avenue PROJECT Fort Collins Colorado Proposed Buildinj & Pavement SAMPLES TESTS F H W J L } . W CO) 2S W DESCRIPTION v W W Zy W 0D W N 80: JN W LU CJto t�l 1.- Nm } o ai L WO-CL0 m Approx. Surface Elev.: %.2 ft. 0.5 6' GRAVEL SURFACE 95.7 1.0 BASE COURSE 95.2 PA CL 1 SS 12' 4 22.8 2.0 � "i "Lean clay with sand 94.2 rown/red, moist PA LEAN CLAY 40 CL 2 ST 12• 24.9 97 2380 Dark brown, moist 3 SS 12' 10 20.9 4.5 Medium to stiff 91.7 5 SAND WGRAVEL ITH PA .: � Tan, moist to wet, medium dense .: Cobbles below 7.0' " SW 4 SS 120 29 16.0 PA 10 GP 5 SS 12' 19 4.6 '•1 IS PA .. f 18.0 78.2 WEATHERED SANDSTONE 19.0 Tan/olive, wet, hard 77.2 , S T STONE_ Tan/olive, wet, very hard _j END OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL AND ROCK TYPES: IN -SITU, THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS A-5 Empire Laboratories Incorporated Division ofTertacon BORING STARTED ¢�'� WL 9 5.41' W.D. = BORING COMPLETED 419_93 WL RIG CM&55 FOREMAN DAR WL Boring filled in A.B. APPROVED NRS JOB a 20935081 GENERAL NOTES DRILLING & SAMPLING SYMBOLS: SS Split Spoon - 1%" I.D., 2" O.D., unless otherwise noted PS Piston Sample ST Thin -Walled Tube - 2" O.D., Unless otherwise noted WS Wash Sample PA Power Auger FT Fish Tail Bit HA DB Hand Auger Diamond Bit - 40, N, B RB BS Rock Bit Bulk Sample AS Auger Sample PM Pressuremeter HS Hollow Stem Auger DC Dutch Cone WB Wash Bore Standard "N" Penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2 inch OD split spoon, except where noted. WATER LEVEL MEASUREMENT SYMBOLS: WL Water Level WS . While Sampling . WCI : Wet Cave In WD . While Drilling DCI Dry Cave In BCR : Before Casing Removal . AB After Boring ACR : After Casing Removal Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. In pervious soils, the indicated levels may reflect the location of groundwater. In low permeability soils, the accurate deter- minatitin of ground water levels is not possible with only short term observations. DESCRIPTIVE SOIL CLASSIFICATION: Soil Classification is based on the Unified Soil Classification System and ASTM Designations D-2487 and D-2488. Coarse Grained Soils have more than 50% of their dry weight retained on a k200 sieve; they are described as: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are described as: clays, if they are plastic, and silts if they are slightly plastic or non -plastic. Major con- stituents maybe added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse grained soils are defined on the basis of their relative in -place density and fine grained soils on the basis of their consistency. Example: Lean clay with sand, trace gravel, stiff (CL); silty sand, trace gravel, medium dense (SM). CONSISTENCY OF FINE-GRAINED SOILS: RELATIVE DENSITY OF COARSE -GRAINED SOILS: N-Blows/ft. Relative Density Unconfined Compressive Strength, Qu, psf Consistency 0.3 Very Loose < 500 Very Soft 4-9. 10-29 Loose Medium Dense 500 - 1,000 Soft 30.49 Dense 1,001 - 2,000 Medium 50.80 Very Dense 2,001 - 4,000 Stiff 80+ Extremely Dense 4,001 - 8,000 Very Stiff 8,001-16,000 Hard >-16,000 Very Hard RELATIVE PROPORTIONS OF SAND AND GRAVEL Descriptive Term(s) (of Components Also Percent of Present in Sample) Dry Weight Trace < 15 With 15 - 29 Modifier > 30 RELATIVE PROPORTIONS OF FINES Descriptive Term(s) (of Components Also Percent of Present in Sample) Dry Weight Trace < 5 With 5 - 12 Modifier > 12 GRAIN SIZE TERMINOLOGY Major Component Of Sample Size Range Boulders Over 12 in. (300mm) Cobbles Gravel Sand Silt or Clay 12in. to3in. (300mm to 75mm) 3 in. to N4 sieve (75mm to 4.75mm) #4 to #200 sieve (4.75mm to 0.075mm) Passing #200 sieve (0.075mm) A3 Form 108-6.85 lrerracon TEST BORING LOCATION PLAN F$i � 'z I. ��ET Y;2rAPT D;Z A-1 B�_ • NSU �oord I A-2 EMPIRE LABORATORIES, INC. _ APPENDIX A • Terracon .j continuous construction review during the excavation and foundation phases of the work. Empire Laboratories, Inc. assumes no responsibility for compliance with the recommendations included in this report unless they have been retained to perform adequate on - site construction review during the course of construction. -15- Terracon (6) It is recommended that compaction requirements in t-he project specifications be verified in the field with density tests performed under the direction of the geotechnical engineer. (7) It is recommended that a registered professional structural engineer design the substructure and that he take into account the findings and recommendations of this report. GENERAL COMMENTS This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranty, express or