HomeMy WebLinkAboutLIND PROPERTY, 2ND FILING - FDP - 39-94E - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (4)The utility plans text is incomprehensible in several areas notably the grading, overall utility
and erosion control plans are unreadable. Please clarify. Use appropriate line text weights
as shown in legend and eliminate extraneous information whenever possible.
Department: Transportation Planning Issue Contact: David Averill
Topic: Traffic
Number: 68 Created: 1 /20/2005
[1/20/05] Please add at least one standard bicycle lane stencil marking to each side of the
street on Brightwater. Halfway between the roundabout and Thoreau Dr. would be great.
Thanks.
Topic: Transportation
Number: 108 Created: 2/1/2005
[2/1/05] It seems like it would make more sense for the walkway/path between Tracts A and
M to align with the ramp provided further northeast from the round about. The configuration
I'm suggesting would basically show the walk in aligment with the line between these two
tracts. See redlines for clarification (CS508).
Number: 109 Created: 2/1/2005
[2/1/05] The pedestrian crossing at Seafarer Ln and Clarion Ln needs to be revised. The
current submittal shows a single access ramp which directs ped.'s diagonally across this
"intersection". This design is not desirable in that the crossing distance is increased and it
may create a sight distance issue (on Seafarer) since the roadway is curved. Please
provide crossings and ramps that direct pedestrians across Seafarer and Clarion
individually. See redlines for clarification (CS515). Thanks.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely
Ted Shepard
Chief Planner
Page 8
A section should be included in the report mentioning that erosion control final calculations
shall be provided with a final submittal. It should also describe in general what BMP
measures are envisioned at this time.
Topic: Grading
Number: 110 Created: 2/1/2005
[2/1/05]
The proposed swale behind Lots 1 through 6 Block 8 should be kept off the lots. Please add
a maintenance responsibility note for that swale.
Please provide a drainage easement for the swales and the grading that is proposed on
future development property in Filing 3 carrying runoff from the site.
The proposed elevations shown on the grading plans overlap each other at several
locations, please clarify. Basin Lines do not need to be shown on grading plan, if they are to
be shown, use smaller line weights. In general the grading plans are hard to decipher,
please clarify.
Swale C-C uses a 3:1 side slopes, why not 4:1 since it is off -site and you have room for that.
What is this "sod former" that is used for the swales, is it different from seeding ? Provide
detail.
Please clarify the location of the proposed landscape timber wall in the detention pond.
Typically masonry walls are used in detention ponds. The proposed use of landscape timber
walls in the pond could present a problem as to the long term viability of this wall.
Please show location of overflow spillway for both ponds on the grading plans
Topic: Plat
Number: 63 Created: 6/4/2004
[2/4/05]
[6/4/04] Tracts G and H should be designated as a drainage irrigation, access and utility
easement since an irrigation line may be located in the future to be within these tracts.
Number: 111 Created: 2/4/2005
[2/4/05]
Please call Tract G an Irrigation, Utility and Drainage easement so that in the future, the
irrigation line may be located within that tract.
Topic: Site
Number: 59 Created: 6/1/2004
[2/4/05]
[6/1/04] Please provide letters of intent from neighboring from the ditch company approving
the grading that extends into the ditch right of way, as well as the release of flows into the
ditch.
Topic: Utility Plans
Number: 107 Created: 2/1/2005
Storm Sewer system D does not have an acceptable separation from water lines between
inlets D-1 and D-5. Please clarify if line is being raised at this location, plans are not clear.
Provide 18" of clearance between storm and sanitary line at Beachcomber Lane.
Page 7
Department: Stormwater Utility Issue Contact: Basil Harridan
Topic: Details
Number: 114 Created: 2/4/2005
[2/4/05]
Please provide a revised water quality pond outlet detail for Pond 100 as it would be
modified by this filing.
Please call out the elevation of the outlet pipe invert on the detention pond outlet detail into
the irrigation canal.
