HomeMy WebLinkAboutPARK SOUTH COMMERCIAL PLAZA, 2ND FILING, LOT 2B, CARWASH - PDP - 37-94E - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (4)Water/Wastewater:
1. The development plan does not provide sufficient cover over the
water and sanitary sewer services.
Natural Resources:
1. Please contact Doug Moore, at 224-6143, for information on a
trash enclosure that can be designed to provide recycling.
This completes staff (and outside reviewing agencies) review and
comments at this time. Red -lined plan from City departments are
included with this comment letter. Additional comments and red -lined
plans may be forthcoming. Another round of staff review is
determined to be necessary. This proposal is subject to the 90-day
revision re -submittal requirement (from the date of this comment
letter, being May 25, 2004) as set forth in Section 2.2.11(A) of the
Land Use Code. Be sure and return all of your red -lined plans when
you re -submit. The number of copies of each document to re -submit is
shown on the attached Revisions Routing Sheet.
If you have any questions regarding these issues or any other issues
related to this project, please feel free to call me at 221-6341.
Yours Truly,
Steve Olt,
City Planner
cc: Katie Moore
The Architects' Studio
Jim Sell Design
Current Planning File #37-94E
Page 8
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Landscape Plan
Number: 76 Created: 5/19/2004
(5/19/041 Show all water and sewer lines and maintain the required
landscape/utility separation distances on the landscape plans.
Topic: Utility Plans
Number: 77 Created: 5/19/2004
[5/19/041 Maintain the minimum cover over the fire line and water
service as it passes through the detention pond.
See site, landscape and utility plans for other comments.
The following comments and concerns were expressed at staff review
on May 19, 2004:
Engineering:
1. Xcel Energy has a concern about the separation between their
existing gas main and the proposed north face of the building in
Phase One.
2. The proposed overhang into the utility easement, for the north
face of the building, could be problematic.
3. There is a concern about the u-shaped fire access going from
parking lot to parking lot, potentially without an emergency
access easement in the existing parking lot.
4. The sheet titles need to be made consistent with one another.
Transportation Planning:
1.o, Is the car wash to be an attended facility or a completely
automated facility?
2. A direct pedestrian connection may be needed.
3. A bicycle rack probably is not needed for this facility.
4. Please schedule a meeting with Tom Reiff to discuss his issues,
concerns. He can be reached at 416-2040.
Light & Power:
1. More definition is needed for the street right-of-way and
utility easements. This will have an effect on the placement of
the electric transformer.
Page 7
Number: 60 Created: 5/17/2004
At final design, the detention pond needs to be discussed as to what
might be required due to there being two ponds connected with a
culvert. The culvert might need to be sized to carry the 100-year
flow for some or all the basins.
Number: 61 Created: 5/17/2004
1. The notes on the plan for grading and erosion control are
incorrect. Please place the latest set of notes on the plan.
2. The submittal is incomplete
complete submittal is made.
Department: Transfort
Topic: Transportation
Number: 51
No comments from Transfort
Plan will be reviewed when a
Issue Contact: Garold Smith
Created: 5/5/2004
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 42 Created: 1/5/2004
[5/18/041 Same comment applies (see red lines).
[1/5/04] According to the Section 3.2.2 (C.5.a) of the Land Use
Code walkways that link street sidewalks to building entrances
through parking lots or along drive aisles shall be a minimum 6 feet
in width. This is especially important along transit routes and a
planned major transit station for the Mason Transportation Corridor.
Please increase the walkway along the east side of the property to a
minimum of 6 feet. Also is there an opportunity for the walkway to
be located so that both adjacent land uses can utilize the walk? For
example, can the walk be located further to the eastern edge of the
property line along the Phase II section of the parcel?
Number: 43 Created: 1/5/2004
[5/18/041 A bike rack will need to be labeled and identified on the
retail building proposed as Phase II of the project. It will also
need to be located near the building entrances. The bike rack shown
for the Phase I car wash is not required if the facility is
unattended.
[1/5/04] See red lines for the suggested bike rack location. Please
refer to Section 3.2.2 (C.4.a,b,c) for the design of the bike rack.
Also please identify and label on all plan sets for the next
submittal.
Number: 44 1 Created: 1/5/2004
[5/18/041 Same comment applies. An access ramp for the .handicap
stalls is also required.
[1/5/04] Please identify and label the handicap parking stalls on
all plan sets.
