HomeMy WebLinkAboutLIND PROPERTY - PDP - 39-94B - SUBMITTAL DOCUMENTS - ROUND 2 - TRAFFIC STUDYIICS2O00: Onsignalized Intersections Release 9.1c Michael P. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 Fax: 970-669-5034 E-Mail: mdelich@frii.com ROUNDABOUT ANALYSIS Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 3/14/03 Analysis Time Period: am m Intersection: CR111 CR52 Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: hort long bkgrd total Project ID: 0212 East/West Street: CR52 North/South Street: CR11 Volumes and Adjustment I Eastbound I Westbound I L T R I L T R I I I Northbound I Southbound I I L T R I L T R I I I I Volume 15 1 35 140 1 5 160 340 50 15 190 5 I PHF 10.85 0.85 0.85 10:85 0.85 0.85 10.85 0.85 0.85 10.90 0.90 0.90 1 Flow Rate 15 1 41 147 1 5 170 399 58 15 211 5 I Eastbound Westbound Northbound Southbound Approach Flow Rate 47 53 527 221 Conflicting Circulating Flow 263 474 11 118 Critical Gap and Follow-up Time Critical Gap (sec): Upper bound 4.10 4.10 4.10 4.10 Lower bound 4.60 4.60 4.60 4.60 Follow-up Time (sec): Upper bound 2.60 2.60 2.60 2.60 Lower bound 3.10 3.10 3.10 3.10 Results: Capacity and v/c Ratio Capacity (Eq. 10-124): Upper bound 1126 953 1372 1262 Lower. bound 927 771 1150 1050 v/c Ratio: Upper bound 0.04 0.06 0.38 0.18 Lower bound 0.05 0.07 0.46 0.21 BCS2000: Unsignalized Intersections Release 4.1c 'Michael P. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 Fax: 970-669-5034 E-Mail: mdelich@frii.com ROUNDABOUT ANALYSIS Analyst-: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 3/14/03 Analysis Time Period: am m Intersection: /CR52 Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: short long bkgrd total Project ID: 0217_ East/West Street: CR52 North/South Street: CR11 Volumes and Adjustment I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R I I I I I I Volume 110 1. 55 150 1 5 125 135 20 15 305 5 1 PHF 10.85 0.85 0.85 JO.85 0.85 0.85 10.85 0.85 0.85 10.85 0.85 0.85 1 Flow Rate I11 1 64 158 1 5 129 158 23 15 358 5 1 Eastbound Approach Flow Rate 76 Conflicting Circulating Flow 421 Critical Gap (sec): Westbound 64 198 Northbound Critical Gap and Follow-up Time 210 17 Southbound 368 88 Upper bound 4.10 4.10 4.10 4.10 Lower bound 4.60 4.60 4.60 4.60 Follow-up Time (sec): Upper bound 2.60 2.60 2.60 2.60 Lower bound 3.10 3.10 3.10 3.10 Results: Capacity and v/c Ratio Capacity (Eq. 10-124): Upper bound 994 1185 1366 1292 Lower bound 808 980 1144 1077 v/c Ratio: Upper bound 0.08 0.05 0.15 0.28 Lower bound 0.09 0.07 0.18 0.34 BCS2000: Unsignalized Intersections Release 4.1c Michael P. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 E-Mail: mdelich@frii.com Fax: 970-669-5034 ROUNDABOUT ANALYSIS Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 10/16/02 Analysis Time Period: an pm Intersection: C111 ountry Club Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year.: short bkgr total. Project ID: 0212 East/West Street: Country Club Road North/South Street: CRIA Volumes and Adjustment ( Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R I volume 1200 0 100 10 0 0 1160 270 0 10 145 130 1 PHF 10.91 0.91 0.91 10.85 0.85 0.85 10.85 0.85 0.85 10.85 0.85 0.85 1 Flow Rate 1219 0 109 10 0. 