implied, is made. This report has been prepared to aid in the evaluation of the property and to assist the architect and/or engineer in the design of this project. In the event that any changes in the design of the structure or its location are planned, the conclusions and recommendations contained in this report will not be considered valid unless said changes are reviewed and conclusions of this report modified or approved in writing by Empire Laboratories, Inc., the geotechnical engineer of record. Every effort was made to provide comprehensive site coverage through careful locations of the test borings, while keeping the site investigation economically viable. Variations in soil and ground water conditions between test borings may be encountered during construction. In order to permit correlation between the reported subsurface conditions and the actual conditions encountered during construction and to aid in carrying out the plans and specifications as originally contemplated, it is recommended that Empire Laboratories, Inc. be retained to perform -14- Terracon properly cured and protected in accordance with the above specifications. Concrete injured by frost should be removed and replaced. It is recommended the pavement not be opened to traffic until a flexural strength of 400 pounds per square inch is obtained or a minimum of 14 days after the concrete has been placed. GENERAL RECOMMENDATIONS (1) Laboratory test results indicate that water soluble sulfates in the soil are negligible, and a Type I -II cement may be used in concrete exposed to subsoils. Slabs on grade subjected to de-icing should be composed of a more durable concrete with low water -cement ratios and higher air contents. (2) Finished grade should be sloped away from the structure on all sides to give positive drainage. Five percent (5%) for the first ten (10) feet away from the structure is the suggested slope. (3) Gutters and downspouts should be designed to carry roof water runoff well beyond the backfill area. (4) Underground sprinkling systems should be designed such that piping is placed a minimum of five (5) feet outside the backfill of the structure. Heads should be designed so that irrigation water is not sprayed onto the foundation walls. These recommendations should be taken into account in the landscape planning. (5) Footing sizes should be proportioned to equalize the unit loads applied to the soil and thus minimize differential settlements. -13- Terracon Rigid Pavement A feasible foundation alternate at the site would be rigid pavement. Using the 18 kip equivalent daily load applications described above, a modulus of subgrade reaction of 105 pounds per square inch per inch based on an "R" value of 6.7, a design life of 20 years, and concrete designed with a modulus of rupture of 650 pounds per square inch, the following minimum pavement thicknesses are recommended: Standard -Duty Pavement Design Nonreinforced Concrete - 5" Heavy -Duty Pavement Design Nonreinforced Concrete - 6" Concrete pavement should be placed directly on the subgrade that has been uniformly and properly prepared in accordance with the above recommendations. All concrete used in the paving shall meet ASTM specifications, and all aggregate shall conform to ASTM C 33 specifications. The concrete should be designed with a minimum modulus of rupture of 650 pounds per square inch in 28 days. It is recommended laboratory mix designs be performed to determine the proper proportions of aggregates, cement and water necessary to meet these requirements. It is essential the concrete have a low water -cement ratio, an adequate cement factor, and sufficient quantities of entrained air. Joints should be carefully designed and constructed in accordance with City of Fort Collins "Design Criteria and Standards for Streets" specifications to ensure good performance of the pavement. It is recommended all concrete pavement be placed in accordance with City of Fort Collins specifications. If paving is done during cold weather, acceptable cold weather procedures as outlined in the City of Fort Collins specifications should be utilized. The concrete pavement should be -12- Terracon Asphalt Concrete 2" Plant Mix Bituminous Base Course 2%" Total Pavement Thickness 4%11 Heavy -Duty Pavement Design Asphalt Concrete 3" Crushed Aggregate Base Course 6" Total Pavement Thickness 9" Asphalt Concrete 1 2" Plant Mix Bituminous Base Course 3_%"" Total Pavement Thickness 5%11 The crushed aggregate base course should meet City of Fort Collins Class 5 or 6 specifications. The subgrade below