Michael P. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061 Fax: 970-669-5034
E-Mail: mdelich@frii.com
ROUNDABOUT ANALYSIS
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 3/14/03
Analysis Time Period: am m
Intersection: CR111 CR52
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: hort long bkgrd total
Project ID: 0212
East/West Street: CR52
North/South Street: CR11
Volumes and Adjustment
I Eastbound I Westbound
I L T R I L T R
I I
I Northbound I Southbound I
I L T R I L T R I
I I I
Volume
15 1 35 140
1 5
160 340 50 15
190 5 I
PHF
10.85 0.85 0.85 10:85
0.85 0.85
10.85 0.85 0.85 10.90
0.90 0.90 1
Flow Rate
15 1 41 147
1 5
170 399 58 15
211 5 I
Eastbound
Westbound
Northbound
Southbound
Approach Flow
Rate 47
53
527
221
Conflicting
Circulating Flow
263
474
11
118
Critical Gap and Follow-up Time
Critical Gap (sec):
Upper bound
4.10
4.10
4.10
4.10
Lower bound
4.60
4.60
4.60
4.60
Follow-up Time (sec):
Upper bound
2.60
2.60
2.60
2.60
Lower bound
3.10
3.10
3.10
3.10
Results:
Capacity and v/c
Ratio
Capacity (Eq. 10-124):
Upper bound
1126
953
1372
1262
Lower. bound
927
771
1150
1050
v/c Ratio:
Upper bound
0.04
0.06
0.38
0.18
Lower bound
0.05
0.07
0.46
0.21
BCS2000: Unsignalized Intersections Release 4.1c
'Michael P. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061 Fax: 970-669-5034
E-Mail: mdelich@frii.com
ROUNDABOUT ANALYSIS
Analyst-:
Michael
Agency/Co.:
Matthew J. Delich, P.E.
Date Performed:
3/14/03
Analysis Time Period:
am m
Intersection:
/CR52
Jurisdiction:
Fort Collins
Units: U. S. Customary
Analysis Year:
short long bkgrd total
Project ID: 0217_
East/West Street:
CR52
North/South Street:
CR11
Volumes and Adjustment
I Eastbound I Westbound I Northbound I Southbound I
I L T R I L T R I L T R I L T R I
I I I I I
Volume 110 1. 55 150 1 5 125 135 20 15 305 5 1
PHF 10.85 0.85 0.85 JO.85 0.85 0.85 10.85 0.85 0.85 10.85 0.85 0.85 1
Flow Rate I11 1 64 158 1 5 129 158 23 15 358 5 1
Eastbound
Approach Flow Rate 76
Conflicting Circulating Flow
421
Critical Gap (sec):
Westbound
64
198
Northbound
Critical Gap and Follow-up Time
210
17
Southbound
368
88
Upper bound
4.10
4.10
4.10
4.10
Lower bound
4.60
4.60
4.60
4.60
Follow-up Time (sec):
Upper bound
2.60
2.60
2.60
2.60
Lower bound
3.10
3.10
3.10
3.10
Results:
Capacity and
v/c Ratio
Capacity (Eq. 10-124):
Upper bound
994
1185
1366
1292
Lower bound
808
980
1144
1077
v/c Ratio:
Upper bound
0.08
0.05
0.15
0.28
Lower bound
0.09
0.07
0.18
0.34
BCS2000: Unsignalized Intersections Release 4.1c
Michael P. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
E-Mail: mdelich@frii.com
Fax: 970-669-5034
ROUNDABOUT ANALYSIS
Analyst:
Michael
Agency/Co.:
Matthew J. Delich, P.E.
Date Performed:
10/16/02
Analysis Time Period:
an pm
Intersection:
C111 ountry Club
Jurisdiction:
Fort Collins
Units: U. S. Customary
Analysis Year.:
short bkgr total.
Project ID: 0212
East/West Street:
Country Club Road
North/South Street: CRIA
Volumes and Adjustment
( Eastbound I Westbound I Northbound I Southbound I
I L T R I L T R I L T R I L T R I
volume 1200 0 100 10 0 0 1160 270 0 10 145 130 1
PHF 10.91 0.91 0.91 10.85 0.85 0.85 10.85 0.85 0.85 10.85 0.85 0.85 1
Flow Rate 1219 0 109 10 0. 0 1188 317 0 10 170 152 1
Eastbound
Westbound
Northbound
Southbound
Approach Flow Rate
328
0
505
322
Conflicting Circulating Flow
170
724
219
188
Critical
Gap and Follow-up
Time
Critical Gap (sec):
Upper bound
4.10
4.10
4.10
4.10
Lower bound
4.60
4.60
4.60
4.60
Follow-up Time (sec):
Upper bound
2.60
2.60
2.60
2.60
Lower bound
3.10
3.10
3.10
3.10
Results: Capacity and v/c Ratio
Capacity (Eq. 10-124):
Upper bound
1212
779
1166
1195
Lower bound
1004
618
963
989
v/c Ratio:
Upper bound
0.27
0.00
0.43
0.27
Lower bound
0.33
0.00
0.52
0.33
IICS2000: Unsignalized Intersections Release 4.1c
Michael P_ Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061 Fax: 970-669-5034
E-Mail: mdelich@frii.com
ROUNDABOUT ANALYSIS
Analyst:
Michael
Agency/Co.:
Matthew J. Delich, P.E.