0 1188 317 0 10 170 152 1 Eastbound Westbound Northbound Southbound Approach Flow Rate 328 0 505 322 Conflicting Circulating Flow 170 724 219 188 Critical Gap and Follow-up Time Critical Gap (sec): Upper bound 4.10 4.10 4.10 4.10 Lower bound 4.60 4.60 4.60 4.60 Follow-up Time (sec): Upper bound 2.60 2.60 2.60 2.60 Lower bound 3.10 3.10 3.10 3.10 Results: Capacity and v/c Ratio Capacity (Eq. 10-124): Upper bound 1212 779 1166 1195 Lower bound 1004 618 963 989 v/c Ratio: Upper bound 0.27 0.00 0.43 0.27 Lower bound 0.33 0.00 0.52 0.33 IICS2000: Unsignalized Intersections Release 4.1c Michael P_ Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 Fax: 970-669-5034 E-Mail: mdelich@frii.com ROUNDABOUT ANALYSIS Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 10/16/02 Analysis Time Period: at pm Intersection: CR11/Country Club Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: short b k g r d Ctotal Project ID: 0212 East/West Street: Country Club Road North/South Street: CR11. Volumes and Adjustment I Eastbound I Westbound I Northbound I Southbound I L T R I L T R I L T R I L T R I Volume 180 U 135 10 0 0 185 95 U 10 235 180 I PHF 10.85 0.85 0.85 10.85 0.85 0.85 10.85 0.85 0.85 10.85 0.85 0.85 1 Flow Rate 194 0 158 10 0 0 199 ill 0 10 276 211 1 Eastbound Westbound Northbound Southbound Approach Flow Rate 252 0 210 487 Conflicting Circulating Flow 276 304 94 99 Critical Gap and Follow-up Time Critical Gap (sec): Upper bound 4.10 4.10 4.10 4.10 Lower bound 4.60 4.60 4.60 4.60 Follow-up Time (sec): Upper bound 2.60 2.60 2.60 2.60 Lower bound 3.10 3.10 3.1.0 3.10 Results: Capacity and v/c Ratio Capacity (Eq. 10-124): Upper bound 1115 1090 1286 1281 Lower bound 916 895 1072 1067 v/c Ratio: Upper bound 0.23 0.00 0.16 0.38 Lower bound 0.28 0.00 0.20 0.46 HCS2000: Unsignalized Intersections Release 4.1c Michael P. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 Fax: 970-669-5034 E-Mail: mdelich@frii.com t ROUNDABOUT ANALYSIS Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 10/16/02 Analysis Time Period: am pm Intersection: Mtn ista/CR9 Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: short b k g r tota]. Project ID: 0212 East/West Street: Mountain Vista North/South Street: CR9 Volumes and Adjustment I Eastbound I Westbound I Northbound I Southbound I I L T R I L T R I L T R I L T R I I I I I I Volume 190 140 0 10 275 55 10 0 0 135 0 60 1 PHF 10.88 0.88 0.86 10.85 0.85 0.85 10.87 0.87 0.88 10.89 0.89 0.89 1 Flow Rate 1102 159 0 10 323 64 10 0 0 139 0 67 1 Eastbound Westbound Northbound Southbound Approach Flow Rate 261 387 0 106 Conflicting Circulating Flow 39 102 300 323 Critical Gap and Follow-up Time Critical Gap (sec): Upper bound 4.10 4.10 4.10 4.10 Lower bound 4.60 4.60 4.60 4.60 Follow-up Time (sec): Upper bound 2.60 2.60 2.60 2.60 Lower bound 3.10 3.10 3.10 3.10 Results: Capacity and v/c Ratio Capacity (Eq. 10-124): Upper bound 1343 1278 1094 1074 Lower bound 1123 1064 898 880 v/c Ratio: Upper bound 0.19 0.30 0.00 0.10 Lower bound 0.23 0.36 0.00 0.12 HCS2000: Unsignalized Intersections Release 4.1c Michael P. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 Fax: 970-669-5034 E-Mail: mdelich@frii.com ROUNDABOUT ANALYSIS Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 10/16/02 Analysis Time Period: am pm Intersection: n Vista/CR9 Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: short bkgrd total Project ID: 0212 East/West Street: Mountain Vista North/South Street: CR9 Volumes and Adjustment I Eastbound I Westbound I Northbound- i Southbound I I L T R I L T R I I. T R I L T R I Volume I50 250 0 10 135 20 10 0 0 195 0 105 1 PHF 10.86 0.86 0.86 10.85 0.85 0.85 10.87 0.87 0.88 10.87 0.87 0.87 1 Flow Rate 158 290 0 10 158 23 10 0 0 1109 0 120 1 Eastbound