3. The reduced sidewalk width will not diverge from the standard width except
in a nominal or inconsequential way considering from the perspective of
the entire development plan and pedestrian needs on the site.
E. With respect to Section 3.5.3(B) (1) of the LUC which sets forth the
requirement for the orientation of commercial buildings:
1. Granting the requested modification would not be detrimental to the public
good and would not impair the intent and purposes of the Land Use Code.
2. Strict application of the standard would result in unusual or exceptional
practical difficulties by reason of an existing narrow lot configuration and a
predetermined access point to the abutting site to the east. Such physical
hardships were not caused by the act or omission of the applicant.
DECISION
The Park South Commercial Plaza, 2"d Filing, Lot 2-13- Horsetooth Carwash
Project Development Plan #37-94E, including modifications to Sections 3.2.2
(C)(5)(a) and 3.5.3(B)(1), is hereby approved by the Hearing Officer subject to the
following condition:
The Applicant shall revise the Site Plan to include crosswalks enhanced with
differentiated surface treatment at the following locations:
1. Within the north -south pedestrian crossing at the east end of the property
straddling Lots 1 and 2; and
2. With the northern, east -west pedestrian crossing on Lot 2.
Dated this 2nd day of March 2005, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code. / fir`
�ameron Gloss
Current Planning Director
Park South Commercial Plaza Horsetooth Carwash PDP
Administrative Hearing
Findings, Conclusions, and Decision
March 1, 2005
Page 4 of 4
carry very limited volumes of pedestrian traffic, reducing the likelihood that
pedestrians will have physical conflicts as a result of the 12 inch reduction
in width. Therefore, the sidewalk will be of sufficient width to safely
accommodate pedestrian movements.
The applicant's request for a modification to the requirement that at least
one main entrance of a commercial building face and open directly on to a
connecting walkway with pedestrian frontage is also appropriate given
existing site conditions. The siting of the retail building on Lot 2 is limited
due to the site dimensions and the need to accommodate emergency
access requirements and access to service bays for commercial tenants.
Although the site plan will require pedestrians to cross drive aisles in two
locations, the crossing distance will be relatively short. To further
demarcate the pedestrian crossings, the Hearing Officer will require that
special paving treatment be provided within these two pedestrian crossing
areas.
SUMMARY OF CONCLUSIONS
A. The Park South Commercial Plaza , 2nd Filing, Lot 2B, Horsetooth Carwash
Project Development Plan is subject to administrative review and the
requirements of the Land Use Code (LUC).
B. The Park South Commercial Plaza, 2nd Filing, Lot 213, Horsetooth Carwash
Project Development Plan satisfies the development standards of the C
zoning district.
C. The Park South Commercial Plaza , 2"d Filing, Lot 2B, Horsetooth Carwash
Project Development Plan complies with all applicable General
Development Standards contained in Article 3 of the Land Use Code except
for Sections 3.2.2(C)(5)(a) and 3.5.3(B)(1).
D. With respect to the requested modification to Section 3.2.2(C)(5)(a) of the
LUC which sets standards for walkways:
1. Granting the requested modification would not be detrimental to the public
good and would not impair the intent and purposes of the Land Use Code.
2. Strict application of the standard would result in unusual or exceptional
practical difficulties by reason of an existing narrow lot configuration. Such
hardship was not caused by the act or omission of the applicant.
Park South Commercial Plaza Horsetooth Carwash PDP
Administrative Hearing
Findings, Conclusions, and Decision
March 1, 2005
Page 3 of 4
Written Comments:
None
FACTS AND FINDINGS
The property was annexed into the City of Fort Collins in July of 1978 as part of the
Horsetooth-Harmony Annexation.