the proposed asphalt pavement should be prepared in accordance with the recommendations discussed in the "Site Grading, Excavation and Utilities" section of this report. Upon proper preparation of the subgrade, the base course should be placed and compacted plus or minus 2% of optimum moisture to at least 9516 of Standard Proctor Density ASTM D 698-78. (See Appendix C.) It is recommended the asphalt concrete and/or plant mix bituminous base course be placed in 2 to 3 inch lifts. All plant mix bituminous base course and asphalt concrete shall meet City of Fort Collins specifications and shall be placed in accordance with these specifications. The crushed aggregate base course shall have an "R" value between 70 and 77, the plant mix bituminous base course shall have an Rt value of 90 or greater, and the asphalt concrete shall have an Rt value of 95 or greater. The "R" value of the pavement materials used should be verified by laboratory tests. Field density test results should be taken in the aggregate base course, bituminous base course and asphalt concrete under the direction of the geotechnical engineer. -11- a Terracon Pavement It is our opinion flexible pavement is suitable for the proposed pavement construction at the site. A flexible pavement alternate should consist of asphalt concrete underlain by crushed aggregate base course or asphalt concrete underlain by plant mix bituminous base course. The design criteria described below was utilized in determining the pavement thicknesses at the site. AASHTO Guide for Design of Pavement Structures dated 1986 18 kip ESAL - 11,279 for'standard duty pavement design and 18 kip ESAL - 30,576 heavy-duty pavement as provided by AutoZone Resilient Modulus MR of 4718 psi based on an "R" value of 6.7 Reliability Factor - 70 Overall Deviation - .44 Initial Serviceability Index - 4.5 Terminal Serviceability Index - 2.0 Drainage Coefficient - 1 20-Year Design Life Structural Number - 1.70 for standard -duty pavement and 2.00 for heavy-duty pavement Strength Coefficients: Asphalt Concrete - 0.44 Plant Mix Bituminous Base Course - 0.34 Crushed Aggregate Base Course - 0.11 The following minimum pavement thicknesses are recommended: Standard Duty Pavement Asphalt Concrete 3" Crushed Aggregate Base Course 4" Total Pavement Thickness 7" -10- Terracon 50 pounds per cubic foot per foot depth of backfill. Free-standing foundation walls backfill with imported granular soils should be designed using a hydrostatic pressure distribution and equivalent fluid pressure of 45 pounds per cubic foot per foot depth of backfill. Subgrade below slabs on grade should be prepared in accordance with the recommendations discussed in the "Site Grading, Excavation and Utilities" section of this report. It is our understanding that 100 pound floor loads are anticipated for the proposed building. Based on this, slabs on grade should be underlain by a minimum of 6 inches of CDOT'Class 5 or 6 crushed aggregate base course compacted plus or minus 2t of optimum moisture to at least 950k of Standard Proctor Density ASTM D 698-78. (See Appendix C.) Floor areas transmitting light floor loads should be underlain by a minimum of 4 inches of clean gravel or crushed rock devoid of fines. The gravel base course and/or gravel should help to distribute floor loads and should act as a capillary break. Slabs on grade should be designed for the imposed loading, and it is suggested they be designed structurally independent of bearing members. To minimize and control shrinkage cracks which may develop in slabs on grade, we suggest that control joints be placed every 15 to 20 feet, and the total area contained within these joints should be no greater than 400 square feet. In addition, if building construction is done during winter months, it is recommended the slab on grade not be poured until the building has been enclosed and heat is available within the building area so that slab -on - grade concrete is not placed on frozen ground. This will aid in proper curing of the slab concrete. WE Terracon All footings should be founded on the original, undisturbed soil or on a structural fill extended to the undisturbed soil. All exterior footings should be placed a minimum of 30 inches below finished grade for frost protection. In no case should footings be founded on the existing fill encountered at the site. The structural fill should extend twice the footing width to the undisturbed soil below. The structural fill should consist of the on -site soils, existing fill devoid of debris or imported granular fill approved by the