Date Performed:
10/16/02
Analysis Time Period:
at pm
Intersection:
CR11/Country Club
Jurisdiction:
Fort Collins
Units: U. S. Customary
Analysis Year:
short b k g r d Ctotal
Project ID: 0212
East/West Street:
Country Club Road
North/South Street:
CR11.
Volumes and Adjustment
I Eastbound I Westbound
I Northbound
I Southbound
I L T
R I L
T R
I L T R
I L T R I
Volume
180 U
135 10
0 0
185 95 U
10 235 180 I
PHF
10.85 0.85
0.85 10.85
0.85 0.85
10.85 0.85 0.85
10.85 0.85 0.85 1
Flow Rate
194 0
158 10
0 0
199 ill 0
10 276 211 1
Eastbound
Westbound
Northbound Southbound
Approach
Flow Rate
252
0
210
487
Conflicting
Circulating
Flow
276
304
94
99
Critical
Gap and Follow-up
Time
Critical
Gap (sec):
Upper
bound
4.10
4.10
4.10
4.10
Lower
bound
4.60
4.60
4.60
4.60
Follow-up
Time (sec):
Upper
bound
2.60
2.60
2.60
2.60
Lower
bound
3.10
3.10
3.1.0
3.10
Results:
Capacity and
v/c Ratio
Capacity
(Eq. 10-124):
Upper
bound
1115
1090
1286
1281
Lower
bound
916
895
1072
1067
v/c Ratio:
Upper
bound
0.23
0.00
0.16
0.38
Lower
bound
0.28
0.00
0.20
0.46
HCS2000: Unsignalized Intersections Release 4.1c
Michael P. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061 Fax: 970-669-5034
E-Mail: mdelich@frii.com t
ROUNDABOUT ANALYSIS
Analyst:
Michael
Agency/Co.:
Matthew J. Delich, P.E.
Date Performed:
10/16/02
Analysis Time Period:
am pm
Intersection:
Mtn ista/CR9
Jurisdiction:
Fort Collins
Units: U. S. Customary
Analysis Year: short b k g r tota].
Project ID: 0212
East/West Street:
Mountain Vista
North/South Street:
CR9
Volumes and Adjustment
I Eastbound I Westbound I Northbound I Southbound I
I L T R I L T R I L T R I L T R I
I I I I I
Volume 190 140 0 10 275 55 10 0 0 135 0 60 1
PHF 10.88 0.88 0.86 10.85 0.85 0.85 10.87 0.87 0.88 10.89 0.89 0.89 1
Flow Rate 1102 159 0 10 323 64 10 0 0 139 0 67 1
Eastbound Westbound Northbound Southbound
Approach Flow Rate 261 387 0 106
Conflicting Circulating Flow
39 102 300 323
Critical Gap and Follow-up Time
Critical Gap (sec):
Upper bound
4.10
4.10
4.10
4.10
Lower bound
4.60
4.60
4.60
4.60
Follow-up Time (sec):
Upper bound
2.60
2.60
2.60
2.60
Lower bound
3.10
3.10
3.10
3.10
Results:
Capacity and v/c
Ratio
Capacity (Eq. 10-124):
Upper bound
1343
1278
1094
1074
Lower bound
1123
1064
898
880
v/c Ratio:
Upper bound
0.19
0.30
0.00
0.10
Lower bound
0.23
0.36
0.00
0.12
HCS2000: Unsignalized Intersections Release 4.1c
Michael P. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061 Fax: 970-669-5034
E-Mail: mdelich@frii.com
ROUNDABOUT ANALYSIS
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 10/16/02
Analysis Time Period: am pm
Intersection: n Vista/CR9
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: short bkgrd total
Project ID: 0212
East/West Street: Mountain Vista
North/South Street: CR9
Volumes and Adjustment
I Eastbound I Westbound I Northbound- i Southbound I
I L T R I L T R I I. T R I L T R I
Volume I50 250 0 10 135 20 10 0 0 195 0 105 1
PHF 10.86 0.86 0.86 10.85 0.85 0.85 10.87 0.87 0.88 10.87 0.87 0.87 1
Flow Rate 158 290 0 10 158 23 10 0 0 1109 0 120 1
Eastbound
Westbound
Northbound
Southbound
Approach
Flow Rate
348
181
0
229
Conflicting Circulating
Flow
109
58
457
158
Critical
Gap and Follow-up
Time
Critical
Gap (sec):
Upper
bound
4.10
4.10
4.10
4.10
Lower
bound
4.60
4.60
4.60
4.60
Follow-up Time (sec):
Upper
bound
2.60
2.60
2.60
2.60
Lower
bound
3.10
3.10
3.10
3.10
Results:
Capacity and v/c Ratio
Capacity
(Eq. 10-124):
Upper
bound
1271
1323
966
1223
Lower
bound
1058
11.05
783
1015
v/c Ratio:
Upper
bound
0.27
0.14
0.00
0.19
Lower
bound
0.33
0.16
0.00
0.23
HCS2000: Unsignalized Intersections Release 4.1c
*Michael P. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061 Fax: 970-669-5034
E-Mail: mdelich@frii.com
ROUNDABOUT ANALYSIS
Analyst:
Michael
Agency/Co.:
Matthew J. Delich, P.E.
