Loading...
HomeMy WebLinkAboutPARK SOUTH COMMERCIAL PLAZA, 2ND FILING, LOT 2B, CARWASH - PDP - 37-94E - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYHCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 12/12/2003 Analysis Time Period: am� Intersection: Horsetooth/RT Access Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: short kgr tota Project ID: 0381me01 East/West Street: Horsetooth Road North/South Street: RT Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R I L T R Volume 995 30 Peak -Hour Factor, PHF 0.90 0.90 Hourly Flow Rate, HFR 1105 33 Percent Heavy Vehicles -- -- -- -- Median Type/Storage Undivided / RT Channelized? No Lanes 2 1 Configuration T R Upstream Signal? Yes No Minor Street: Approach Northbound Southbound Movement 7 8 9 1 10 11 12 L T R I L T R Volume 55 Peak Hour Factor, PHF 0.85 Hourly Flow Rate, HFR 64 Percent Heavy Vehicles 2 Percent Grade M 0 0 Flared Approach: Exists?/Storage Lanes 1 Configuration R Approach Movement Lane Config Delay, Queue Length, and Level of Service EB WB Northbound Southbound 1 4 j 7 8 9 1 10 11 12 I R I v (vph) 64 C(m) (vph) 646 v/c 0.10 95o queue length 0.33 Control Delay 11.2 LOS B Approach Delay 11.2 Approach LOS B 17 HCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 12/12/2003 Analysis Time Period: am pm Intersection: Horsetooth/RT Access Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: shor bkgrd total Project ID: 0381me01 East/West Street: Horsetooth Road North/South Street: RT Access Intersection Orientation: EW Study period (hrs): 0.25 Major Street: Vehicle Volumes and Adjustments Approach Eastbound Westbound Movement 1 2 3 1 4 5. L T R I L T I Volume 1530 15 Peak -Hour Factor, PHF 0.85 0.85 Hourly Flow Rate, HFR 1799 17 Percent Heavy Vehicles -- -- -- -- Median Type/Storage Undivided / RT Channelized? No Lanes 2 1 Configuration T R Upstream Signal? Yes No Minor Street: Approach Northbound Southbound Movement 7 8 9 I 10 11 12 L T R I L T R Volume 20 Peak Hour Factor, PHF 0.85 Hourly Flow Rate, HFR 23 Percent Heavy Vehicles 2 Percent Grade M 0 0 Flared Approach: Exists?/Storage. Lanes 1 Configuration R Approach Movement Lane Config Delay, Queue Length, and Level of Service EB WB Northbound Southbound 1 4 1 7 8 9 I 10 11 12 I R I v (vph) 23 C(m) (vph) 495 v/c 0.05 95o queue length 0.15 Control Delay 12.6 LOS B Approach Delay 12.6 Approach LOS B HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: Horsetooth/Manhatten Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 12/11/2003 Jurisd: Fort Collins �� Period: a pm Year recent short bkgrd otal Project ID: 0381 E/W St: Horsetooth Road N/S St: Manhatten Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R 1 L T R 1 I I I I I No. Lanes 1 1 2 0 I 1 2 1 I 1 1 0 1 1 1 0 1 LGConfig I L TR I L T R I L TR I L TR 1 Volume 120 790 35 1250 1255 85 135 IS 150 185 70 40 1 Lane Width 112.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 1 RTOR Vol I 0 1 0 1 0 i 0 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A Thru P I Thru A Right P I Right A Peds X I Peds X WB Left A P 1 SB Left A Thru P I Thru A Right P I Right A Peds X I Peds X NB Right I EB Right SB Right I WB Right Green 6.0 60.0 24.