geotechnical engineer. The fill should be placed in uniform 6 to 8 inch lifts and mechanically compacted to a minimum 95% of Standard Proctor Density ASTM D 698-78. The structural integrity of the fill as well as the identification and undisturbed nature of the soil should be evaluated by the geotechnical engineer prior to placement of any foundation concrete. Footings and/or grade beams founded at the above levels may be designed for a maximum allowable bearing capacity of 1,500 pounds per square foot (dead load plus maximum live load). The predicted settlement under the above maximum loading as determined by laboratory consolidation tests should be less than 1 inch, generally considered to be within acceptable tolerances. Differential settlement across the structure is anticipated to be between 1/4 and 1/2 inch. Backfill and Slabs on Grade Backfill placed adjacent to the building should consist of the on -site soils or imported granular material approved by the geotechnical engineer. The backfill should be mechanically compacted in uniform 6 to 8 inch lifts to a minimum of 95% of Standard Proctor Density ASTM D 698-78 (See Appendix C) or 80% of Relative Density ASTM D 4253, D 4254. Free-standing foundation walls backfilled with the on -site soils should be designed using a hydrostatic pressure distribution and equivalent fluid pressure of we Terracon All excavations should be dug on safe and stable slopes. The slope of the sides of the excavations should comply with local codes or OSHA regulations. Where this is not practical, sheeting, shorting and/or bracing of the excavation will be required. The sheeting, shoring and bracing of the excavation should be done to prevent sliding or caving of the excavation walls and to protect construction workers and adjacent structures. The side slopes of the excavation or sheeting shoring or bracing should be maintained under safe conditions until completion of backfilling. In addition, heavy construction equipment should be kept a safe distance from the edge of the excavation. Where utilities are excavated below groundwater, dewatering will be needed during placement of pipe and backfilling for proper construction. All piping should be adequately bedded for proper load distribution. Backf ill placed in utility trenches in open and planted areas should compacted in uniform lifts at optimum moisture to at least 90% of Standard Proctor Density ASTM D 698-78 the full depth of the trench. Backfill placed in utility trenches under buildings and paved areas should be compacted at or near optimum moisture to at least 95% of Standard Proctor Density ASTM D 698-78. Addition of moisture to and/or drying of the subsoils may be needed for proper compaction. Stripping, grubbing, subgrade preparation and fill and backfill placement should be accomplished under continuous observation of the geotechnical engineer. Field density tests should be taken daily in the compacted subgrade, fill and backfill under the direction of the geotechnical engineer. Foundation In view of the loads transmitted by the proposed construction and the soil conditions encountered at the site, it is recommended the structure be supported by conventional -type spread footings. -7- Terracon the building. AutoZone standard -duty pavement design is based on a 20-year design life with an 18 kip ESAL of 11,279. The heavy- duty design criteria and 20-year design life is based on an 18 kip ESAL of 30,576. Site Grading, Excavation and Utilities Specifications pertaining to site grading are included below and in Appendix C of this report. It is recommended the gravel surfacing be removed from below building and paved areas and stockpiled for reused as fill and/or backfill material. All existing asphalt below building and paved areas should be removed and wasted from the site. Any topsoil encountered at the site should be stripped and stockpiled for reuse in planted areas. The upper 8 to 12 inches of existing fill below building and paved areas should be scarified and recompacted plus or minus 2% of optimum moisture to a minimum of 95% of Standard Proctor Density ASTM D 698-78. (See Appendix C.) Finished subgrade below building and filled areas should be placed'a minimum of 3 feet above existing groundwater elevations. Where this subgrade compaction cannot be obtained due to poorly compacted fill below, additional fill should be removed until subgrade compaction can be obtained. Where finished subgrade is within 3 feet of existing groundwater, stabilization may be required. The subgrade should be stabilized with granular