Loading...
HomeMy WebLinkAboutLIND PROPERTY - OVERALL DEVELOPMENT PLAN - 39-94A - CORRESPONDENCE - STAFF'S PROJECT COMMENTSJ: 5 Issue Contact: Mark Jackson Request that additional width be preserved for bike lanes (6'each side) on the northern east/west Connector roadway internal to the site. This will be an important bike connection to the future park site and trail (activity areas per LUC). Be sure and return all of your redlined plans when you re -submit. If you have questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, BRIAN GRUBB City Planner 3 of 3 I 1 10 Issue Contact: Basil Hamdan. Drainage Easement - A drainage easement from the Windsor Reservoir and Canal Company (WRCC) will be needed to allow the flows from the site to enter their ditch. Without this easement, there will be no nearby outlet for stormwater from the site. The WRCC has expressed some concern as to the method of release into their ditch. Please contact them to discuss the different options for draining the site into their ditch. Traffic Operations 11 Issue Contact: Eric Bracke Vine and Lemay Level of Service - I have reworked the TIS analysis. The adequate public facilities issue at Vine and Lemay can be resolved with Eastbound/Westbound right turn lanes. These improvements will be the developer's responsibility. 12 Issue Contact: Eric Bracke Intersection Level of Service - The intersection of 52/11, Country Club/11, Lemay/Country Club fail level of service and adequate public facilities requirements. We need to discuss this further. Transportation Planning Issue Contact: Mark Jackson Does Traffic Engineer agree with the -LOS assessment (existing conditions) of Vine/Lemay? 2 Issue Contact: Mark Jackson • Does developer agree to make improvements to roadways identified in TIS to satisfy LOS in short term period? 3 Issue Contact: Mark Jackson Will project make improvements to CR 11 & CR 52(Minor Arterial) along their frontage as shown on MSP? Not stated clearly in TIS or documentation. 4 Issue Contact: Mark Jackson Developer will be responsible for building or escrowing funds for bridges and street connections across canal. 2 of 3 1✓tt.15 coP't STAFF PROJECT REVIEW Jack Vahrenwald Jim Sell Desiqn 153 W Mountain Ave Fort Collins, CO 80524 Date: 06/19/2001 Staff has reviewed your submittal for LIND PROPERTY OVERALL DEVELOPMENT PLAN, 139-94A, and we offer the following comments: ISSUES: Engineering 6 Issue Contact: Sheri Wamhoff Does Traffic Engineer agree with the LOS,assessment (existing conditions) of Vine/Lemay? 7 Issue Contact Sheri Wamhoff Clearly show the boundary of the ODP - it needs to be the current property line boundary. 8 Issue Contact: Sheri Wamhoff Note 4 - Please replace the words "if effective" with "in effect'. Park Planning 13 Issue Contact: Craig Foreman Park Location - Park location looks good. Still need to'see how canal improemnts, grading, will be developed; and impact on the park if any. Stonnwater Utility . 9 Issue Contact: Basil Hamdan General - In addition to the following comments, please consider the conceptual review comments made on 8/21/00 by Glen Schlueter before submitting the PDP for this project. Since there were no comments on the ODP utility and drainage plans, they were not returned. 1 of 3