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) V/c g/C Delay LOS Delay LOS Eastbound L 276 1770 0.08 0.67 2.8 TR 2110 3517 0.43 0.60 6.9 Westbound L 423 1770 0.66 0.67 6.4 T 2123 3539 0.66 0.60 9.2 R 950 1583 0.10 0.60 5.1 Northbound L 297, 1187 0.13 0.25 29.3 TR 386 1609 0.48 0.24 33.5 Southbound L 243 972 0.39 0.25 32.2 TR 423 1762 0.29 0.24 31.4 Intersection Delay = 11.3 (sec/veh) A A 6.8 A A A 8.5 A A C C 32.8 C C C 31.7 C Intersection LOS = B HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: Horsetooth/Manhatten Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 12/11/2003 Jurisd: Fort Collins Period: am pm Year recent short bkgrd total Project ID: 0381 E/W St: Horsetooth Road N/S St: Manhatten Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I L T R I L T R I L T R I L T R I I I I No. Lanes I 1 2 0 I 1 2 1 I 1 1 0 I 1 1 0 LGConfig I L TR I L T R I L TR I L TR Volume 140 1245 30 165 425 45 150 80 235 165 15 10 Lane Width 112.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 RTOR Vol I 0 1 0 1 0 I 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A Thru P I Thru A Right P I Right A Peds X I Peds X WB Left A P I SB Left A Thru P I Thru A Right P I Right A Peds X 1 Peds X NB Right i EB Right SB Right I WB Right Green 6.0 56.0 28.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 _ Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/C g/C Delay LOS Delay LOS Eastbound L 588 1770 0.08 0.63 3.6 TR 1975 3527 0.76 0.56 14.0 Westbound L 219 1770 0.32 0.63 6.7 T 1982 3539 0.23 0.56 7.6 R 886 1583 0.05 0.56 6.7 Northbound L 385 1327 0.15 0.29 26.6 TR 463 1654 0.80 0.28 43.0 Southbound L 145 500 0.52 0.29 33.2 TR 490 1751 0.06 0.28 26.4 Intersection Delay = 17.4 (sec/veh) A B 13.6 B A A 7.4 A A C D 40.7 D C C 31.3 C Intersection LOS = B secs 1 4- APPENDIX D 15 HCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 12/12/2003 Analysis Time Period: am(:Pi> Intersection: Horsetooth/RT Access Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: horn kgr total Project ID: 0381me01 East/West Street: Horsetooth Road North/South Street: RT Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 .I 4 5 6 L T R I L T R Volume 995 25 Peak -Hour Factor, PHF 0.90 0.90 Hourly Flow Rate, HFR 1105 27 Percent Heavy Vehicles -- -- -- -- Median Type/Storage Undivided / RT Channelized? No Lanes 2 1 Configuration T R Upstream Signal? Yes No Minor Street: Approach Northbound Southbound Movement. 7 8 9 1 10 11 12 L T R I L T R Volume 40 Peak Hour Factor, PHF 0.85 Hourly Flow Rate, HFR 47 Percent Heavy Vehicles 2 Percent Grade M 0 0 Flared Approach: Exists?/Storage / Lanes 1 Configuration R Approach Movement Lane Config r Delay, Queue Length, and Level of Service EB WB Northbound Southbound 1 4 17 8 9 1 10 11 12 R I v (vph) 47 C(m) (vph) 644 v/c 0.07 95% queue length 0.24 Control Delay 11.0 LOS B Approach Delay 11.0 Approach LOS B IZ_ HCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 12/12/2003 Analysis Time Period: am�)pm Intersection: orsetooth/RT Access Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: hort bkgrd total Project ID: 0381me01 East/West Street: Horsetooth Road North/South Street: RT Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R I L T R Volume 1530 10 Peak -Hour Factor, PHF 0.85 0.85 Hourly Flow Rate, HFR 1799 11 Percent Heavy Vehicles -- -- -- -- Median Type/Storage Undivided / RT Channelized? No Lanes 2 1 Configuration T R Upstream Signal? Yes No Minor Street: Approach Northbound Southbound Movement 7 8 9 1 10 11 12 L T R I L T R Volume 10 Peak Hour Factor, PHF 0.85 Hourly Flow Rate, HFR 11 Percent Heavy Vehicles 2 Percent Grade M 0 0 Flared Approach: Exists?