pit run, pit run and geotextiles or fly ash, lime, soil -cement or by other suitable means. Proper laboratory tests should be performed to ensure adequate performance of chemically stabilized soils. Fill should consist of the on -site soils, existing fill devoid of debris, or imported granular material approved by the geotechnical engineer. Fill should be placed in uniform 6 to 8 inch lifts and mechanically compacted plus or minus 2% of optimum moisture to at least 95% of Standard Proctor Density ASTM D 698-78. Terracon (7) Sand with Gravel and Cobbles: This stratum was encountered in Borings A-1 through A-7 and B-2 at depths of 4 to 8 feet below the surface and extends to depths of 17% to greater than 20 feet below the surface. The sand with gravel contains cobbles ranging in size up to 12 inches in diameter, is well graded, medium dense and exhibits moderate bearing characteristics. (8) Sandstone Bedrock: The bedrock was encountered in Borings A-1 through A-3 and A-5 through A-7 below the gravel stratum and'extends beyond the depths explored. The upper 1 to 1% feet of the bedrock is highly weathered; however, the underlying sandstone is very hard and exhibits very.high bearing characteristics. (9) Groundwater: At the time of the investigation, free groundwater was encountered in Borings A-1 through A-7 at depths of 4% to 7% feet below the surface. Water levels in this area are subject to change due to seasonal variations and irrigation demands on and/or adjacent to the property. RECOMMENDATIONS AND DISCUSSION It is our understanding the proposed AutoZone store is to be 7700 square foot masonry, slab -on -grade building. The superstructure of the building is to be a combination of loading bearing concrete block walls and steel columns supporting roof loads by means of steel bar joists. Estimated total load on each interior wall column is 72 kips consisting of a 43 kip live load and a 29 kip dead load. The proposed load of the bearing masonry walls is 2.5 kips per linear foot. Floor loads are estimated at 100 pounds per square foot. Parking areas are planned adjacent to -5- Terracon been uniformly or properly compacted; therefore, it should not be used as a bearing.soil. (3) Lean Clay: This stratum underlies the fill in Borings A- 1 through A-4 and extends to depths of 4% to 6M feet below the surface. The lean clay is plastic, is moist and exhibits generally moderate bearing characteristics. When wetted, the lean clay exhibits very slight swell potential; and upon loading, consolidation occurs. (4) Lean Clay with Sand: This stratum underlies the fill in Borings A-5 and B-1 through B-4 at depths of 1% to 2 feet below the surface and extends to depths of 4 to 4% feet below the surface. The lean clay with sand is moderately plastic, is moist and exhibits generally moderate bearing characteristics. (5) Sandy Lean Clay: This stratum was encountered in Borings A-7 and B-1 at depths of 2 to 4 feet and extends to depths of 6 feet. The sandy lean clay is tan, moist and exhibits generally moderate bearing characteristics. When wetted and upon loading, consolidation of the sandy lean clay occurs. (6) Clayey Sand: The clayey sand was encountered at depths of 1% to 5% feet in Borings A-3 and A-6 and at a depth of 4% feet in Borings B-3 and B-4 and extends to the sand and gravel stratum below or the depths explored. The sand contains varynig amounts of clay, is moist to wet, medium dense and exhibits moderate bearing characteristics. -4- X. I Terracon LABORATORY TESTS Samples from the test borings were subjected to laboratory testing in the laboratory to provide a sound basis for evaluating the physical properties of the soils encountered. Moisture contents, dry .unit weights, unconfined compressive strengths, water soluble sulfates, swelling potentials, and the Atterberg limits were determined. A summary of the tests results is included in Appendix B. Consolidation, grain size distribution and Hveem stabilometer characteristics were also determined, and curves showing this data are included in Appendix B. SOIL AND GROUNDWATER CONDITIONS The soil profile at the site consists of strata of materials arranged in different combinations. In order of increasing depths, they are as follows: (1) Pavement: One and one-half (1%) to two and one-half (2%) inches of asphalt underlain by 3 to 4% inches of gravel base course was encountered at the surface of Borings A-5 through A-7 and B-3 and B-4. The asphalt should be removed and wasted from the limits of the proposed construction. The base course may be reused as fill below building