Loading...
HomeMy WebLinkAboutLIND PROPERTY - OVERALL DEVELOPMENT PLAN - 39-94A - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: LiAj o �z Planner: Flivq�f rs f4fleer: � zo%�, Date: Traff-icOperations: erg �7 Items Requested Site land I Plat Utility Drainage R t Other Items Required Engineering � dv� Redlined Items Being Returned Site I land I Plat Utility Dralna e R t Other Items Being Returned Wrmwater _ Watrr/Waitcwatc Tra fiic Operations PO Trans. Planning X �1 Transfort Hatural flerourut Park Planning _ XZ n a� . — — — Totals y, Hote: All redlined items should be returned with the rnubmittal/ revisions. Item: FEW r oR ' FTLE: PROJECT PLANNER ENGINEERING: PAVEMENT SIM • 1 ----..---M--- BUILDING INSPECTION -.--..--�---- • 1 RAFTING -----.------� .---...------ i.w w7i• �.-ADVANCE _-.------- PL�-NNING • ..------R-O.W. ----_ PLANNING WATFR CONSERVATION m---��---