Page 6
Number: 9
[5/21/041
Created: 12/30/2003
(12/30/031 water Supply: Commercial No commercial building can
be greater then 300 feet from a fire hydrant. Fire hydrants are
required with a maximum spacing of 600 feet along an approved
roadway. Each hydrant must be capable of delivering 1500 gallons of
water per minute at a residual pressure of 20 psi. 1997 UFC
901.2.2.2
Number: 10
[5/21/041
Created: 12/30/2003
[12/30/031 Hazardous Materials: Corrosive, flammable liquids,
reactive, or toxic materials (As defined in the Uniform Fire Code)
if used, stored or handled on site must have a Hazardous Materials
Impact Analysis (HMIA) completed and supplied to the Planning
Department and the Fire Department (submitted to Ron Gonzales)
FCLUC 3.4.5 (C)
Topic: Transportation
Number: 100 Created: 5/21/2004
[5/21/041 BUILDING AREA:
This proposed building exceeds 5000 square feet for type V
construction and must be fire contained or fire sprinklered. 1997
UBC Table 9B
Department: Police
Topic: General
Issue Contact: Joseph Gerdom
Number: 62 Created: 5/18/2004
[5/18/041 Lighting and Landscape okay for Phase 1 only.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 20 Created: 1/1/2004
[5/17/041
Stormwater is ready for hearing. Additional comments may follow at
final plan review when more information is presented.
Number: 22
[5/17/041 Repeat Comment
Created: 1/1/2004
Please revise datum to 7-93, which is closer.
Topic: Transportation
Number: 59 Created: 5/17/2004
Please revise old rainfall intensity value of 8.9 in/hr. See
drainage report. This value should be less than the value for the
current rainfall criteria. This will slightly increase the
detention requirement. The previous drainage report had the correct
old rainfall intensity.
Page 5
1
Number: 49 Created: 5/4/2004
[5/4/04] A fire lane is shown on the plans, but is shown only as a
'u' and isn't shown to connect to another fire lane or street.
Usually an emergency access easement is required to be dedicated for
fire lanes, and the EAE would connect to a public ROW or another
EAE. Please work with PFA, and if they require an easement, please
show it on all plans and provide a legal, sketch, and deed of
dedication using the City's standard language. Please contact me if
you need a copy of this language.
Number: 50 Created: 5/4/2004
[5/4/04] Please match the titles on the plans; some say Lot 2-B
Park South, but the utility plan says park south commercial plaza
minor subdivision 2nd filing, lot 2-b. In the City's system, it is
Park South Commercial Plaza, 2nd Filing, Lot 2B, Horsetooth Carwash.
Topic: Transportation
Number: 98
[5/21/041 Comment inserted
retail building identified
connecting walkway standard
discuss a couple of options
Created: 5/21/2004
for Tom Reiff: (5/19/041 Currently the
in Phase II is not in compliance with the
A follow-up meeting is requested to
regarding the layout of the building.
Number: 99
[5/21/041 Comment inserted f
crosswalk that leads from the
Auto Zone? Is it intended to
Department: Light & Power
Topic: Transportation
Number: 52
[5/5/04] No Comments
Created: 5/21/2004
or Tom Reiff: [5/19/041 Why is there a
car wash to the trash enclosure for
connect to the Auto Zone parking lot?
Issue Contact: Bruce Vogel
Department: Natural Resources
Topic: General
Number: 78
[5/19/04] [12/29/03] Please
trash collection areas as well
allow for recycling services.
Department: PFA
Chavez '
Topic: General
Number: 8
[5/21/041
Created: 5/5/2004
Issue Contact: Doug Moore
Created: 5/19/2004
consider providing adequate space at
as within the trash enclosure to
Issue Contact: Michael
Created: 12/30/2003
[12/30/031 Address Numerals: Address numerals shall be visible from
the street fronting the property, and posted with a minimum of 6-
inch numerals on a contrasting background. (Bronze numerals on brown
brick are not acceptable). 1997 UFC 901.4.4
Page 4
Also, please work with XCEL/PSCO to address their concerns with the
building placement in relation to their gas line in the utility
easement on Horsetooth. Comment from Jim DeWilde: "PSCO has an
existing 4" PED gas main laying 12' into the existing 15' U.E. PSCO
needs min. 3' clearance from gas main to proposed building wall.
Any relocation of main would be at developer's expense."
[12/30/031 Reading the conceptual review letter sent to the
applicant by Current Planning, then reading conceptual review
comments in the Engineering file, it appears that engineering was
mis-quoted in the letter sent to the applicant. That letter stated
that: "Development of this property will have to dedicate necessary
additional street right-of-way (ROW) and easements behind the ROW
for West Horsetooth Road. There currently is 50' of right-of-way
(south of the centerline of the street) and 57.5' is ultimately
required." Engineering's file comments state that the existing ROW
on Horsetooth is 50' plus 12' for the right turn lane, and 7.5' of
additional ROW is needed, and that the utility easement should be a
total of 15' beyond the new ROW. The additional 7.51 of ROW is
still required, as is the IS' utility easement behind that.
