HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE PUD - PRELIMINARY - 33-94A - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (5)Mr. Ted Shepard
April 1, 1996
Page Four
A meeting was held on Thursday March 14, 1996 with the Transportation and Engineering
office to .discuss the remaining issues. Al Kopel, neighborhood association representative
was in attendance. Refer to comments from Krager Associates included under separate
cover.
Harmony Road Access.
Refer to comments from Krager Associates.
Drainage Report:
Refer to narrative from Northern Engineering. For purposes of the preliminary plan, an
additional turning lane has been provided on Harmony Road, subject to detailed
engineering requirements with the final PUD.
Site Plan:
See comments above. Additional details for intersection of McMiurry and Monte Carlo
presented on revised plan, subject to further details with final PUD plan.
The 8 foot sidewalk is shown along Harmony Road.
No pavers will be provided within the public right-of-way. Painted crosswalks will be
shown in right-of-ways.
Details for striping to be provided with final PUD plan.
Utility Plans:
Details to be provided with final PUD plan.
These revised plans are submitted for the Planning Commission Hearing scheduled for
April 22, 1996. If you have any questions with this submittal, please don't hesitate to call
my .office to .discuss the issues. Thanks for your continued .cooperation.
Cordially,
-VVYATT & ASSOCIATES, P.C.
Dennis W. Wyatt, Architect
cc: Katy Press
Linda Ripley
Mike Jones
Kathleen Krager
Bob Pennock
Ivlr. Ted Shepard
April 1, 1996
Page Three
27. Details of this requirement under study now with the electrical department and will
be addressed with final PUD plan.
28. Plans changed to reflect high pressure sodium as the light source. We typically
prepare a detailed point by point computer generated photometric plan for review
by staff and the client. This will be presented with the final PUD plan.
29. Refer to comment above (28).
30. Note has been added to the revised plans.
31. Tree grates not required since planting is within larger planting areas.
32. Proposed transit stop noted on plan subject to details with final PUD plan.
33, dote added to cover sheet.
Section III - Landscape Plan Comments:
34. See revised site and landscape plan for new planters.
35. See revised landscape plan.
36. See revised landscape plan.
37. See revised landscape plan.
38. See revised site plan, landscape plan and sections.
39. See revised landscape plan.
Section IV - Other Comments:
40. See revised preliminary elevation drawings.
41. Height at ridgeline is approximately 34 feet.
42. Spelling corrections on all plans.
Additional Engineering Comments:
Traffic Study:
a'
Mr. Ted Shepard
April 1, 1996 -
Page Two
12. Refer to response from Northern Engineering. No detention planned in this area.
13. Refer to response from Northern Engineering. Oil/water filter separator to be
provided with final plan details.
14. Refer to response from Northern Engineering.
15. Refer to response from Northem Engineering.
16. See notes below.
17. Details to be provided with final P.U.D. plan.
Section II - Site Plan and Cover Sheet Comments:
i8. This requirement seems redundant. A sidewalk on one side is adequate when
associated with the additional sidewalks extending north from the bike path into the
site at other locations.
19. Prodded on revised plan.
20. Refer to comments from Bob Pennock. These pads are shown for illustrative
purposes at this time. Detailed plans will have to be reviewed by city staff prior to
final site plan approval for these individual lots.
21. Shown .on revised plans.
22. Additional crosswalks have been shown on the revised plans. Details of materials,
colors and textures to be provided with final plan. In general, crosswalks will be
flush and constructed with scored colored concrete.
23. Shown on revised plans.
24. Shown on revised plans. Details of enclosures to be provided with final plan.
25. Safeway will utilize an enclosed trash compactor connected directly to the building
and will be located within the enclosed dock area as noted on the plan.
26. Safeway service area will be entirely enclosed within the building as noted on the
revised plans.
WYATT & ASSOCIATES, PC. ®
ARCHITECTS and PLANNERS
April 1, 1996
Mr. Ted Shepard
Senior Planner
Community Planning and Environmental Services
281 N. College Ave.
Ft. Collins, Colorado 80522
RE-. HARMONY--SAFEWAY MARKETPLACE
Dear Ted:'
Enclosed herein are revisions to the Preliminary P.U.D. for the above noted project. The
revised graphic ezlubits and the following is a narrative response to the items listed in staffs
review letter. of February 8, 1996.
Section one -Utility -Comments:
1. Refer to Krager Associates response for documentation.
2. ,Same as above.
3, We reviewed this concern with Eric in the Engineering Department and the 24 foot
width appears to be acceptable.
4. A mid -block crossing has been noted on the plan. Details will be provided with the
final P.U.D.
5. See revised plans which offer two designs (one noted on site plan and one noted on
landscape plan).
6. See revised plans noted above. A retaining type "garden" wall similar to the one
provided at Laurel and Whedbee has not been provided. It is noted that kids like to
climb on walls and this is not an appropriate location for this potential problem.
7. U.S. West easement details will be addressed at final plan.
8. Details to be addressed with final plan and final survey which has been ordered.
9. Details and relocation to be addressed with final P.U.D. plan.
10. Refer to modifications on Preliminary Landscape Plan.
11. Fire sprinkler and other code requirements to be noted on final P.U.D. plan.