Date Performed:
10//l.�'�6,/02
Analysis Time Period:
amLNp
Intersection:
Mtn Vista/Timberline
Jurisdiction:
Fort Collins
Units: U. S. Customary
Analysis Year: hort bkgr total
Project ID: 0212
East/West Street:
Mountain Vista
North/South Street:
Timberline Road
Volumes and Adjustment
I Eastbound
I L T R
I
I Westbound
I L T R
I
I Northbound
I L T R
I
I Southbound I
I L T R I
I I
Volume
10 115 145
1150
225 0
1245
0 140
10
0 0 1
PHF
10.85 0.85 0.85
10.85
0.85 0.85
10.85
0.85 0.85
I1.00
1.00 1.00 1
Flow Rate
10 135 170
1176
264 0
1288
0 164
10
0 0 1
Eastbound
Westbound
Northbound
Southbound
Approach Flow Rate 305
440
452
0
Conflicting
Circulating Flow
176
288
135
728
Critical. Gap and Follow-up Time
Critical Gap (sec):
Upper bound
4.3.0
4.10
4.10
4.10
Lower bound
4.60
4.60
4.60
4.60
Follow-up Time (sec):
Upper bound
2.60
2.60
2.60
2.60
Lower bound
3.7.0
3.10
3.10
3.10
Results:
Capacity and v/c
Ratio
Capacity (Eq. 10-124):
Upper bound
1206
1104
1246
777
Lower bound
999
907
1035
6116
v/c Ratio:
Upper bound
0.25
0.40
0.36
0.00
Lower bound
0.31
0.49
0.44
0.00
HCs2000: Unsignalized Intersections Release 4.1c
Michael P. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061 Fax: 970-669-5034
E-Mail: mdelich@frii.com
ROUNDABOUT ANALYSIS
Analyst:
Michael
Agency/Co.:
Matthew J. Delich, P.E.
Date Performed:
10/16/02
Analysis Time Period:
am'pm
Intersection:
n Vista/Timberline
Jurisdiction:
Fort Collins
Units: U. S. Customary
Analysis Year:
short bkgrd total
Project TD: 0212
East/West Street:
Mountain Vista
North/South Street:
Timberline Road
Volumes and Adjustment
I Eastbound I Westbound I Northbound I Southbound I
I I. T R I L T R. L T R I L T R I
I I I I I
Volume l0 210 245 1150 85 0 190 0 60 10 0 0 1
PHF 10.90 0.90 0.90 10.85 0.85 0.85 10.89 0.89 0.89 I1.00 1.00 1.00 1
Flow Rate 10 233 272 1176 99 0 I101 0 67 10 0 0 1
Eastbound Westbound Northbound Southbound
Approach Flow Rate 505 275 168 0
Conflicting Circulating Flow
176 101 233 376
Critical Gap and Follow-up Time
Critical Gap (sec):
Upper bound 4.10 4.10 4.10 4.10
Lower bound 4.60 4.60 4.60 4.60
Follow-up Time (sec):
Upper bound 2.60 2.60 2.60 2.60
Lower bound 3.10 3.10 3.10 3.10
Results: Capacity and v/c Ratio
Capacity (Eq. 10-124):
Upper bound 1206 1279 1153 1030
Lower bound 999 1065 951 840
v/c Ratio:
Upper bound 0.42 0.22 0.15 0.00
Lower. bound 0.51 0.26 0.18 0.00
APPENDIX B
80
�NOM
z
/--25115 mm
'
t I Access D.