Topic: Detention Pond Outlet
Number: 112 Created: 2/4/2005
[2/4/05]
The report states that the pond is to release detained flows to County Road 52. It was
agreed during previous meetings with the developer and Stantecwhen dealing with Filing 1
certification issues that the pond should be tied into the exiting 24" RCP pipe that was built
with the Richard's Lake project, provided an analysis is done to show that this pipe has
adequate capacity. Please show the appropiate tie in on the plans and correct the text of
the report.
Topic: Ditch Company Approval
Number: 106 Created: 2/1 /2005
[2/1 /05]
Please provide the City with a letter showing approval from the ditch company for releasing
flows into the ditch and for building the ripa rap and the outflow pipe into the Canal No.8
ditch easement.
Topic: Drainage Plan
Number: 113 Created: 2/4/2005
[2/4/05] Please provide pond summary tables for both ponds on the drainage plan. Number
the detention ponds. Make this exhibit readable.
Topic: Erosion Control
Number: 53 Created: 4/23/2004
[2/1/05]
Second Review
February 1, 2005
Please change the erosion control notes and the project schedule utilizing the latest
versions of both, which can be obtained from stormwater engineering.
[4/23/041
Sediment/Erosion Control Plan Comments
Lind Property 2nd Filing
April 12, 2004
1. There are no erosion control notes, plans, calculations, etc. Please provide.
Page 6
Number: 80 Created: 1 /28/2005
[1/28/05] Grading Sheets - Please label all slope ratios.
Number: 81 Created: 1 /28/2005
[1/28/05] Existing and proposed contour lines are hard to tell apart. Could you differentiate
these a little better? Thanks.
Number: 82 Created: 1 /28/2005
[1/28/05] Grading Sheets - Lot corners missing spot elevations.
Number: 83 Created: 1 /28/2005
[1/28/05] Show type 3 barricades where sidewalks terminate in each phase or filing.
Number: 84 Created: 1 /28/2005
[1/28/05] Need to show and label all grade breaks, VCs, driveway stationing where there is
vertical curb, see redlines. Some info missing on some sheets.
Number: 87 Created: 1 /28/2005
[1/28/05] Plan and Profiles - need to label and dimension row and fl to fl widths, each sheet.
Number: 88 Created: 1 /28/2005
[1/28/05] Manholes can not be located in the ramp areas, bike lanes, or the wheel path of a
car. Sheet 502 is a good example. Two inlets shown just north of Bowside, one is in a
sidewalk ramp on the east side of Thoreau and the other manhole is in front of the northwest
corner intersection ramp. The next sheet, 503, doesn't match what's shown on 502.
Number: 89 Created: 1 /28/2005
(1/28/05] Please provide street cross sections every 50' for collector streets.
Number: 90 Created: 1/28/2005
[1/28/05] Plan and Profile - grades may not exceed 3% at the intersections.
Number: 91 Created: 1 /28/2005
[1/28/05] Grading, Drainage, Erosion Control - Please provide drainage arrows showing
positive drainage to streets or to an approved drainage facility.
Number: 92 Created: 1 /28/2005
[1/28/05] See redlines for the cross slope exhibit comments. Some areas outside the
transition areas do not meet the minimum 2% cross slope requirement. Thank you for the
exhibit, it really made reviewing the design easy!!
Number: 93 Created: 1 /28/2005
[1/28/05] Please provide a detail on the appropriate plan and profile sheet for the street
widening (bulb out) areas. Call out and dimension the various dimensions in detail 7-24.
Number: 94 Created: 1 /28/2005
[1/28/05] Detail sheets - Detail 7-26 (temp turnaround) may or may not be necessary
depending on how you choose to do the phasing. Please provide details 707, 1401-1412 as
applicable, and the new ramp detail that I'll email to you.
Page 5
Number: 102 Created: 1 /31 /2005
[1/31/05] Please include the various line weights and the driveway symbol in the Legend.
Topic: Soils Report
Number: 28 Created: 4/21 /2004
[1/31/05] [4/21/04] Please provide another copy of the Soils Report (this can be done any
time from now through final compliance). We have a copy in the 1st filing file but we need
another for the 2nd filing file (the files need to be complete in and of themselves). Thanks
very much!
Topic: Traffic
Number: 45 Created: 4/23/2004
[1/31/05]
[4/23/04] Please provide long term geometry.
