HomeMy WebLinkAboutPARK SOUTH COMMERCIAL PLAZA, 2ND FILING, LOT 2B, CARWASH - PDP - 37-94E - CORRESPONDENCE -STEWART$,LSSOCIATES
Consulting Engineers and Surveyors
DEDICATION OF ACCESS AND EMERGENCY ACCESS AND UTILITY
EASEMENT
IN LOT 1 AND LOT2, PARK SOUTH COMMERCIAL PLAZA, THIRD FILING
A 25.00 foot wide access and emergency access and utility easement situate in Lot 1 and
Lot 2, Park South Commercial Plaza, Third Filing, City of Fort Collins, County of
Larimer, State of Colorado which begins at the Northwest corner of said Lot 1 and run
thence S89°42'45"E 329.67 feet to the Northeast comer of said Lot 2; thence
S00°00'00"E 25.00 feet; thence N89°42'45"W 297.80 feet to a point on the East line of
Manhattan Avenue; thence NOV 17' 15"E 25.00 feet along the East line of Manhattan
Avenue to the point of beginning.
James H. Stewart and Associates, Inc.
103 S. Meldrum Street • P.O. Box 429 • Ft. Collins, CO 80522
970/482-9331 • Fax 970/482-9382
STEWARr&ASSOCIATES
Consulting Engineers and Surveyors
VACATION OF ACCESS AND UTILITY EASEMENT
IN LOT 1 AND LOT 2, PARK SOUTH COMMERCIAL PLAZA, THIRD FILING
A 25.00 foot wide access and utility easement situate in Lot 1 and Lot 2, Park South
Commercial Plaza, Third Filing, City of Fort Collins, County of Larimer, State of
Colorado which begins at the Northwest corner of said Lot I and run thence
S89042'45"E 329.67 feet to the Northeast comer of said Lot 2; thence S00°00'00"E
25.00 feet; thence N89°42'45"W 297.80 feet to a point on the East line of Manhattan
Avenue; thence NOW 17' 15"E 25.00 feet along the East line of Manhattan Avenue to the
point of beginning.
James H. Stewart and Associates, Inc.
103 S. Meldrum Street • P.O. Box 429 • Ft. Collins, CO 80522
970/482-9331 • Fax 970/482-9382
WEST HORSET(
100' right —grill
f
North 114 Corner of Section 35-7-69 d'.
(found 3" aluminum cap set in concrete — C.S. No. 20123) ------ North line of the Northeo:J
(basis of d r
t
— — -- S89°42'45 "E 1503. 50'
0
S89042'45''E 562.'i
0--------------------------- ---------
p I 312 84' 2
15' utill yeasement -
II J
t
L d
o LOT TWO
N ; 0 2. 7536 acres +
l� 0
Q l o
0 0 °
o Lr) o I N
b
S 89042'45 f_ 329.67' rh
-------
--------------
30' utility eF
ut lity.; ment
Z ;" Orr MINI STO9,4GE _
r a2e I of I
From: "Tricia Kroetch" <Tricia@NorthStarDesigninc.com-
To: "Rhey Wright' <rheyw@comcast.net>
Sent: Tuesday, January 18.2005 8:35 AM
Subject: Fw: Horsetooth Car WaSh
— Original Message From: Katie Moore
To: Tricia@NorthStarDesignlnc.com_
Sent: Tuesday, January 18, 2005 BM AM
Subject: Re: Horsetooth Car Wash
Tricia.
Yes, I heard from him, and the issue has been resolved.
-Katie
>>> "Tricia Kroetch" <'Tricia North$tarDesignlnc.com> 01/14/05 04:17PM
Katie,
I spoke with Rick Traynor at Xcel Energy yesterday and he said we are
okay with the gas line (no conflicts). He also said he would call you
to indicate this. Has he called you and are we good on that issue??
Have a great weekend.