/Storage Lanes 1 Configuration R Approach Movement Lane Config v (vph) C(m) (vph) v/c 95% queue length Control Delay LOS Approach Delay Approach LOS Delay, Queue Length, and Level of Service EB WB Northbound Southbound 1 4 1 7 8 9 1 10 11 12 1 R I 9.9 A 11 740 0.01 0.05 9.9 A • HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: Horsetooth/Manhatten Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 12/11/2003 Jurisd: Fort Collins _ Period: am it Year recent short kgr total Project ID: 0381 E/W St: Horsetooth Road N/S St: Manhatten Avenue Eastbound I L T R I No. Lanes I 1 2 0 LGConfig I L TR Volume 120 785 30 Lane Width 112.0 12.0 RTOR Vol 1 0 SIGNALIZED INTERSECTION SUMMARY I Westbound I Northbound I Southbound I I L T R I L T R I L T R I I I I I I 1 2 1 I 1 1 0 I 1 1 0 I i L T R I L TR 1 L TR I 1235 1255 85 125 15 150 185 70 40 I 112.0 12.0 12.0 112.0 12.0 112.0 12.0 I I 0 1 0 1 0 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 & EB Left A P I NB Left A Thru P I Thru A Right P I Right A Peds X I Peds X WB Left A P I SB Left A Thru P i Thru A Right P I Right A Peds X I Peds X NB Right I EB Right SB Right I WB Right Green 6.0 60.0 24.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/C g/C Delay LOS Delay LOS Eastbound L 299 TR 2112 Westbound 1770 0.07 0.67 2.6 A 3520 0.43 0.60 6.8 A 6.7 A L 428 1770 0.57 0.67 4.4 A T 2123 3539 0.62 0.60 8.6 A 7.8 A R 950 1583 0.09 0.60 5.1 A Northbound L 291 1162 0.10 0.25 29.0 C TR 386 1609 0.50 0.24 33.9 C 33.3 C Southbound L 235 939 0.43 0.25 32.7 C TR 423 1761 0.30 0.24 31.6 C 32.1 C Intersection Delay = 11.2 (sec/veh) Intersection LOS = B secs 10 HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: Horsetooth/Manhatten Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 12/11/2003 Jurisd: Fort Collins Period: am pm Year recent shor bkgr total Project ID: 0381 E/W St: Horsetooth Road N/S St: Manhatten Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound 1 Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R I I I I I I No. Lanes i 1 2 0 1 1 2 1 I 1 1 0 I 1 1 0 1 LGConfig I L TR I L T R I L TR I L TR Volume 140 1240 25 155 425 45 145 80 235 165 15 10 I Lane Width 112.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 1 RTOR Vol 1 0 1 0 1 0 1 0 I Duration 0.25 Area Type: All other areas Signal Operations _ Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A Thru P I Thru A Right P I Right A Peds X I Peds X WB Left A P I SB Left A Thru P I Thru A Right P I Right A Peds X I Peds X NB Right I EB Right SB Right i WB Right Green 6.0 56.0 28.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 588 1770 0.08 0.63 3.6 A TR 1976 3529 0.75 0.56 13.8 B 13.5 B Westbound L 221 1770 0.27 0.63 6.3 A T 1982 3539 0.23 0.56 7.6 A 7.4 A R 886 1583 0.05 0.56 6.7 A Northbound L 385 1327 0.14 0.29 26.4 C TR 463 1654 0.80 0.28 43.0 D 40.9 D Southbound L 145 500 0.52 0.29 33.2 C TR 490 1751 0.06 0.28 26.4 C 31.3 C Intersection Delay = 17.3 (sec/veh) Intersection LOS = B APPENDIX C z Table 4-3 Fort Collins (City Limits) Motor Vehicle LOS Standards (Intersections) Land Use (from structure plan) Other corridors within: Low density Intersection type Commercial Mixed use mixed use All other corridors districts residential areas Signalized intersections D E" D D (overall) Any Leg E E D E Any Movement E E D E Stop sign control N/A F" F" E (arterial/collector or local — any approach leg Stop sign control N/A C C C (collector/local—any approach leg) mitigating measures required " considered normal in an urban environment UNSIGNA..LIZED INTERSECTIONS I cvc{ crG-ticrcicc: Avcragc 7'ot:r1 Delay sec/vch --- 10 ---- 13 _ _C, > 10 and < 15 �-- > 15 and < 2.5 ---- — 1:� -- > 25 and --35 35 and < SO SIGNALIZED INTERSECTIONS l: cvel-of-Service -- AverageTotal Delay sex/vch A --- < 10 13 -------�; --- — > 10 and < 20 -- > 20 and < 35 -- -- --- [, -----1, -- > $Sand _< 80 --- — -- — SO -- 49 HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: Horsetooth/Manhatten Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 12/11/2003 Jurisd: Fort Collins Period: am pi Year ecent'short bkgrd total Project ID: 0381 E/W St: Horsetooth Road NIS St: Manhatten Avenue SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound I Northbound I Southbound I L T R I L T R I L T R I L T R I I I I No. Lanes 1 1 2 0 1 1 2 1 I 1 1 0 1 1 1 0 LGConfig I L TR I L T R I L TR I L TR Volume 118 772 27 1235 1236 84 122 15 148 185 70 36 Lane Width 112.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 RTOR Vol I 0 1 0 1 0 I 0 Duration 0.25 Area Type: All other areas Signal Operations_ Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P 1 NB Left A Thru P 1 Thru A Right P I Right A Peds X I Peds X WB Left A P 1 SB Left A Thru P I Thru A Right P I Right A Peds X 1 Peds X NB Right I EB Right SB Right I WB Right Green 6.0 60.0 24.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 303 1770 0.07 0.67 2.6 TR 2113 3521 0.42 0.60 6.8 Westbound L 435 1770 0.56 0.67 4.2 T 2123 3539 0.61 0.60 8.5 R 950 1583 0.09 0.60 5.1 Northbound L 295 1180 0.09 0.25 28.9 TR 386 1610 0.50 0.24 33.8 Southbound L 236 945 0.42 0.25 32.7 TR 424 1768 0.29 0.24 31.4 Intersection Delay = 11.1 (sec/veh) A A 6.7 A A A 7.7 A A C C 33.2 C C C 32.0 C Intersection LOS = B secs HCS2000: Signalized Intersections Release 4.1d Analyst: Michael Inter.: Horsetooth/Manhatten Agency: Matthew J. Delich, P.E. Area Type: All other areas Date: 12/11/2003 Jurisd: Fort Collins Period• am pm Year ecent short bkgrd total Project ID: 0381 E/W St: Horsetooth Road N/S St: Manhatten Avenue SIGNALIZED INTERSECTION SUMMARY Eastbound I Westbound 1 Northbound I Southbound 1 L T R I L T R I L T R I L T R I I i I No. Lanes I 1 2 0 I 1 2 1 I 1 1 0 1 1 1 0 LGConfig I L TR I L T R I L TR I L TR Volume 136 1220 21 155 415 42 143 76 232 161 14 9 Lane Width 112.0 12.0 112.0 12.0 12.0 112.0 12.0 112.0 12.0 RTOR Vol 1 0 1 0 1 0 1 0 Duration 0.25 Area Type: All other areas Signal Operations _ Phase Combination 1 2 3 4 1 5 6 7 8 EB Left A P I NB Left A Thru P I Thru A Right P I Right A Peds X I Peds X WB Left A P I SB Left A Thru P I Thru A Right P I Right A Peds X I Peds X NB Right I EB Right SB Right 1 WB Right Green 6.0 56.0 28.0 Yellow 0.0 3.0 3.0 All Red 0.0 2.0 2.0 Cycle Length: 100.0 Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound L 593 1770 0.07 0.63 3.6 TR 1977 3530 0.74 0.56 13.4 Westbound L 228 1770 0.26 0.63 6.0 T 1982 3539 0.23 0.56 7.6 R 886 1583 0.05 0.56 6.7 Northbound L 386 1330 0.13 0.29 26.4 TR 463 1652 0.78 0.28 41.6 Southbound L 151 521 0.48 0.29 31.6 TR 490 1749 0.06 0.28 26.4 Intersection Delay = 16.9 (sec/veh) A B 13.2 B A A 7.4 A A C D 39.8 D C C 30.2 C Intersection LOS = B secs 0 APPENDIX B 3 MATTHEW J. DELICH, P.E. 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 1.16-02 Observer: City of Fort Collins Day: Wednesday Jurisdiction: Fort Collins R = right turn intersection: Horsetooth/Manhatten S = straight L -ion U111 Time Begins Northbound: Manhatten Southbound: Manhatten Total north/south Eastbound: Horsetooth Westbound: Horsetooth Total easttwest Total All L S R Total L S R Total L S R Total L S R Total 7:30 15 38 57 110 -.. 14 3 0 17.., 127 12 299 5 316.:' 9 92 7 108 424 551 7:45 6 19 65 17 6 2 15, 115 14 373 8 11 107 12 130 525 640 8-00 7 10 141 58:' 21 2 3 -26 84 6 300 4 310, 16 110 10 136 446 —r75TI 530 15 9 93. :4'1 9 3 4 116::- 109 4 248 4 J.' 2 56 — 19 106 13 138 394 7:30-8:30 1 43'.]