HomeMy WebLinkAboutPARK SOUTH COMMERCIAL PLAZA, LOTS 3A THRU 3D - PDP - 37-94C - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSLand Images, inc.
Response to PD Staff Comments, round 2,for Park South Commercial Plaza, Lots 3A — 3 D.
2
The water and sewer services are shown on the site and landscape plans.
Zoning Department
➢ Topo lines will be removed for mylars. The proposed topo will be shown on the plans as
requested by current planning till mylars.
➢ The building height has been shown to reflect the office building height.
➢ General note 7 has been updated.
➢ Wall Light locations will be removed from the landscape plan.
➢ Pole lights have been scaled to twice the actual size for clarity.
➢ Proposed uses have been added to the site plan.
Thank You,
Land Images, inc.
Michael Chalona
T-
CANT? IMAGES tNe
Landscape Architecture — Site Planning - Photography
408 Whedbee Street
Fort Collins, CO. 80524
970.472.8954
April 18, 2001
Troy Jones
Fort Collins Planning Department
281 North College Avenue
Fort Collins, Colorado 80521
Ref.: Response to PDP Comments for Park South Commercial Plaza, Lots 3A — 3D
Dear: Troy,
We have reviewed the Staff comments from the PDP Review round 2 and have summarized our
changes below.
Current Planning
➢ We have received the proposed topo from the engineer and are now showing it.
➢ We will renumber the set so that the context plan stands alone.
➢ We have changed the lighting note to reflect High Pressure Sodium lamps.
➢ We have enlarged the symbol to twice its actual size.
➢ The fence gates along Manhattan will not be opaque. They will be constructed of a solid
material to either match the fence or blend with the building materials. The interior of the site will
not be viewable from the street through the gates.
We have provided a chart on both the elevations and site plan showing the relationship of
building width and building height. All roofs will have a consistent slope of 3:1. This ensures that
the ridgelines will step with the building and vary the height. Building eight will have the exact
wall treatments as the perimeter buildings depicted in the elevations. A base of brick, with an
EFIS finish above. The roof will be a metal seam roof. Building eight will have an additional
material below the brick where the retaining wall may be visible when the retention pond is at a
low water state. The retaining wall may be partially exposed at this time and be of concrete. The
site plan shows the building widths with the corresponding chart showing the building height. The
steps in the building are also typically dimensioned on the site plan. They are within the 3:1 width
to height ratio. The corners where the building steps will have a 1' dark beige band with the field
being a light beige. In the center of each approximately 30' section of building, a 2' dark beige
band will be located in the center of the wall as depicted on the typical perimeter elevations.
We are showing the lintels and sills as dark bands above and below the window sets.
Engineering
Please refer to Stewart Engineering's plans.
We have reviewed the emergency turning radii with Poudre Fire Authority and they are
satisfied with the radii that are shown.
Water! Wastewater
The electric and gas utilities are shown on the plans.