Loading...
HomeMy WebLinkAboutHARMONY NEIGHBORHOOD CENTRE P.U.D. - PRELIMINARY - 33-94 - CORRESPONDENCE - RESPONSE TO APPLICANTof providing an effective land use transition from the adjacent residential neighborhood. (+) The scale of a neighborhood service center should be compatible with its immediate and surrounding neighborhood. The placement of secondary uses should create an effective land use transition between the more intensive retail uses in the neighborhood service center and adjacent residential neighborhoods. (o) • No retail establishment occupying more than twenty-five thousand (25,000) square feet of gross floor area shall be permitted, except a supermarket shall be permitted which does not exceed 49,000 square feet of gross floor area. (+) Character: • Neighborhood streets, or sidewalks and bike paths shall lead into and throush the neighborhood service center, so that people who live or work nearby can conveniently use the neighborhood service center. The neighborhood service center shall contain a transit stop with convenient and comfortable access to the uses in the neighborhood service center. (+) The appearance and function of the neighborhood service center shall be effectively integrated with the surrounding neighborhoods, not segregated from them. (+) A neighborhood service center should look and function as a "social and identity" center for the neighborhood. Its buildings should create pleasant and readily identifiable outdoor spaces, such as a plaza and/or major walkway, where people can meet, rest, or wait. (o) Careful design and placement of buildings and uses in Neighborhood Service Center can create an effective transition from the rest of the neighborhood. The negative effects of large buildings, noise, traffic, and exhaust should be contained within the Neighborhood Service Center. (o) 11 neighborhoods. Typically, a neighborhood service center will contain a grocery store or supermarket. Permitted Uses: • The principal uses shall be limited to grocery stores, supermarkets, personal services, business services, gasoline service stations, drug stores, standard or fast food restaurants, liquor and wine sales, clothing and accessory shops, equipment rental (not including outdoor storage), hardware stores, video stores, and uses of similar character as determined by the Planning and Zoning Board. Secondary uses shall be limited to professional offices, banks and financial institutions, multi -family dwellings, small animal veterinary clinics, libraries, youth centers, child care centers, health services, and uses of similar character as determined by the Planning and Zoning Board. (+) The hours of operation of a neighborhood shopping center shall be between 5:00 a.m. and 12:00 a.m. Extended hours may be permitted by the Planning and Zoning Board if evidence is submitted by the applicant to demonstrate that the extended hours will not create an unreasonable disruption of, or intrusion upon, the adjacent residential neighborhood due to exterior lighting, noise and automobile traffic. (+). Scale: A neighborhood service center shall be situated on seven (7) to twenty (20) acres. (+) Generally, a neighborhood service center should occur on 10 - 15 acres. A center may be larger than 15 acres if necessary to allow for the siting of secondary uses which would help to create an effective transition from the adjacent residential neighborhood. (o) • A neighborhood service center shall contain at least six (6) independent business establishments with separate public entrances. (+) • A neighborhood service center continues the City's tradition of having small neighborhood shops supplementing a grocery store or supermarket. One building offering several different services or goods is not considered a neighborhood service center. (o) • A neighborhood service center shall contain 50,600 to 120,000 square feet of gross floor area. A neighborhood service center may contain an additional 10,000 square feet of gross floor area of secondary uses (for a total of not more than 130,000 square feet of gross floor area) if necessary for the purpose 10 Locate a broader range of land uses in the areas of the Harmony corridor known as Mixed - Use Activity Centers as shown on the Land Use Map. The Mixed -Use Activity Center provides, in addition to the uses listed in the Basic Industrial and Non -Retail Employment Activity Center, a variety of retail and commercial uses in shopping centers. If single family housing is provided, at least a generally equivalent number of multi -family dwelling units must also be provided. "Multi -family" shall mean attached single family, 2-family or multi -family dwellings. All housing must be integrated with and function with an office (or business) park and/or shopping center. Neighborhood service centers, community shopping centers and regional shopping centers shall be limited to those locations shown on the Land Use Map. (+) The Plan provides for a range of retail, non -retail and residential uses to occur in the Mixed -Use Activity Centers including shopping centers which satisfy the consumer demands of residents and employees who live and work in adjacent and surrounding neighborhoods as well as from the community or region. All retail and commercial land uses, except those permitted as secondary uses in the Basic Industrial and Non -Retail Employment Activity Center, shall be located in shopping centers. All shopping centers except neighborhood convenience shopping centers shall be limited to locations shown on the Land Use Map. Neighborhood convenience shopping centers shall also be permitted in the Basic Industrial and Non -Retail Employment Activity Center. The general definition, scale, use and character of neighborhood service centers, community shopping centers