Loading...
HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE PUD - PRELIMINARY - 33-94A - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (5)Mr. Ted Shepard April 1, 1996 Page Four A meeting was held on Thursday March 14, 1996 with the Transportation and Engineering office to .discuss the remaining issues. Al Kopel, neighborhood association representative was in attendance. Refer to comments from Krager Associates included under separate cover. Harmony Road Access. Refer to comments from Krager Associates. Drainage Report: Refer to narrative from Northern Engineering. For purposes of the preliminary plan, an additional turning lane has been provided on Harmony Road, subject to detailed engineering requirements with the final PUD. Site Plan: See comments above. Additional details for intersection of McMiurry and Monte Carlo presented on revised plan, subject to further details with final PUD plan. The 8 foot sidewalk is shown along Harmony Road. No pavers will be provided within the public right-of-way. Painted crosswalks will be shown in right-of-ways. Details for striping to be provided with final PUD plan. Utility Plans: Details to be provided with final PUD plan. These revised plans are submitted for the Planning Commission Hearing scheduled for April 22, 1996. If you have any questions with this submittal, please don't hesitate to call my .office to .discuss the issues. Thanks for your continued .cooperation. Cordially, -VVYATT & ASSOCIATES, P.C. Dennis W. Wyatt, Architect cc: Katy Press Linda Ripley Mike Jones Kathleen Krager Bob Pennock Ivlr. Ted Shepard April 1, 1996 Page Three 27. Details of this requirement under study now with the electrical department and will be addressed with final PUD plan. 28. Plans changed to reflect high pressure sodium as the light source. We typically prepare a detailed point by point computer generated photometric plan for review by staff and the client. This will be presented with the final PUD plan. 29. Refer to comment above (28). 30. Note has been added to the revised plans. 31. Tree grates not required since planting is within larger planting areas. 32. Proposed transit stop noted on plan subject to details with final PUD plan. 33, dote added to cover sheet. Section III - Landscape Plan Comments: 34. See revised site and landscape plan for new planters. 35. See revised landscape plan. 36. See revised landscape plan. 37. See revised landscape plan. 38. See revised site plan, landscape plan and sections. 39. See revised landscape plan. Section IV - Other Comments: 40. See revised preliminary elevation drawings. 41. Height at ridgeline is approximately 34 feet. 42. Spelling corrections on all plans. Additional Engineering Comments: Traffic Study: a' Mr. Ted Shepard April 1, 1996 - Page Two 12. Refer to response from Northern Engineering. No detention planned in this area. 13. Refer to response from Northern Engineering. Oil/water filter separator to be provided with final plan details. 14. Refer to response from Northern Engineering. 15. Refer to response from Northem Engineering. 16. See notes below. 17. Details to be provided with final P.U.D. plan. Section II - Site Plan and Cover Sheet Comments: i8. This requirement seems redundant. A sidewalk on one side is adequate when associated with the additional sidewalks extending north from the bike path into the site at other locations. 19. Prodded on revised plan. 20. Refer to comments from Bob Pennock. These pads are shown for illustrative purposes at this time. Detailed plans will have to be reviewed by city staff prior to final site plan approval for these individual lots. 21. Shown .on revised plans. 22. Additional crosswalks have been shown on the revised plans. Details of materials, colors and textures to be provided with final plan. In general, crosswalks will be flush and constructed with scored colored concrete. 23. Shown on revised plans. 24. Shown on revised plans. Details of enclosures to be provided with final plan. 25. Safeway will utilize an enclosed trash compactor connected directly to the building and will be located within the enclosed dock area as noted on the plan. 26. Safeway service area will be entirely enclosed within the building as noted on the revised plans. WYATT & ASSOCIATES, PC. ® ARCHITECTS and PLANNERS April 1, 1996 Mr. Ted Shepard Senior Planner Community Planning and Environmental Services 281 N. College Ave. Ft. Collins, Colorado 80522 RE-. HARMONY--SAFEWAY MARKETPLACE Dear Ted:' Enclosed herein are revisions to the Preliminary P.U.D. for the above noted project. The revised graphic ezlubits and the following is a narrative response to the items listed in staffs review letter. of February 8, 1996. Section one -Utility -Comments: 1. Refer to Krager Associates response for documentation. 2. ,Same as above. 3, We reviewed this concern with Eric in the Engineering Department and the 24 foot width appears to be acceptable. 4. A mid -block crossing has been noted on the plan. Details will be provided with the final P.U.D. 5. See revised plans which offer two designs (one noted on site plan and one noted on landscape plan). 6. See revised plans noted above. A retaining type "garden" wall similar to the one provided at Laurel and Whedbee has not been provided. It is noted that kids like to climb on walls and this is not an appropriate location for this potential problem. 7. U.S. West easement details will be addressed at final plan. 8. Details to be addressed with final plan and final survey which has been ordered. 9. Details and relocation to be addressed with final P.U.D. plan. 10. Refer to modifications on Preliminary Landscape Plan. 11. Fire sprinkler and other code requirements to be noted on final P.U.D. plan. 1865 so, pearl st., denver, colorado 80210 (303) 698-1717 fax (303) 778-6004