Topic: Utility Plans
Number: 71 Created: 1/28/2005
[1/28/05] Include the driveway symbol in the legend.
Number: 72 Created: 1/28/2005
[1/28/05] Remove all Filing 3 info from all sheets.
Number: 73 Created: 1/28/2005
[1/28/05] Please provide an ultimate and interim design for the Brightwater street stub. Will
need to provide 500' of offsite preliminary design. Sheets CS354 and 508 show two
different storm line - is one the interim and the other the ultimate? Will need to label so that
it's clear what's being installed with this project and what is being installed in the future.
Number: 74 Created: 1/28/2005
[1/28/05] Horizontal Control Sheet - Please provide a curve table for all meandering
sidewalks. You can also dimension it right on the plans if you like too. Either way is fine as
long as enough info is presented to lay it out in the field.
Number: 75 Created: 1/28/2005
[1/28/05] Typical Street Sections - Remove the word "min" from the drawings.
Number: 76 Created: 1/28/2005
[1/28/05] Striping and Signage - Please show all striping.
Number: 77 Created: 1/28/2005
[1/28/05] Erosion Control Plan - Unscannable. Will need to provide a grading and temp
construction easement for all offsite work.
Number: 78 Created: 1/28/2005
[1/28/05] Crosspans are not allowed in arterial or collector streets.
Number: 79 Created: 1/28/2005
[1/28/05] Grading Plan - If reworking the detention pond from the first filing, we'll need temp
construction and grading easements from the first filing.
Page 4
Number: 95 Created: 1/31/2005
[1/31/05] This project is responsible for designing and constructing the sidewalk and bridge
shown along the eastern portion of the site.
Topic: Landscape
Number: 56 Created: 5/25/2004
[1/31/05] This set does not meet the requirements of Appendix E6.
[5/25/04] Please see Appendix E6 for scanning requirements.
Number: 103 Created: 1/31/2005
[1/31/05] Does not match the Site or Utility plan (the daycare center and church have been
removed from the other plan sets).
Number: 104 Created: 1/31/2005
[1/31/05] The Legend needs to include the driveway symbol and the various line weights.
Number: 105 Created: 1/31/2005
[1/31/05] Remove all 3rd Filing info, all sheets.
Topic: Plat
Number: 16 Created: 4/19/2004
[1/27/05] [4/19/041 Please provide a tract table listing the tracts, what they are for, who
owns and who maintains. This may be a little more clear than labeling each one within the
tract itself and making the tract a little less crowded. Not all tracts are currently labeled with
what they are for. Should tracts G and H have access easements? See redlines for other
Q's.
Number: 96 Created: 1/31/2005
[1/31/05] I've emailed the updated Plat Language to Jim Allen -Morley. Please update the
plat with it. I've also emailed Jim the new Directional Ramp Detail, please make sure that
the correct row is dedicated to install them.
Number: 97 Created: 1/31/2005
[1/31/05] Can vacate the easements by separate document or by this plat. If you choose to
vacate by separate doc, then the reception numbers need to be shown on the plat.
Number: 98 Created: 1/31/2005
[1/31/05] Please see Appendix E6 for scanning requirements. Please correct all
overlapped labeling and remove all shading.
Number: 99 Created: 1/31/2005
[1/31/05] Need to show and dimension all row from the CL. Need to label what this project
is dedicating.
Topic: Site
Number: 100 Created: 1/31/2005
[1/31/05] Remove all 3rd Filing info, all sheets.
Number: 101 Created: 1/31/2005
[1/31/051 See Appendix E6 for scanning requirements. The sheets will not scan well as
shown.
Page 3
[1/27/05] [5/25/04] [4/23/04] This project is responsible for the design and construction of
Brightwater to the property line as well as 1/2 the cost of the ditch crossing. An additional
500' of preliminary design for the street is required beyond the property. In lieu of
constructing these improvements, the developer may escrow the cost of constructing the
street and the ditch crossing instead. If so, Brightwater must be constructed to the PCs and
a type 3 barricade must be provided at the opening. An estimate for the cost of constructing
the street and the box culvert must be submitted for the city's review and approval at final
compliance. This dollar amount will go into the DA to be paid prior to the issuance of the
first building permit and will be placed in an escrow account for seven years. If either the
pedestrian crossing or the Brightwater connection isn't made within that time frame, then the
money will be refunded to the developer.