and regional shopping centers shall be as described in Appendix B. (+) Coordinated planning of a "shopping center" rather than isolated retail uses is the most effective means of avoiding "strip" commercial development. Section 10. That the Harmony Corridor Standards and Guidelines document shall be, and the same hereby is, amended by the addition of a new Appendix "B" to be entitled "Standards and Guidelines for Shopping Center Definitions" to read as .follows: The following standards and guidelines are intended to be used in the definition of proposed shopping centers and shall substitute for and otherwise replace and supersede any conflicting definitions contained in the City Code. These definitions apply only to shopping centers located in the Harmony corridor. HARMONY CORRIDOR NEIGHBORHOOD SERVICE CENTER General Definition: A shopping center located in a complex which is planned and developed as a unit, and located within and intended to primarily serve the consumer demands of residents and employees who live and work in adjacent and surrounding 4 Mr. James Sullivan February 27, 1995 Page 8 As always, please call our office to set up a meeting to discuss any of the issues raised by Staff. Sincerely: 7 Ted Shepard Senior Planner Encl. Mr. James Sullivan February 27, 1995 Page 7 25. The shopping center should feature a focal point such as a clock tower, fountain, art, sculpture, central plaza, etc. that unifies the center and creates a sense of place. Similarly, spaces should be reserved for street vendors, sidewalk sales, seasonal activities, and booths for charitable organizations. 26. The shopping center should feature uniform design in that benches, light fixtures, trash containers, bicycle racks, newspaper stands, kiosks, directional signage, etc. should all match or complement each other in terms of color, material, graphics, etc. This could be done by notation at the Preliminary stage. This concludes Staff comments at this time. In summary, Staff is concerned about the Preliminary P.U.D. submittal in that the minimum requirements of the Stormwater Utility have not met. Also, the size of the anchor tenant and the proposed hours of operation do not comply with the Amended Harmony Corridor Plan. The issues of mitigating the size, bulk, mass, and scale of the commercial center due to the proximity of the residential neighborhood remain critical areas of concern. Finally, Staff is concerned that there is no professional land development consultant to coordinate resolution of issues and to facilitate further planning efforts. It is the Planning Department's understanding that your attorney and the City Attorney's office have agreed that the City should not to continue processing this application until resolution of the existing litigation. It would be helpful if you could confirm that understanding in writing, so that we can avoid expending additional Staff resources in continuing to process this application at the present time. . When court action has been resolved, if it is your intention to pursue the existing application, then it is suggested that representatives of Sullivan Hayes Brokerage meet with the City to resolve logistical issues with the submittal. The Planning Department policy is to not process land development requests that do not meet minimum submittal requirements. The lack of Storm Drainage documentation is the key missing ingredient in taking this P.U.D. forward to the Planning and Zoning Board. However, as mentioned above, even if the Storm Drainage submittal requirements were met, the size of the proposed shopping center and the King Soopers Grocery Store would result in a recommendation of denial under the Amended Harmony Corridor Plan. Therefore, if these criteria are determined by the court to be applicable to your proposal, you may want to consider submitting a revised proposal. Mr. James Sullivan February 27, 1995 Page 6 20. The site plan should indicate the location of the trash dumpster, trash compactor, palette rack storage, and other areas of. low visual interest. It is suggested that these. elements be placed in areas where visual and acoustic buffering can be accomplished to minimize impact on surrounding residential, office and school uses. 21. The Preliminary Landscape Plan should indicate that foundation shrubs will be featured along store entrances as well as side and rear walls. Exterior walls must be mitigated by shrub beds and/or other suitable landscape materials. 22. Staff remains concerned about the mass, bulk, and scale of the commercial center, particularly with the proximity to existing residential uses. Under All Development Criterion A-2.7, the L.D.G.S. states: "When land uses with significantly different visual character are proposed adjacent to each other, every effort should be made to create architectural compatibility through careful consideration of scale, form, materials, and colors." Building A is a large structure. It bears the burden of mitigating its impact on the neighborhood. The north side facing Monte Carlo is 340 feet long, not counting Buildings B and C. This mass and scale could overpower the residential area unless reduced in size or further broken up with architectural elements of a residential character. In its present form, it is Staff's belief that Building A does not satisfy All Development Criterion A-2.7. 23. There is no architectural information for pad site development. Pad sites should develop in a cohesive unified style that complements the design theme established by the anchor tenant. Staff recommends that a series of "notes" on the Preliminary P.U.D. be added to the architectural sheet that describes the intent of architectural compatibility for the pad sites. 