U�
o
is
00
NOM
�n �l z
f- NOM
/ 1
/-3&125
515 --1/
Access C m
Q
NOM -�
I
125180to
Q
U
Q
_
O �
'
J 1
-NOM Z
N4
c�v to
1-1520
�515
1
5a40
\\
�.-- W35
Richard's Lake 1
a5 --}
�/
� � I 51`11s �
CR52
laao
NOM
C 20140
10110 -.-
55135
cQi v
T m N
J�
O'
Country Club 80M) �/
U
135/100
8 o
� c —s5r225
to�1salso
�5
f 13srz7s
2101115-
�
Mountain Vista
I
I
2451145 ---�
25a140 �-
N O
N
1n
0 o R
�-10115
$--95M80
J
s- I
-1401M
75M
751901165
550 1
5f65 ---�
25W
45Mo5 —/
} I Vine
13—�-
114 -�-
o
AM/PM
ssno
m m
Rounded to Nearest
N
5 Vehicles
ca =
J �
E
t-
SHORT
RANGE (2006) TOTAL
Figure 7'
PEAK HOUR TRAFFIC
APPENDIX A
TABLE I
Short Range (2006) Total Peak Hour Roundabout Operation
z
'2VI�
pov
UPWI
Timberline/Mountain Vista
EB
0.42/0.51
0.25/0.31
WB
0.22/0.26
0.40/0.49
NB
0.15/0.18
0.36/0.44
Mountain Vista/CR9
EB
0.2710.33
0.19/0.23
WB
0.14/0.16
0.30/0.36
SB
0.19/0.23
0.10/0.12
CR1 1 /Country Club
EB
0.23/0.28
0.27/0.33
NB
0.16/0.20
0.43/0.52
SB
0.38/0.46
0.27/0.33
CR1 1 /CR52
EB
0.08/0.09
0.04/0.05
WB
0.05/0.07
0.06/0.07
NB
0.15/0.18
0.38/0.46
SB
0.28/0.34
0.18/0.21
r
MEMORANDUM
co
co
Ln
o
C
co
TO: Yvonne Seaman, Centex Homes
'
o
Troy Campbell, The Sear -Brown Group
o
rn
Terence Hoaglund, Vignette Studios
City of Fort Collins
O
JO
.._ .A
U
FROM: Matt Delich
•
0
X
11
DATE: March 18,,2003
z
a
J
>
SUBJECT: The Lind Property Development, Filing 1 Transportation
Impact Study Addendum - Roundabout analysis at
arterial/arterial intersections (File: 0212MB01)
w
O
N
Cr
0)
0
CD
The Fort Collins Code requires that the transportation impact
w
o
study (TIS) contain a roundabout analysis at all arterial/arterial
a
r
intersection that are included in the TIS. There were six arterial/
arterial intersections that were included in the TIS: Vine/Lemay,
Z
W
o
Vine/Timberline, Timberline/Mountain Vista, Mountain Vista/CR9, CR11/
U
x
Country Club, and CR11/CR52. Staff indicated that the Vine/Lemay and
N
r
a
Vine/Timberline intersections did not require analysis due to the
N
complications caused by the proximity of the railroad tracks. The
N
other intersections were not analyzed as roundabouts in the TIS,
since they were shown to operate acceptably with conventional stop
sign control. This memorandum provides the roundabout analysis at
these intersections.
Appendix. A contains Figure 7, Short. Range (2006) Total Peak
Hour Traffic from the cited TIS. The marked intersections were
analyzed as single lane roundabouts using the 2000 Highway Capacity
Manual. This technique does not/.alculate level of service of or
delay to the entering traffic. Instead, it provides a
volume/capacity (v/c) ratio for'each erit"ering leg. The capacity is
W
expressed as an upper and lower bound. Table 1 shows the results of
the roundabout analyses at the subject intersections. Calculation
(L
z
forms are provided in Appendix B. As single lane roundabouts, all
o:
of these intersections will operate acceptably. Since the entering
Zvehicles
on all legs of a roundabout are typically not stopped, the
V
a
vehicle emissions at a roundabout are less than that at a stop sign
Z
controlled intersection. Accidents at roundabout.intersections are
J
less severe than those at conventional intersections. If roundabouts
(J
Z
O
are built at any of these intersections, additional right-of-way will
a
likely be required at all four quadrants of the intersection
odepending
upon the ultimate design. This right-of-way requirement
a.
could have a negative impact on the existing homes in the area,
Z
particularly at the CR11/Country Club and CR11/CR52 intersections.
a
5cc
cc
Since this is a developing area of Fort Collins, roundabout
design is premature at this time. It is recommended that these
intersections have stop sign control. If the City desires to pursue
LL
LL
roundabout control in the future, right-of-way reservation/dedication
a
be considered.
Qshould
H
C
G