Number: 44 Created: 4/23/2004
[1/27/051 Easements need to be recorded for any offsite improvements and the reception
number needs to go on the plans.
[5/25/04] [4/23/04] Please provide letters of intent from the ditch company and/or other
property owners for offsite grading in order to go to hearing. The actual easement can be
provided during final compliance.
Number: 48 Created: 4/23/2004
[1/28/05] Several of the sidewalk connections do not line up with each other across the
street or they don't line up with their ramps. Please see Dave Averill with Transportation
Planning for the newly proposed midblock crossing at Brightwater. His extension is 2643.
[5/25/04] [4/23/04] The sidewalk from Tract L to Brightwater should line up with the ramp
across the street at the proposed street cut. The sidewalks coming from the east at Tract G
should line up with a ramp across the street. Suggest moving the ramp proposed on the
south side to the north side. You can move the one storm inlet at Bowside to the south and
eliminate one manhole as well.
Number: 55 Created: 5/25/2004
[1/31/05] [5/25/04] The Site and Landscape plans do not match the Utility plans (ie: Tract
A is shown with improvements that aren't shown on the utility plans). The various plan sets
need to be coordinated to show the same information. The utility plans will need to provide
a preliminary design before going to hearing to determine that the proposed improvements
meet city standards.
Number: 60 Created: 6/3/2004
[1/31/05] This is being done with the first filing and the improvements will need to be
complete before any building permit is issued with the 2nd filing. Just keeping this comment
alive until the DA.
[6/3/04] This project is responsible for the construction of County Road 52 along their
frontage.
Number: 85 Created: 1 /28/2005
[1/28/051 A Public Access Easement from the property to the east needs to be obtained for
any of the portion of the sidewalk that is being built on their property. May want to pull the
sidewalk back onto the property just to keep things easy (but its optional of course).
Number: 86 Created: 1 /28/2005
[1/28/05] The "alley" needs to be called a private drive.
Page 2
vSTAFF PROJECT REVIEW
Citynf For# C:nilins
VIGNETTE STUDIOS Date: 02/09/2005
TERENCE HOAGLUND
144 N. MASON ST. #2
FT. COLLINS, CO 80524
Staff has reviewed your submittal for LIND PROPERTY 2ND FILING PDP/FC - TYPE I, and
we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Bob Barkeen
Topic: General
Number: 69 Created: 1 /24/2005
[1/24/05] The neighborhood center will need to be shown on the final compliance plans
similar to the PDP.
Number: 70 Created: 1 /24/2005
[1/24/05] Will tracts I, J, and L be used for the oil pipline for the proposed well site? If so, it
may need to be caloled out as seperate easement.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 14 Created: 4/19/2004
[1/27/05] Some of the sheets were illegible and may have more detailed comments to follow
with the next submittal once the text becomes clear.
(5/25/04] [4/19/041 See Appendix E6 for all scanning requirements and bring the plans sets
into conformance.
Number: 32 Created: 4/21 /2004
[1/28/051 A temporary turnaround may be required depending on where the phase line
goes. I met with Jim Allen -Morley at discussed the various options the developer has and
they'll make a decision for the next submittal.
[5/25/04] The platted boundary has changed and now the street frontage along lots 13 and
6 needs to be constructed in order to sell/build those lots.
[4/21/04] Will need to plat and construct the street along the frontage of lot 13, block 7, at
Beachcomber and Thoreau if you want to sell/build lot 7.
Number: 33 Created: 4/21 /2004
[1/28/05] This note may need to appear on other locations depending on where the phase
line goes.
[5/25/04] Note was provided on the Site plan, still must be provided on the plat.
[4/21/041 Rear access only off lots 3-6, block 6 at the roundabout, possibly even lots 2
and/or 7. A statement on the plat and site plan to this effect is required. See table 7 for
separation distances from driveways to intersections.
Number: 42
Created: 4/23/2004
Page I