and paved areas. (2) Fill Material: A layer of fill underlies the surface and extends to depths of 1% to 3% feet below the surface. The upper 6 to 12 inches of fill consists of gravel surfacing material. The underlying fill consists of a mixture of lean clay with sand, sandy lean clay and minor amounts of gravel. It is not known whether the fill has -3- 0 Terracon i REPORT OF A GEOTECHNICAL INVESTIGATION SCOPE This report presents the results of a geotechnical investigation prepared for the proposed AutoZone store to be located on North College Avenue, north of Fort Collins, Colorado. The investigation included test borings and laboratory testing of samples obtained from these borings. The objectives of this study were to (1) evaluate the subsurface conditions at the site relative to the proposed construction, (2) make recommendations regarding the design of the substructure, (3) recommend certain precautions which should be taken because of adverse soil and/or groundwater conditions, and (4) make recommendations regarding pavement types and thicknesses for the proposed parking areas to be constructed at the site. SITE EXPLORATION The field exploration, carried out on April 15, 1993, consisted of drilling logging and sampling 11 test borings. The number of borings and their locations were determined by Mr. Paul Peterson of AutoZone, Inc. The test borings were located in the field by Empire Laboratories, Inc. from the west and north property lines using conventional chaining methods. Elevations were determined by Empire Laboratories, Inc. using a level and rod and a temporary benchmark of the north bonnet bolt of the fire hydrant located on the west property line at an assumed elevation of 100.0. The locations of the test borings are shown on the Test Boring Location Plan included in Appendix A of this report. Boring logs prepared from the. field logs are shown in Appendix A. These logs -1- I Empire Laboratories, Ino. A Division of The Terracon Companies, Inc. P.O. Box 503 • 301 No. Howes Fort Collins, Colorado 80522 (303) 484-0359 FAX No. (303) 484-0454 Chester C. Smith, P.E. Neil R. Sherrod. C.P.G. May 6, 1993 AutoZone, Inc. Department 4040 P. O. Box 2198 Memphis, Tennessee 38101 Attention: Mr. Joe Alaimo Real Estate Development & Construction Coordinator Gentlemen: We are pleased to submit our Report of a Geotechnical Investigation prepared for the proposed AutoZone store located on North College Avenue, Fort Collins, Colorado. Based upon our findings in the subsurface, it is our opinion the site is suitable for the proposed construction, provided the design criteria and recommendations set forth in this report are met. The accompanying report presents our findings in the subsurface and our recommendations based upon these findings. Very truly yours, 7., EMPIRE LABORATORIES, INC. h.-1'�,, <..`.,.,.•;. rod Senior Engineering Geologist Ge cc 23012 • •2 Weeks, P.E. ical Engineer AutoZone, Inc. - Mr. Paul Peterson, Regional Real Estate Manager, San Antonio, Texas Offices of The Terracon Companies, Inc. i i Geotechnical, Environmental and Materials Engineers Arizona: Tucson ■ Colorado: Colorado Springs, Denver, Ft. Collins. G-eeley, Longmont fill Idaho: Boise f• Illinois: Bloomington, Chicago, Rock Island ■ Iowa: Cedar Falls, Cedar Rapids. Davenpc Des Moines, Storm Lake N Kansas: Lenexa. Topeka, Wichita ■ Minnesota: St. Paul fill Missouri: Kansas City ■ Nebraska. Lincoln, Omaha 0 Nevada: Las Vegas ■ Oklahoma: Oklahoma City, Tulsa ■ Texas: Dallas 0 Utah: Salt Lake City to Wyoming: Cheyenne QUALITY ENGINEERING SINCE 1965 TABLE OF CONTENTS Table of Contents ................................. i Letter of Transmittal ............................. Report............................................ 1 AppendixA ........................................ A-1 Test Boring Location Plan ....................... A-2 Key to Boring Logs .............................. A-3 Logof Borings .................................. A-4 AppendixB........................................ B-1 Consolidation Test Data ......................... B-2 Grain Size Distribution Data .................... B-4 Hveem Stabilometer Data ......................... B-5 Summary of Test Results ......................... B-6 AppendixC........................................ C-1 i REPORT OF A GEOTECHNICAL INVESTIGATION FOR PROPOSED AUTOZONE STORE NORTH COLLEGE AVENUE FORT COLLINS, COLORADO AUTOZONE, INC. MEMPHIS, TENNESSEE PROJECT NO. 2093-5081 EMPIRE LABORATORIES, INC. A DIVISION OF THE TERRACON COMPANIES, INC. 301 NORTH HOWES STREET FORT COLLINS, COLORADO 80521