Tricia
RECEIVED
JAN 21 ?005
CURRENT PLANNING
1/2l/2005
RECEIVED
JAN 21 M5
CURRENT PLANNING
REQUEST FOR A MODIFICATION OF STANDARDS
The Applicant hereby requests a Modification to the Development Standard 3.2.2C5a Walkways.
Specifically we request a modification to the 6' sidewalk width requirement of this standard. In lieu of the 6'
sidewalk we request a 5' sidewalk per item 2.8.2113. The site has a preexisting physical constraint in its east west
dimension. Such dimensional constraint negatively affects the turning radius of vehicles exiting the car wash bays.
The extra 12" will greatly assist in overcoming this tightness, especially with the larger and oversized vehicles
using the facilities. The remainder of the property to the south will provide a 6" wide sidewalk.
Page 1 of 1 \\Carr\CB Documerns\PROJECTS Active\Tidalwave carwash\request for modifica
Architecture
Planning
151 West Mountain Avenue Fort Collins, Colorado 80524 970-482-8125 FAX 970-482-8450
RECEIVED
JAN `?
CURRENT PLANNING
Doberstein Lemburg Gc
1537 Riverside Avenue
Fort Collins, CO 80524
(970) 221-1965 Office
(970)221-1966 Fax
January 18, 2005
Mr. Steve Olt
Project Planner
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
RE: Park South Commercial Plaza, 2Id Filing, Lot 2B ( Horsetooth Car Wash )
Dear Steve:
As you know Steve, we initially planned to connect into the sanitary sewer service that is located
on the adjacent property to the west - the Auto Zone property. This would have required both
an offsite construction easement and an offsite utility easement.
Subsequently, after talking to Jeff Hill we have decided to tie into the sewer line that runs south
of this lot. The access and utility easement is already in place and it also allows us to tap into
the same line when / if we do the south building.
Should you have any questions regarding this matter, please call me.
Thank you for your cooperation.
Sincerely,
D BERSTEIN LEMBURG COMMERCIAL, INC.
41ti 'I' ao�tc
Daniel R. Bernth, CCIM
President
1/21/2005/\\Dlc\dl network\DLC TEXT\LETTERS\OTHER\HT LAND - SEWER.doc
RECEIVED
,JAN 2 9M9
CURRENT PLANNING
1537 Riverside Avenue
Fort Collins, CO 80524
(970) 221-1965 Office
(970)221-1966 Fax
January 18, 2005
Mr. Steve Olt
Project Planner
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
RE: Park South Commercial Plaza, 2Id Filing, Lot 2B ( Horsetooth Car Wash )
Dear Steve:
Per your request, the following is a list of items that needed to be resolved prior to scheduling an
Administrative Hearing for the aforementioned property.
Water Quality — As you can see by the attached Revised Site Plan Tricia and Wes have resolved the
water quality issue primarily by eliminating one parking stall and enlarging the detention pond.
Emergency Access Easement — After discussions with Ron Gonzalez and Gino Campana, Gino has
agreed to vacate his current 25' Access and Utility Easement and dedicate a new Access and
Emergency Access and Utility Easement. I have attached a site plan and Vacation and Dedication
documents for your review. In addition, I will provide a copy of the same to Ron Gonzalez.
Modification — Attached is the Request for Modification of Standards for the sidewalk.
Xcel — Attached is an email resolving the gas line issue.
Sewer Service — Please see attached letter and / or speak with Jeff Hill.
Construction Easement — Obviously there will be no need for a construction easement for sewer as we
intend to go South to the sewer line and not encroach on the Auto Zone property.
Should you have any questions regarding this matter, please call me.
Thank you for your cooperation.
Sincerely,
DOBERSTEIIN LLEMBURG COMMERCIAL,
Da el R. Bernth, CCI
President
1/21/2005/\\Dlc\dl network\DLC TEXT\LETTERS\OTHER\HT LAND - ADMIN HEARING.doc