HomeMy WebLinkAboutPARK SOUTH COMMERCIAL PLAZA - MINOR SUBDIVISION ..... SECOND CONCEPTUAL REVIEW - 37-94 - CORRESPONDENCE -N
15. Ditch Company approval will be required prior to final
approval of the utility plans and plat. You should begin to
work with the New Mercer Canal Company as soon as possible.
The Company is concerned about water quality and access. They
typically do not allow you to discharge stormwater run-off
into the canal. There is an existing easement to take the
water to the south, to a regional detention pond in the South
Glen PUD.
16. A traffic study is required and should be submitted with the
engineering utility plan submittal. The traffic study should
focus on trip generation and distribution, access points on
Horsetooth and Manhattan, and internal circulation for the
entire site including the future parcels. Please contact Tom
Vosburg at the Transportation Department (221-6608) prior to
beginning the traffic study to discuss the focus of the study.
17. Street oversizing fees are $14,005 per acre. Engineering
submittal requirements are outlined in the Development Manual.
18. Landscaping along Horsetooth Road will not be maintained by
the City. The City does maintain the trees on arterial
streets, as far as pruning,etc. but watering and general
maintenance of the landscape strip is the owner's
responsibility.
19. Planning would like to see how the undeveloped parcels will
fit into this development scheme. Shared access onto
Horsetooth may be required and may be necessary for internal
circulation to work. Planning will review the landscape plan
and has concerns related to architectural elevations, amount
and type of lighting (both parking lot and building) proposed,
and provision of safe and efficient bike/pedestrian
connections to the neighborhoods and between this parcel and
the undeveloped parcels. Staff highly recommends high
pressure sodium bulbs in a sharp cut-off fixture on low poles.
Foundation plantings, including upright evergreen trees and
shrubs, are required to soften the building elevations.
Street trees. are required along Horsetooth. .Street trees
-along the access drive off of Manhattan will enhance the
property as well.
20. See. attached "Administrative Guidelines" for site/landscape
plans for commercial uses.
21. Please contact Roger Buffington, at the City's Water and
Wastewater Utility (221-6681) concerning a repay that is due
on an existing 24" water line in Horsetooth Road.
I
required to be in landscaped islands, and a 6' solid fence is
required along the property line abutting the residential
zoning district to the south and west.
6. The landscape plan must be submitted to. the Planning
Department and approved by the Planning Director.
7. Sidewalks and pedestrian/bike access should be looked at
closely in development of this site. Provisions for safe,
lighted, weather protected bicycle parking and enhanced
pedestrian/bike connections and walkways will. greatly enhance
the opportunity for people to visit the theater via foot and
bike, especially during summer and fall months. There are a
number of residential units within a one mile radius of this
site and the potential is great. for alternative modes of
travel.
8. Please contact Sharon Getz at the Building Department for
information on local amendments to the current building code.
A fire sprinkler system is required for this type of building.
9. You will be required to submit plans and designs for the
concession area to the County Health Department.
10. Three phase power requires an engineers stamp on the
electrical design for the building.
11. Submit building plans to the Fire Authority for their review.
There must be a fire hydrant within 400' of the building.
Fire access requirements must be met: It is not a requirement
to have drive access around the entire building, as long as
fire access can be met. Fire sprinkler systems allow some
flexibility. There should be access on three sides at a
minimum. Please consult with Mike Pretz at the Fire
Authority for more information.
12. "No -Parking" lanes, or "fire lanes" are required along the
curbs adjacent to the building.
13. The property is located in the McClellands-Mail Creek Drainage
Basin. Stormwater development fees in this basin are $3717.00
per developed acre, subject to the coefficient of run-off for
the site and the amount of on -site detention provided. You
may not have to provide on -site detention, but it may be
required, depending on development in the. area. Please
contact Glen Schlueter or Basil Hamdan at the Stormwater
Utility (221-6589) for more information about development and
existing drainage plans in the area.
14. As part of your submittal, a drainage report and drainage and
grading plans, "with an erosion control plan for the
construction phase, are required. These must be prepared by
an engineer licensed in the State of Colorado.
>1
v
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: May 2, 1994
ITEM: Multi -screen theater
APPLICANT: Jay Anthony -
Anthony Properties
12770 Coit Road, Suite 1170
Dallas, Texas 75251
LAND USE DATA: A proposal for a 36,500 sf ten-plex, multi -screen
theater on 7 acres, located at the southeast corner of Horsetooth
Road and Manhattan Avenue. The theaters would seat a total of
1,700 people. The property is zoned HB, Highway Business, and a
movie theater complex is a use -by -right in this zone.
COMMENTS:
1. Three phase power is available along both Mason and Horsetooth
streets. Normal Light and Power development charges apply.
Coordinate a transformer location with Light and Power. The
transformer will have to be screened from public streets, with
landscaping or an enclosure. A c-1, commercial form, to size
the transformer and panel, needs to be filled out at the'Light
and Power Utility. Doug Martine is your contact at Light.and
Power.
2. Water is available in Manhattan (12") and the north side of
Horsetooth (24"). Either main can be extended to serve this
property. Looping the main may work. You can loop to a 6"
main coming out of the multi -family project to the south.
3. There is a sanitary sewer traversing the site. Maintain a 301
wide easement for this main. Contact Roger Buffington at the
Water and Wastewater Utility for further information.
4. The property is. located in the HB, Highway Business, Zoning
District. The District allows this use, as a "use -by -right",
but the Code requires that the lot be platted. Please contact
Peter Barnes or Dan Coldiron at the Building Department for
further information.
5. The project is required to meet the Parking Lot Development
Guide and the Zoning Code requirements for the HB Zone. A 15'
landscape buffer is required along Horsetooth, 5' buffer
required for adjacent property lines, 6% of the parking lot is
COMMUNITY PLANNING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS. COLORADO90522-0580 (303)221-6750
PLANNING DEPARTMENT
Commt y Planning and Environmental rvices
Planning Department
City of Fort Collins
June 14, 1994
Jay Anthony
Anthony Properties
12770 Coit Road, Suite 1170
Dallas, TX 75251
Dear Mr. Anthony:
For your information, attached are -copies of the revised Staff
comments concerning JFuulti=sdieen Theater,%which was presented
before the Conceptual 'Review -Team --on May 2, 1994.
Please note the addition of note #21, concerning a payback for an
existing water line.
The comments are offered informally by Staff to assist you in
preparing the detailed components of the project application.
Modifications and additions to these comments may be made at the
time of formal review of this project.
If you should have any questions regarding these comments or the
next steps in the review process, please feel free to call me at
221-6750.
Sincerely,
<�
Kirsten Whetstone, AICP
Project Planner
Attachment
xc: Loren.Dilsaver, 1 3 Front Nine Dr.
Project Planner,
File
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (303) 221-6750