24. The shopping center should feature a strong sense of entry for pedestrians, bicyclists, and transit users. As mentioned, public spaces for providing these amenities should be featured prominently. Pavers should be used for crosswalks to differentiate pedestrian areas from auto areas. Walking, biking, or riding a bus should be encouraged, not a challenge. Mr. James Sullivan February 27, 1995 Page 5 As mentioned at conceptual review, Transfort, the City's bus service, should be consulted so transit service to the site can be accommodated. A transit stop should be designed, space should be reserved for a shelter, and a sidewalk should connect the transit stop to the pedestrian walk system for the center. At minimum, a sidewalk, eight feet in width, should be provided from Harmony Road to the front door of the grocery store, not just the pad sites.. Such walk should be landscaped and properly. illuminated for safety. (one large retailer in Fort Collins uses such a sidewalk as an amenity by placing picnic tables in the landscaped area for employees.) E. "The appearance and function of the neighborhood service center shall be effectively integrated with the surrounding neighborhoods, not segregated from them." The Preliminary P.U.D. indicates a dual solution to the interface to the residential area to the north: sidewalk connections and berming/screening to shield the loading docks. While the integrating elements. on the west end of the north edge of the project are workable, the sidewalk connections from Monte Carlo to Building D and E appear to be an afterthought. This connection should lead to a viable, inviting, well-defined public space, not through a loading area. This connection is an important element in satisfying the criterion of integration and should be strengthened by adding pedestrian -friendly amenities. 18. The P.U.D. lacks the provision of public spaces. As evidenced by the usage at other neighborhood centers, customers will often purchase ready -to -eat items (coffee, deli sandwiches, etc.) and seek an attractive location onsite to enjoy a meal, drink or snack. The site plan should provide more courtyards, patios, benches, or otherwise public spaces, with the. appropriate amenities (lighting, shading, trash containers, etc.) to provide this service. Such features will attract pedestrians and minimize the auto -centered design of the center. 19. The site plan should indicate the location of bicycle racks. Racks should be permanently anchored to concrete and not interfere with pedestrian walkways. Racks should also be of uniform design throughout the center and placed under protective coverings wherever possible. Racks should also be placed..at employee entrances. Mr. James Sullivan February 27, 1995 Page 4 following comments apply to the Harmony Neighborhood Center Preliminary P.U.D.: A. "The hours of operation of a neighborhood service center shall be between 5:00 a.m. and 12:00 a.m. Extended hours may be permitted by the Planning and Zoning Board if evidence is submitted by the applicant to demonstrate that the extended hours will not create an unreasonable disruption of, or intrusion upon, the adjacent residential neighborhood due to exterior lighting, noise, and automobile traffic." Information presented at the conceptual review meeting and the neighborhood information meeting indicated that the proposed anchor tenant, King Soopers Grocery Store, would be open on a 24-hour basis. This being the case, the Preliminary P.U.D. should include additional evidence to evaluate the impacts on the adjacent residential neighborhood. B. "A neighborhood service center shall contain 50,000 to 120,000 square feet of gross floor area. A neighborhood service center may contain an additional 10,000 square feet of gross floor area of secondary uses (for a total of not more than 130,000 square feet of gross floor area) if necessary for the purpose of providing an effective land use transition from the adjacent residential neighborhood." The Preliminary P.U.D. indicates 154,342 square feet as the total gross. This exceeds the parameters of the Amended Harmony Corridor Plan. C. "No retail establishment occupying more than 25,000 square feet of gross floor area shall be permitted except a supermarket shall be permitted which does not exceed 49,000 square feet of gross floor area." The Preliminary P.U.D. indicates that the King Soopers Grocery Store would total 66,692 gross square feet which exceeds the parameters of the Amended Harmony Corridor Plan. D. "Neighborhood streets, or sidewalks and bike paths shall lead into and through the neighborhood. service center, so that people who live and work nearby can conveniently use the neighborhood service center. The center shall contain a transit stop with convenient and comfortable. access to the uses in the center." Mr. James Sullivan February 27, 1995 Page 3 City's Stormwater Utility. It is recommended that the consulting engineer meet with representatives of the Stormwater Utility to determine the scope of work necessary to meet the submittal requirements. It has been Planning Department policy that a Preliminary P.U.D. will not be scheduled for consideration by the Planning and Zoning Board until submittal requirements are met. 12. A current Soils Report is needed. The Report submitted is 14 years old and is considered obsolete. 13. Since the site is adjacent to Colorado State Highway 68, a state highway access permit must be obtained. The City's Engineering Department will process this application on behalf of the applicant based on receiving the necessary application and supporting documentation. Please contact Kerrie Ashbeck, 221-6750, for further details. 