!70.]212 351 J.611; 9] 84 1 435 PHF 0.8 0.81 1277 155`1415 142'1 512 0.81 1 0.93 1789 1 2224 4:00 13 4 1 38 5 20 14 15 104 7 195 1 6 1: 268 66 267 25 1 358 566 1 670 4:15 10 8 46 31 8 3 1".'%'42-::. 106 3 200 1 7 1 210 47 288 22 357 567 673 4:30 7 2 34 16 17 14 41 90 8 202 1 7 1 2117 52 31 3 19 384 601 691 4:45 5 4 35 -�,'44 32 24 9 66,' 109 5 213 1 8 [:-.122.6 64 286 22 372 598 707 5:00 6 5 25 �� 1.0 23 18 10 51 87 3 167 8 �178 53 319 24 396, 574 661 5:15 4 4 54 62 14 11 3 90 2 190 4 '196 66 318 1 19 403 599 689 5:30 4 4 29 37, 1 9 16 2 64 3 169 11 :183, 59 304 2�7 3" 573 637 , 5:45 8 3 26 19 13 6 38 75 3 187 7 :107 63 2742 366 563 638 4:30-5:30 1-15, 1146'1 185 191 1 376 '18" 1772 ]--27:,'j 817 1235 1236 84: 1 1555 2372 2748 PHIF 1 0.75 1 1 0.73 1 1 0.9 1 1 0.96 APPENDIX A TABLE 3 Short Range (2005) Background Peak Hour Operation 001 S' EB B A WB A A Horsetooth/Manhaftan (signal) NB D C SB C C OVERALL B B Horsetooth/RT Access (RT-in/RT-out) NB RT A B TABLE 3 Short Range (2005) Background Peak Hour Operation M g el z ---- PRO mw EB B A WB A A Horsetooth/Manhaftan (signal) NB D C SB C C OVERALL B B Horsetooth/RT Access (RT-in/RT-out) NB RT B B Horse - w — - Denotes Lane A& N SHORT RANGE (2005) GEOMETRY Figure 8 Y L 3 ca cc a) or o � CC) 45/85 I� �I `ID f 425/1255 J j l /— 65/250 Horsetooth 40/20 t 1530/995 — 1245/790 —� Ln LD 0 15/30 LO 30/35 y `(D � �" � u' N LO 00 iB N N N Um U Q C (Q t C --m*— AM/PM Rounded to Nearest 5 Vehicles SHORT RANGE (2005) TOTAL PEAK HOUR TRAFFIC N Figure 7 k A& N Y m f9 3 0 m CD r: 0 0 Ln o X) � 45/85 I� I� C0 — 425/1255 J ♦ � � 55/235 Horsetooth 40/20 1530/995f r —� 10/2 1240f785 —� 5 Un uO o 25/30 N � `r o v � n r cf w N N Um U Q H C (6 m f4 L C . 4 AM/PM Rounded to Nearest 5 Vehicles SHORT RANGE (2005) BACKGROUND Figure 6 PEAK HOUR TRAFFIC Horse c co 2 �- AM/PM po SITE GENERATED Figure 5 PEAK HOUR TRAFFIC Horsi Y i m 3 c m N TRIP DISTRIBUTION Figure 4 TABLE I Current (2002) Peak Hour Operation T17 U, A, EB B A WB A A Horsetooth/Manhaftan (signal) NB D C SB C C OVERALL B B TABLE 2 Trip Generation 1�1`, 7Y, mp- lit 941 Quick Lube 3 Bar 40.00 120 2.01 6 0.99 3 286 9 2.33 7 947 Setf-Serve Car Wash 6 Bays 108.00 648 NIA 9 N/A 8 2.83 17 2.71 16J Total 748 15 11 26 3 23 CDC m T Tl to 1 36/18 1220/772 �_- 21/27 Y 3 0 co m m OE 42184 �- 415/1236 55/235 �*]4r N lf) Co T V T v r N C m w (0 L C fE —a— AM/PM Horsetooth N RECENT PEAK HOUR TRAFFIC Figure 3 A& N NO SCALE SITE PLAN Figure 2 ca m U U Valvoline Lube/ Car Wash I c 0 U) m SCALE: 1"=1000• SITE LOCATION Figure 1 forecasts for the short range (2005) future were obtained by reviewing traffic studies for other developments in this area and reviewing historic counts in the area. It was determined that peak hour traffic along Horsetooth Road and Manhattan Avenue are stable. Table 3 shows the short range (2005) background peak hour operation at the key intersections. Calculation forms are provided in Appendix C. The key intersections will operate acceptably with existing control and geometry. Figure 7 shows the short range (2005) total peak hour traffic at the key intersections. Table 4 shows the short range (2005) total peak hour operation at the key intersections. Calculation forms are provided in Appendix D. The key intersections will operate acceptably during the peak hours. Figure 8 shows the short range (2005) . geometry at the key intersections, which is the existing geometry. The Valvoline Lube/Car Wash site is the area within which the City requires pedestrian and bicycle level of service evaluations. However, given that this land use is specifically for automobiles, it is