HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE PUD - PRELIMINARY - 33-94A - CORRESPONDENCE - (3)29. The developer's design team should refer to the Harmony
Corridor Desian Standards and Guidelines. This document
places a great emphasis on connecting the commercial land use
with the residential areas in terms of scale, pedestrian
amenities, central plazas, bicycle facilities, public transit,
etc. While recognizing the need to buffer the truck loading
area, the design of the center should prioritize blending in
with the neighborhood rather than placing barriers along the
perimeter.
30. The three acre parcel at the corner of Wheaton and Monte Carlo
has great potential in softening the commercial aspect of the
center and creating a vital interface with the neighborhood.
The proposed uses contribute to a beneficial mix of land uses
that add variety and services at a smaller scale that will
help make the center a neighborhood destination. These uses
should be designed to face the neighborhood,. not turn its
back.
31. It is suggested that Safeway's design team meet with the
Planning Department prior to submittal to discuss ideas on how
best to comply with the intent of the Harmony Corridor Design
Standards and Guidelines.
32. A neighborhood information meeting will be required prior to
submittal of a Preliminary P.U.D. Please contact the Planning
Department regarding timing and scheduling this meeting.
20. The traffic impact analysis must address trip generation,
existing and projected traffic volumes, level of service, trip
assignment, street system operations, traffic control devices,
neighborhood impact, and mitigation. For further information,
please refer to Chapter 7.14 of the City's Development Manual
and contact Tom Vosburg, Transportation Planner, 221-6608.
21. The improvements identified in the traffic impact analysis
that are located in the public right-of-way must be designed
and shown on a set of Utility Plans prepared by a licensed
professional engineer. Please refer to Chapter 7.1 of the
City's Development Manual for information on this requirement.
22. An eight foot wide detached sidewalk will be required along
Harmony Road. Thiswalk should be designed with subtle
meanderings and not be a straight shot. The City will
reimburse the developer for four feet of this walk. Access
points from this walk should connect to the pad sites and
other pedestrian walks.
23. The Street .Oversizing.Fee for retail and restaurants is
$14,005 per acre. For offices, the fee is $10,004 per acre.
For residential, the fee is $584 per unit. Fees are paid at
the time of building permit issuance. For a full description
of this fee, please refer to Chapter 7.18 of the .City's
Development Manual.
24. After Utility Plans are in final form and approved, a
Development Agreement must be executed between the City and
the Developer. This Agreement obligates the developer for the
construction of the improvements identified in the Utility
Plans. Work on the site cannot begin until the Development
Agreement is recorded. For further information regarding the
Development Agreement, please refer to Chapter 7.8 of the
City's Development Manual and call Kerrie Ashbeck, City
Engineer, 221-6750.
25. All rooftop mechanical equipment must be totally screened from
public view.
26. Lighting must not spill offsite into the residential area.
All fixtures, both pole -mounted and building -mounted, must be
down directional with sharp cut-off luminaries. Pole -mounted
light fixtures on the perimeter should be of lower height to
reduce impacts on the neighborhood. A specifications cut -
sheet will be required at the time of consideration of Final.
27. The trash compactor should be located within an enclosed area
and screened to mitigate visual and noise impacts.
28. Other dumpsters must be screened by an enclosure that matches
the building's exterior. All service areas .or areas of low
visual interest must be totally screened from Harmony Road.
14. The site is located in the Fox Meadows Drainage Basin. The
Storm Drainage Fee in this basin is $6,468 per acre. The
outfall for this site is the detention pond adjacent to the
Golden Meadows Park, east of subject site. You are cautioned
that the existing storm sewer system that routes storm flows
to this outfall suffers from limited capacity. You have the
option of improving this downstream storm sewer system, or
detaining a sufficient volume of storm flows onsite and
releasing at.a controlled rate so as to not impact the system.
15. A Preliminary Drainage Plan is approved for this site. Please
be aware, however, that the conceptual plans appear different
from earlier plans. Therefore, the consulting engineer may be
obligated to make the necessary changes to design for the new
plans. A submittal must include a Drainage Report, Drainage
and Grading Plan, and Erosion Control Plan.
16. It is recommended that a pre -submittal meeting occur with the
developer's consulting engineer and the City's Stormwater
Utility. Submittals must be complete or risk being rejected.
Stormwater Utility cannot review incomplete submittals. For
further information, please refer to Chapter 7.19 of the
City's Development Manual and contact Glen Schlueter,
Stormwater Engineer,.224-6065.
17. A Traffic Impact Analysis must be provided and included in the
submittal documents. Please be aware that there is a high
degree of sensitivity with the surrounding neighborhood
regarding traffic issues. The proximity of Kruse Elementary
School presents a unique condition which may require offsite
mitigation on the part of the developer. This may include,
but not limited to, adding crosswalks, blinking caution
lights, crossing guards, etc. It is strongly recommended that
the developer and traffic consultant take an non-traditional
approach in finding ways to solve neighborhood concerns with
traffic issues.
18. The proposed right-in/right-out on Harmony Road is not in
accordance with the adopted Harmony Road Access Control Plan.