14. The Site Plan and Site Access Study indicate the addition of a right-in/right-out access along Harmony Road as well as the change of an existing limited access at Wheaton Drive to a full movement access with a traffic signal. Both of these proposals are changes from the approved Harmony Road Access Control Plan. The State of Colorado Department of Transportation is uncertain that such changes can be supported based upon the information provided in the Site Access Study. It is recommended that discussions take place with the applicant, City Staff, and CDOT regarding the proposed recommendations and the need for further documentation. 15. Traffic on Monte Carlo is a primary concern. It is suggested that the traffic consultant meet with Staff to discuss traffic calming techniques to mitigate any potential increase in traffic volumes on Monte Carlo. 16. The City Forester recommends that the Red Oak not be used since it is not well adapted to local soil conditions. Similarly, the Newport Plum should not be used since, in our climate, the survival rate is less than 50%. Part Two: 17. The site is located on a parcel designated as "Neighborhood Service Center" by the Amended Harmony Corridor Plan as adopted by City Council and effective on January 13, 1995. The Harmony Corridor Plan defines such a center, addresses permitted uses,. and describes the scale and character of a Neighborhood Service Center.. (See attached excerpts from the Plan.) Based on the Amended Harmony Corridor Plan, the. Mr. James Sullivan February 27, 1995 Page 2 meanders outside the typical right-of-way width, an access easement should be indicated on the plat to allow public use. 4. The City of Fort Collins Light and Power Utility cautions that the relocation of an underground electrical vault on Wheaton Drive at the entrance to the parking lot will be at the developer's expense. Please contact Light and Power Distribution Engineering (221-6700) for an estimate. 5. The Preliminary landscape plan indicates that some perimeter street trees may not be 40 feet from existing streetlights as required. (See enclosed map.) Adjustments should be made. Keep in mind that ornamental trees may be placed within 20 feet of streetlights. 6. The parking area along Wheaton,north of the entry drive, should be buffered with any combination of greater setback, increased plant material, or berms. As shown, the parking lot facing the street without buffering is unacceptable. 7. The berms along Harmony Road should continue so that all parking spaces that face south and Building G is buffered. 8. At the Preliminary stage, the P.U.D. should note that electrical transformers, utility meters, and other appurtenant structures are to be screened with landscape materials or enclosed within decorative fencing meeting the clearance specifications of the utility provider. 9. As mentioned at conceptual review (November 1, 1993), the City's Water and Wastewater Utility is scheduling the installation of a 36 inch diameter water transmission line.on the north side of Harmony Road in 1996. This line will likely be placed within the 80 foot buffer area along Harmony Road and should be located within an exclusive easement no less than 15 feet wide. No large trees should be planted within this easement. 10. In general, trees should be kept at least 10 feet and shrubs should be kept four feet from water mains and sanitary sewer lines. 11. The Drainage Report, Drainage and Grading Plan, and Erosion Control Plan do not satisfy the minimum submittal requirements for a Preliminary P.U.D. The letter from TST Consulting Engineers references the "Golden Meadows Fifth Filing Storm Drainage .Report". dated December 22, 1980 as meeting the Stormwater Utility's submittal requirements. This Report is inadequate and outdated and predates the formation of the February 27, 1995 Mr. James M. Sullivan Mr. John Lyda Sullivan Hayes Brokerage 1001 Lincoln Street Denver, CO 80203 Dear Mr. Sullivan: As you are aware, the six-month moratorium on processing land development requests for commercial and retail development within the Harmony Corridor (Ordinance No. 103, 1994) expired on January 13, 1995. Consequently, Staff has revived the plan review for the request for Harmony Neighborhood Center Preliminary P.U.D. located on Tract "B" Golden Meadows Fifth Filing. This round of preliminary comments are being sent directly to your office since Staff, at this time, is unaware of any professional land development consultant that is working on this project. The following comments are offered in two parts. Part one consists of comments from City Staff and outside utility providers. Part two addresses compliance with the Amended Harmony Corridor Plan and neighborhood compatibility. Part One: 1. The Public Service Company will require a nine foot wide (minimum) utility easement along the south right-of-way line of Monte Carlo Drive. In addition, an eight foot wide (minimum) utility easement must be preserved along the east right-of-way line of Wheaton Drive. Street trees should be kept at least four feet away from underground gas lines. 2. U.S. West cautions that review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. The owner is responsible for provision of all conduit, ditch, and street crossings for telephone facilities within the project, and the owner shall provide terminal room space and power for the main terminal at one building on each separately owned property. The owner's vendor provides all facilities beyond the main terminal. 3. It appears that the sidewalk along McMurry Avenue may conflict with existing telephone pedestals. U.S. West would relocate its facilities at the developer's expense. However, due to the high cost, it is recommended that the sidewalk plan be revised to curve around these pedestals. If the sidewalk 281 North College Avenue - P.O. Box 580 Fort Collins, CO 80522-0380 - (303) 221-6780 FAX (303) 221-6378 TDD (303) 224-6002