The surrounding zoning and land uses are as follows:
N: MMN; multi -family residential (Preserve @ the Meadows),
E: C; theater (Carmike)
S: C; mini -storage (Manhattan Storage)
W: C; retail (AutoZone)
Compliance with Article 4 and the C Zoning District Standards:
The Project Development Plan complies with all applicable requirements of
Article 4 and the C Zoning District. The proposed car wash, which is considered
a vehicle maintenance establishment, along with the proposed retail store(s), are
uses permitted subject to Administrative Review. The Staff Report summarizes
the PDP's compliance with these specific standards and no specific evidence
was presented to contradict the statements and conclusion of the staff report
concerning compliance with Article 4 or the C District Standards.
2. Compliance with Article 3 of the Land Use Code — General Development
Standards
The Project Development Plan complies with all applicable requirements of
Article 3, including the plat standards of Section 3.3.1, except for two sections of
the Land Use Code where the applicant submitted a request for modifications to
these specific standards. No evidence was presented to contradict the
statements and conclusion of the staff report concerning compliance or to
otherwise refute the compliance with Article 3.
The applicant's request to reduce the sidewalk width along the east side of the
property (on proposed Lot 1) to five (5) feet, where a minimum of six (6) feet is
required under Section 3.2.2(C)(5)(a) Walkways, is appropriate given pre-existing
site constraints. The site is relatively narrow along the east -west axis and strict
compliance with the sidewalk standard will negatively affect the turning radius of
vehicles exiting the car wash bays. It is also anticipated that this sidewalk will
Park South Commercial Plaza Horsetooth Carwash PDP
Administrative Hearing
Findings, Conclusions, and Decision
March 1, 2005
Page 2 of 4
STAFF RECOMMENDATION: Approval
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established
no controversy or facts to refute that the hearing was
properly posted, legal notices mailed and notice
published.
PUBLIC HEARING
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the
hearing at approximately 3:00 p.m. on March 1, 2005 in Conference Room A at 281
North College Avenue, Fort Collins, Colorado.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The Hearing Officer accepted during the hearing the following evidence: (1) Planning
Department Staff Report; (2) application, plans, maps and other supporting documents
submitted by the applicant and the applicant's representatives to the City of Fort Collins;
(3) a sign up sheet of persons attending the hearing and citizens speaking in favor of or
against the application, and (4) a tape recording of testimony provided during the
hearing. The LUC, the City's Comprehensive Plan (City Plan), and the formally
promulgated policies of the City are all considered part of the evidence considered by
the Hearing Officer.
The following is a list of those who attended the meeting:
From the City:
Steve Olt, City Planner
From the Applicant:
Dan Bernth, Doberstein Lemburg
Rhey Wright, Owner
Oussama Abbas, The Architect's Studio
Carr Bieker, The Architect's Studio
Dave Carlson, Cottier Construction
Patricia Kroetch, North Star Design
From the Public:
►[.TiT
City of Fort Collins
Comn.unity Planning and Environment. Services
Current Planning
CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE:
PROJECT NAME:
CASE NUMBER:
APPLICANT:
Lel"I9i"IA:a
HEARING OFFICER:
March 1, 2005
Park South Commercial Plaza, 2nd
Filing, Lot 213- Horsetooth Carwash,
Project Development Plan
#37-94E
Doberstein Lemburg Commercial, Inc.
c/o Dan Bernth
1537 Riverside Avenue
Fort Collins. CO 80524
243 N. College Associates LTD, LLLP
2281 South Havana Street, Suite 200
Denver, CO 80237
Cameron Gloss
Current Planning Director
PROJECT DESCRIPTION: The applicant proposes to develop a 2-phase commercial
project including an automated & self serve car wash and a retail/auto-related use
building on Lot 213 of the Park South Commercial Plaza. The car wash building will be
4,056 square feet in area and located on the north half of the property (proposed Lot 1).
The retail/auto-related use building will be 4,733 square feet and located on the south
half of the site (proposed Lot 2). The property is located on the south side of W.
Horsetooth Road, east of Manhattan Avenue and the existing Autozone retail building
and west of the Carmike Theaters.
SUMMARY OF HEARING OFFICER DECISION: Conditional Approval
ZONING DISTRICT: Commercial — (C)
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020