This Plan was mutually adopted by the City of Fort Collins and
Colorado Department of Transportation. As such, this access
point must be processed as a variance through the City with
review by the State. The City acts as the issuing authority
.for the State. The traffic impact analysis should address
this proposed curb cut in detail. For further information,
please refer to Chapter 7.17 of the City's Development Manual.
19. In addition, if the developer desires to upgrade the proposed
signal at Harmony and Wheaton to a full movement intersection,
then a.variance must be processed and approved by both the
City and the State. The traffic study should address the
implications of full movement on signal progression along
Harmony Road.
to serve the site. The water mains should loop together for
best pressure.
5. There is a planned large diameter water transmission line that
is currently being designed. This line is anticipated to be
in Wheaton Drive and then turn east along Harmony Road. This
line is expected to be located in the 80 foot wide buffer area
along Harmony Road. Appropriate easements will have to be
dedicated. Other utilities must be kept a certain distance
away from this line.
6. Restaurants and delis will require a grease trap on the
sanitary sewer line.
7. Water and sewer plant investment fees and raw water
acquisition fees will be assessed and payable at the time of
building permit issuance. For further information regarding
water and sewer issues, please contact Roger Buffington, 221-
6681.
8. The property is located in the residential neighborhood sign
district. signage in this district is considerably more
restrictive than on College Avenue. A copy of the Sign Code
is available at the Zoning Department. Please contact Gary
Lopez, 221-6760 for further information.
9. Any building with more than 5,000 square feet of uncontained
floor area must be equipped with an automatic fire
extinguishing system. Fire sprinkler systems will be reviewed
by the Poudre Fire Authority.
10. Additional fire hydrants may needed to serve the new
buildings. All buildings must be within 400 feet of a
hydrant.
11. The internal parking lot drive aisles must be designed with 20
feet inside and 40 feet outside turning radii. For further
information, please contact Mike Pretz, Poudre Fire Authority,
221-6570.
12. The buildings will be reviewed by the 1991 Uniform Building
Code, adopted with local amendments. This includes the
requirements for handicap parking and accessibility. All
sidewalks used for handicap access must be so designated and
connect to all perimeter sidewalks along public streets. For
further information, please refer to Chapter 9.1 of the City's
Development Manual and contact Sharon Getz, Plans Examiner;
Building Inspection Division, 221-6760.
13. The County Health Department is a signatory on the City's
building permit. A separate submittal is made to this agency.
You are encouraged to contact this agency early in the
process.
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: April 24, 1995
ITEM: Safeway at Golden Meadows Shopping Center
APPLICANT: Ms. Katy Press, Area Real Estate Manager,
Safeway, Inc., 6900 S. Yosemite, Englewood,
CO. 80112 c/o Mr. Dennis Wyatt, Wyatt and
Associates, P.C., 1865 South Pearl Street,
Denver, CO. 80210.
LAND USE DATA:
Request for a 49,000 square foot grocery store, 20,000 square foot
drugstore, 25,000 square feet of support retail, and approximately
14,000 square, feet of pad site development within the 18 acre
Golden Meadows Shopping Center. One of the pad site developments
is expected to be a 6,500 square foot casual dining restaurant.
Possible tenants include Safeway Grocery Store and Long's Drugs.
Other tenants are unknown at this time.
COMMENTS:
1. Electrical power will be supplied by the City of Fort Collins
Light and Power Department. A Commercial One (11C-111) Form
will be required to be completed by an electrical contractor
to determine entrance capacity. Normal development charges
will apply. These charges are described in the handout.
2. There are existing underground electrical vaults along the
perimeter streets. If these vaults have to be relocated due
to development improvements, then the cost is borne by the
developer. Such improvements could include turn lanes and
deceleration lanes.
3. Electrical transformers must not be visible from the public
streets. For servicing, transformers must be within 10 feet
of hard surface on one side. Transformers must be screened by
either a solid enclosure meeting the minimum clearance
specifications or by landscape materials. For safety
purposes, it is suggested that transformers be located as
close to the buildings as possible. For further information,
please contact Doug Martine, 221-6700.
4. There are eight inch diameter water mains in Wheaton, Monte
Carlo, and McMurry. There are eight inch diameter sanitary
sewer. mains Monte Carlo and McMurry. All mains are available
COMMUNITY PLANNING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-6580 (303)221-6750
PLANNING DEPARTMENT
Com. nity Planning and Environment., Services
Current Planning
City of Fort Collins
April 27, 1995
Mr. Dennis Wyatt
Wyatt and Associates, P.C.
1865 S. Pearl Street
Denver, Co 80210
Dear Mr. Wyatt:
For your information, attached is a copy of the Staff's comments
concerning Safeway at Golden Meadows Shopping Center presented
before the Conceptual Review Team on April 24, 1995.
The comments are offered informally by Staff to assist you in
preparing the detailed components of the project application.
Modifications and additions to these comments may be made at the
time of formal review of this project.
If you should have any questions regarding these comments or the
next steps in the review process, please feel free to call me at
221-6750.
Sine,
Ted Shepard, ICP
Senior Planner
TS/gj d
Attachments
cc: Transportation Department
stormwater Department
Project Planner
File