1.8.03 - Following a meeting of the Transportation Coordination
group this morning, it was agreed that the City would be willing to
accept ROW dedication to the back of the existing sidewalk,
approximately 4' as shown on the plans, in lieu of the standard 7.5'
ROW. Please note this as an approved variance on the utility plans.
Variance of the utility easement width would need to meet the
approval of possibly affected utilities. If a narrower utility
easement is requested, please submit an 8 1/2 x 11 sketch of the
area showing the proposed utility easement, and I will route it to
the appropriate utilities for their approval. The utilities are
given 2 weeks to respond to these requests.
Number: 13 Created: 12/30/2003
(4/30/04) Repeat:
[12/30/03] Please show phasing clearly, and match the utility plans
to the site and landscape plan phasing. (Required for Final
Compliance).
Number: 16 Created: 12/30/2003
[4/30/04) Repeat:
[12/30/031 Please see redlined plans and utility plan checklist for
any additional comments.
Number: 48 Created: 4/30/2004
[4/30/043 Building envelopes/outlines are not allowed over utility
easements. Overhangs extending no farther than 2.5' into the
utility easement are permissible. If this is an overhang, please
clearly label it as such.
Page 3
Number: 105• Created: 5/25/2004
[5/25/041 The property line for this development is not clearly
shown and identified on the Site Plan.
Number: 106 Created: 5/25/2004
[5/25/041 There are 2 proposed phases in this development. Where
are the phase lines?
Number: 107 Created: 5/25/2004
(5/25/041 Is the applicant proposing a building envelope for either
or both building(s)?
Number: 108 Created: 5/25/2004
(5/25/041 The information in the DRAWING LEGEND is superfluous on
the Site Plan.
Number: 109 Created: 5/25/2004
[5/25/041 The proposed land uses on this development plan are Minor
vehicle Servicing & Maintenance (car wash) and Retail. This Site
Plan needs to reflect all of the proposed land uses.
Number: 110 Created: 5/25/2004
[5/25/041 One handicapped parking space will be required in Phase
Two of the development.
Number: 111 Created: 5/25/2004 _
[5/25/041 Apparently there is a set of steps on the AutoZone
property, to the west, that end at the west property line of this
development. How is that pedestrian way to be continued into this
site?
Topic: Utility Plans
Number: 101 Created: 5/25/2004
[5/25/041 Len Hilderbrand of Xcel Energy (PSCO) offered the
following comments:
a. PSCO has a 4" gas main that lays 12' south of the south right-
of-way line of West Horsetooth Road.
b. PSCO will need a minimum 3' clearance from the gas main to the
proposed building wall.
C. Any necessary relocation of gas facilities would be at the
developer's/property owner's expense.
Department: Engineering Issue Contact: Katie Moore
Topic: General
Number: 11 Created: 12/30/2003
[4/30/04) Clearly label and dimension the proposed ROW for
Horsetooth and the utility easement behind it on the site and
landscape plans.
Page 2
/
rl
STAFF PROJECT REVIEW
City of Fort Collins
Doberstein Lemburg Commercial, Inc. Date: 05/25/2004
c/o Dan Bernth
702 West Drake Road
Building E, Suite B-102
Fort Collins, CO. 80526
Staff has reviewed your submittal for PARK SOUTH COMMERCIAL PLAZA,
2nd Filing, Lot 2B, HORSETOOTH CARWASH - TYPE I (LUC), and we offer
the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Plans
Number: 102 Created: 5/25/2004
[5/25/041 Rick Lee of the City of Fort Collins Building Department
indicated that the information submitted is very limited. A pre -
submittal meeting should be scheduled with the Building Department
before the construction documents proceed too far. Attached are the
various codes that the Building Department will enforce.
Topic: Landscape Plan
Number: 112 Created: 5/25/2004
[5/25/041 The proposed landscaping needs to, be re-evaluated to
ensure that the required screening for the vehicular use areas and
parking lots is being provided. There is a question as to whether or
not some of the proposed shrubs will provide the minimum 30" height
and 70% screening required in Section 3.2.1(E) (4) (b) of the Land Use
Code.
Number: 113 Created: 5/25/2004
[5/25/041 A 5' wide landscaped setback area is needed along the
east property line of Phase Two of this development. Please see
Section 3.2.2(J) of the Land Use Code. The landscaped setback area
on the Landscape Plan scales to be 3.5' wide.
Topic: Site Plan
Number: 103 Created: 5/25/2004
[5/25/041 Gary Lopez of the Zoning Department indicated that the
Site Plan still needs building dimensions for both buildings and
scaled distances to at least 2 of the nearest property lines.
Number: 104 Created: 5/25/2004
[5/25/041 The Site Plan does not show the full width of the
proposed sidewalk along the east property line for the car wash site
(Phase One). A portion of the width of the walk would be on the
property to the east. Assume there is the need for an easement from
that property owner to construct a portion of the sidewalk on their
property.