Westbound Northbound Southbound Approach Flow Rate 348 181 0 229 Conflicting Circulating Flow 109 58 457 158 Critical Gap and Follow-up Time Critical Gap (sec): Upper bound 4.10 4.10 4.10 4.10 Lower bound 4.60 4.60 4.60 4.60 Follow-up Time (sec): Upper bound 2.60 2.60 2.60 2.60 Lower bound 3.10 3.10 3.10 3.10 Results: Capacity and v/c Ratio Capacity (Eq. 10-124): Upper bound 1271 1323 966 1223 Lower bound 1058 11.05 783 1015 v/c Ratio: Upper bound 0.27 0.14 0.00 0.19 Lower bound 0.33 0.16 0.00 0.23 HCS2000: Unsignalized Intersections Release 4.1c *Michael P. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 Fax: 970-669-5034 E-Mail: mdelich@frii.com ROUNDABOUT ANALYSIS Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 10//l.�'�6,/02 Analysis Time Period: amLNp Intersection: Mtn Vista/Timberline Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: hort bkgr total Project ID: 0212 East/West Street: Mountain Vista North/South Street: Timberline Road Volumes and Adjustment I Eastbound I L T R I I Westbound I L T R I I Northbound I L T R I I Southbound I I L T R I I I Volume 10 115 145 1150 225 0 1245 0 140 10 0 0 1 PHF 10.85 0.85 0.85 10.85 0.85 0.85 10.85 0.85 0.85 I1.00 1.00 1.00 1 Flow Rate 10 135 170 1176 264 0 1288 0 164 10 0 0 1 Eastbound Westbound Northbound Southbound Approach Flow Rate 305 440 452 0 Conflicting Circulating Flow 176 288 135 728 Critical. Gap and Follow-up Time Critical Gap (sec): Upper bound 4.3.0 4.10 4.10 4.10 Lower bound 4.60 4.60 4.60 4.60 Follow-up Time (sec): Upper bound 2.60 2.60 2.60 2.60 Lower bound 3.7.0 3.10 3.10 3.10 Results: Capacity and v/c Ratio Capacity (Eq. 10-124): Upper bound 1206 1104 1246 777 Lower bound 999 907 1035 6116 v/c Ratio: Upper bound 0.25 0.40 0.36 0.00 Lower bound 0.31 0.49 0.44 0.00 HCs2000: Unsignalized Intersections Release 4.1c Michael P. Delich Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 Fax: 970-669-5034 E-Mail: mdelich@frii.com ROUNDABOUT ANALYSIS Analyst: Michael Agency/Co.: Matthew J. Delich, P.E. Date Performed: 10/16/02 Analysis Time Period: am'pm Intersection: n Vista/Timberline Jurisdiction: Fort Collins Units: U. S. Customary Analysis Year: short bkgrd total Project TD: 0212 East/West Street: Mountain Vista North/South Street: Timberline Road Volumes and Adjustment I Eastbound I Westbound I Northbound I Southbound I I I. T R I L T R. L T R I L T R I I I I I I Volume l0 210 245 1150 85 0 190 0 60 10 0 0 1 PHF 10.90 0.90 0.90 10.85 0.85 0.85 10.89 0.89 0.89 I1.00 1.00 1.00 1 Flow Rate 10 233 272 1176 99 0 I101 0 67 10 0 0 1 Eastbound Westbound Northbound Southbound Approach Flow Rate 505 275 168 0 Conflicting Circulating Flow 176 101 233 376 Critical Gap and Follow-up Time Critical Gap (sec): Upper bound 4.10 4.10 4.10 4.10 Lower bound 4.60 4.60 4.60 4.60 Follow-up Time (sec): Upper bound 2.60 2.60 2.60 2.60 Lower bound 3.10 3.10 3.10 3.10 Results: Capacity and v/c Ratio Capacity (Eq. 10-124): Upper bound 1206 1279 1153 1030 Lower bound 999 1065 951 840 v/c Ratio: Upper bound 0.42 0.22 0.15 0.00 Lower. bound 0.51 0.26 0.18 0.00 APPENDIX B 80 �NOM z /--25115 mm ' t I Access D. U� o is 00 NOM �n �l z f- NOM / 1 /-3&125 515 --1/ Access C m Q NOM -� I 125180to Q U Q _ O � ' J 1 -NOM Z N4 c�v to 1-1520 �515 1 5a40 \\ �.-- W35 Richard's Lake 1 a5 --} �/ � � I 51`11s � CR52 laao NOM C 20140 10110 -.