HomeMy WebLinkAboutLIND PROPERTY - OVERALL DEVELOPMENT PLAN - 39-94A - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: LiAj o �z
Planner: Flivq�f rs
f4fleer: � zo%�,
Date:
Traff-icOperations: erg �7
Items Requested
Site land I Plat Utility Drainage R t Other Items Required
Engineering � dv�
Redlined Items Being Returned
Site I land I Plat Utility Dralna e R t Other Items Being Returned
Wrmwater
_
Watrr/Waitcwatc
Tra fiic Operations
PO
Trans. Planning
X
�1
Transfort
Hatural flerourut
Park Planning
_
XZ
n
a� .
—
—
—
Totals
y,
Hote: All redlined items should be returned with the rnubmittal/ revisions.
Item: FEW
r oR
'
FTLE: PROJECT PLANNER
ENGINEERING: PAVEMENT
SIM
• 1
----..---M---
BUILDING INSPECTION
-.--..--�----
• 1 RAFTING
-----.------�
.---...------
i.w w7i•
�.-ADVANCE
_-.-------
PL�-NNING
•
..------R-O.W.
----_
PLANNING
WATFR CONSERVATION
m---��---