This transportation impact study addresses the capacity, geometric,
and control requirements at and near the proposed Autawash located in the
southeast portion of the Hors etooth/Manhattan intersection in Fort Collins,
Colorado. The transportation study will address potential vehicular
impacts upon the roadway system, the pedestrian network surrounding the
study area, the bicycle system, and the availability of transit facilities.
Traffic projections will be prepared for future Years 2003 and 2020.
During the course of the analysis, numerous contacts were made with
the project planner, the owner/developer, and City staff. This study
generally conforms to the format set forth in the Fort Collins
Transportation Impact Study Guidelines. The study involved the following
steps:
=Collect physical, traffic, and development data;
Perform trip generation, trip distribution, and trip assignment;
Determine peak hour traffic volumes and daily traffic volumes;
- Conduct capacity and operational level of service analyses for all
pertinent modes of transportation.
This report is prepared for the following purposes:
- Evaluate the existing conditions;
- Estimate the trip generation by the proposed/assumed developments;
- Determine the trip distribution of site generated traffic;
- Evaluate level of service;
- Determine the geometrics at key intersections;
- Determine the impacts of site generated traffic at key intersections.
Information used in this report was obtained from the City of Fort
Collins, the planning and engineering consultants, the developers, research
sources (ITE, TRB, etc.), and field reconnaissance. The following traffic
studies were reviewed and considered in preparing this study:
- Warren Farms, 1998
- Park South, 1996
1
LEI
LIST OF FIGURES
Figure
Site Location ........................................
Page
3
1.
2.
Recent Peak Hour Traffic .............................
4
3.
Site Plan ............................................
9
9.
Trip Distribution ....................................
11
5.
Site Generated Traffic ...............................
11
6.
Short Range Background Traffic .......................
13
7.
Long Range Background Traffic .........................
13
S.
Short Range Total Traffic ............................
15
9_
Long Range Total Traffic .............................
15
10.
Short Range and Long Range Geometry
.................. 20
APPENDIX
A Recent Peak Hour Traffic
B Current Peak Hour Operation
C Description of Level of Service
D Short Range Background Traffic Analyses
E Short Range Total Traffic Analyses
F Long Range Background Traffic Analyses
G Long Range Total Traffic Analyses
H Pedestrian, Bicycle, and Transit Level of Service
TABLE OF CONTENTS
I.
Introduction .........................................
Paae
1
II.
Existing Conditions ..................................
2
LandUse .............................................
2
Roads................................................
2
Existing Motor Vehicle Traffic .......................
2
Existing Motor Vehicle Operation .....................
5
Pedestrian Facilities ................................
5
Bicycle Facilities ...................................
5
Transit Facilities ...................................
7
III.
Proposed Development .................................
8
Trip Generation ......................................
8
Trip Distribution ....................................
8
Trip Assignment ......................................
8
IV.
Future Background Traffic Projections
................
12
Short Range Background Traffic .......................
12
Long Range Background Traffic ........................
12
V.
Future Total Traffic Projections .....................
14
Short Range Total Traffic ............................
14
Long Range Total Traffic .............................
14
VI.
Traffic Impact Analysis ..............................
16
Short Range Traffic Analysis .........................
16
Long Range Traffic Analysis ..........................
16
Geometry .............................................
19
Pedestrian Level of Service .........................
19
Bicycle Level of Service .............................
19
Transit Level of Service .............................
19
VII.
Conclusions ..........................................
21
LIST OF TABLES
W=-
1.
Current Peak Hour Operation ..........................
6
2.
Trip
Generation
......................................
10
3.
Short
Range Peak
Hour Background Traffic Operation ...
17
4.
Short
Range Peak
Hour Total Traffic Operation ........
17
5.
Long
Range Peak
Hour Background Traffic Operation ....
18
6.
Long
Range Peak
Hour Total Traffic Operation .........
18
AUTAWASH
TRAFFIC IMPACT STUDY
FORT COLLINS, COLORADO
APRIL 1999
Prepared for:
Autawash of Colorado, LLC
P.O. Box 3558
Englewood, CO 80155
Prepared by:
MATTHEW J. DELICH, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034