- 55135 cQi v T m N J� O' Country Club 80M) �/ U 135/100 8 o � c —s5r225 to�1salso �5 f 13srz7s 2101115- � Mountain Vista I I 2451145 ---� 25a140 �- N O N 1n 0 o R �-10115 $--95M80 J s- I -1401M 75M 751901165 550 1 5f65 ---� 25W 45Mo5 —/ } I Vine 13—�- 114 -�- o AM/PM ssno m m Rounded to Nearest N 5 Vehicles ca = J � E t- SHORT RANGE (2006) TOTAL Figure 7' PEAK HOUR TRAFFIC APPENDIX A TABLE I Short Range (2006) Total Peak Hour Roundabout Operation z '2VI� pov UPWI Timberline/Mountain Vista EB 0.42/0.51 0.25/0.31 WB 0.22/0.26 0.40/0.49 NB 0.15/0.18 0.36/0.44 Mountain Vista/CR9 EB 0.2710.33 0.19/0.23 WB 0.14/0.16 0.30/0.36 SB 0.19/0.23 0.10/0.12 CR1 1 /Country Club EB 0.23/0.28 0.27/0.33 NB 0.16/0.20 0.43/0.52 SB 0.38/0.46 0.27/0.33 CR1 1 /CR52 EB 0.08/0.09 0.04/0.05 WB 0.05/0.07 0.06/0.07 NB 0.15/0.18 0.38/0.46 SB 0.28/0.34 0.18/0.21 r MEMORANDUM co co Ln o C co TO: Yvonne Seaman, Centex Homes ' o Troy Campbell, The Sear -Brown Group o rn Terence Hoaglund, Vignette Studios City of Fort Collins O JO .._ .A U FROM: Matt Delich • 0 X 11 DATE: March 18,,2003 z a J > SUBJECT: The Lind Property Development, Filing 1 Transportation Impact Study Addendum - Roundabout analysis at arterial/arterial intersections (File: 0212MB01) w O N Cr 0) 0 CD The Fort Collins Code requires that the transportation impact w o study (TIS) contain a roundabout analysis at all arterial/arterial a r intersection that are included in the TIS. There were six arterial/ arterial intersections that were included in the TIS: Vine/Lemay, Z W o Vine/Timberline, Timberline/Mountain Vista, Mountain Vista/CR9, CR11/ U x Country Club, and CR11/CR52. Staff indicated that the Vine/Lemay and N r a Vine/Timberline intersections did not require analysis due to the N complications caused by the proximity of the railroad tracks. The N other intersections were not analyzed as roundabouts in the TIS, since they were shown to operate acceptably with conventional stop sign control. This memorandum provides the roundabout analysis at these intersections. Appendix. A contains Figure 7, Short. Range (2006) Total Peak Hour Traffic from the cited TIS. The marked intersections were analyzed as single lane roundabouts using the 2000 Highway Capacity Manual. This technique does not/.alculate level of service of or delay to the entering traffic. Instead, it provides a volume/capacity (v/c) ratio for'each erit"ering leg. The capacity is W expressed as an upper and lower bound. Table 1 shows the results of the roundabout analyses at the subject intersections. Calculation (L z forms are provided in Appendix B. As single lane roundabouts, all o: of these intersections will operate acceptably. Since the entering Zvehicles on all legs of a roundabout are typically not stopped, the V a vehicle emissions at a roundabout are less than that at a stop sign Z controlled intersection. Accidents at roundabout.intersections are J less severe than those at conventional intersections. If roundabouts (J Z O are built at any of these intersections, additional right-of-way will a likely be required at all four quadrants of the intersection odepending upon the ultimate design. This right-of-way requirement a. could have a negative impact on the existing homes in the area, Z particularly at the CR11/Country Club and CR11/CR52 intersections. a 5cc cc Since this is a developing area of Fort Collins, roundabout design is premature at this time. It is recommended that these intersections have stop sign control. If the City desires to pursue LL LL roundabout control in the future, right-of-way reservation/dedication a be considered. Qshould H C G