reasonable to assume that there will be very little pedestrian or bicycle traffic related to this development proposal. There are existing sidewalks along the Valvoline Lube/Car Wash frontage. In addition, there are existing bike lanes along Horsetooth Road and Manhattan Avenue. Currently, this area is served by transit service Routes 6, 62, and 63. It is concluded that, with the Valvoline Lube/Car Wash, the future level of service at the key intersections will be acceptable. The level of service for pedestrian, bicycle, and transit modes will be acceptable. RE MEMORANDUM®Q 00 PV`� °. Oc o TO: Dan Bernth ;� r I CO00 City of Fort Collins • � .• O o a rn FROM: Matt Delich d' er �`SrONA�- aDATE: December 11, 2003 U • X SUBJECT: Valvoline Lube/Car Wash transportation analyses z li (File: 0381ME01) a J W This memorandum addresses the transportation impacts of the proposed Valvoline Lube/Car Wash. The Valvoline Lube/Car Wash is • W CD o proposed to be located on the south side of Horsetooth Road just east > of Manhattan Avenue. The site location is shown in Figure 1. The cr 0 CD site plan for Valvoline Lube/Car Wash is shown in Figure 2. There is a raised median on Horsetooth Road in this area. As proposed, UJ rn Valvoline Lube/Car Wash will consist of three auto service bays, four = self -serve car wash bays, and two automated car wash bays. The scope Jz of this study was discussed with the Fort Collins Traffic Engineer. o Technically, a transportation impact study is not required, since N n this land use will generate less than 50 trip ends in the peak hour rl- N and there are adequate bicycle and pedestrian facilities in the area. N A brief memorandum was requested. This land use will not generate pedestrian or bicycle trips. There are sidewalks along adjacent streets and bike lanes on Horsetooth Road and Manhattan Avenue. Figure 3 shows recent peak hour counts at the Horsetooth/ Manhattan intersection. The count data was obtained in January 2002. Raw traffic data is provided in Appendix A. Table 1 shows the current operation of the Horsetooth/Manhattan intersection. Calculation forms are provided in Appendix B. A description of level of service for signalized and unsignalized intersections from the 2000 Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are also provided in Appendix B. {j The Horsetooth/Manhattan intersection operates acceptably during the afternoon peak hour. The traffic volume on the adjacent street is 0. Z less during the Saturday peak hour as compared to the weekday w afternoon peak hour. Therefore, the operation of the subject Z intersection is acceptable on a Saturday. ® Z The Valvoline Lube/Car Wash is proposed to have three auto Zservice bays, four self -serve car wash bays, and two automated car UJ o wash bays with access to Horsetooth Road and Manhattan Avenue. Table ® a 2 shows the trip generation for Valvoline Lube/Car Wash. Trip oGeneration, 7t" Edition, ITE was used as a reference in calculating CL the trip generation. There was no information regarding morning peak z hour trip generation for the car wash. Weekday morning peak hour trip generation is not likely to be significant. Therefore, it was assumed that the morning peak hour trip generation for the car wash UJ ad would be 50% of the afternoon peak hour. The trip distribution for g 2 this site is shown in Figure 4. Figure 5 shows the site generated F- LL a traffic assignment of the Valvoline Lube/Car Wash. Q ~ Figure 6 shows the short range (2005) background peak hour traffic at the key intersections. Background traffic volume