Loading...
HomeMy WebLinkAboutLIND PROPERTY - FDP - 39-94C - SUBMITTAL DOCUMENTS - ROUND 1 - RESPONSE TO STAFF REVIEW COMMENTSL. a n d s c a p e A r c h i t e c t.0 r e S i t e P l a n n i n g G r a p h i c s I appreciate your time in reviewing these plans. If you have any further questions, please feel free to contact me. Cc Yvonne Seamen, Centex Homes Troy Campbell, Sear Brown Group. Lind Property Filing One Response #1 to revisions 5/13/03 2 -Civic Center V i l l a g e 144 North Mason Street Suite 2 • Fort Collins, Colorado 80524 (970) 472-9125 • Fz x:(970j 494-0728 L a n d s c a p a A r c h i t e c t u r e S i to P l a n n*i n g G r a p h i c s May 13, 2003 Bob Barkeen, Project Planner Current Planning Division City of Fort Collins 281 N. College Avenue Fort Collins, CO 80524 Dear Bob, Attached are the final compliance plans for Lind Property Filing One. They have been revised in response' to City staff and agency review comments. The comments made and revisions requested on the PDP have been addressed as follows: Current Planning 181.Not sure what happened here. We had the plants in originally, but somewhere they disappeared. We have added them back onto the plans. We have also adjusted the street treep for the current utilities and street lights. Engineering — Landscape 17 Tree/utility separations have been revised per the current utilities 30 Corrected site distance easements have been shown. 74 Irrigation notes have been added to ensure that all medians and traffic circles are irrigated. 75 Reference Civil Plans 135 We have removed the contours, however I strongly disagree with this practice. Landscape concepts and seeding areas are usually directly tied to the grading, and it is difficult to understand the concepts without the grading, and exactly where different seed mixes should be, etc. Engineering — Site 130 The grading has been removed. 131 The site distance triangles have been corrected. 132 Note 411 has been corrected, with the construction phasing shown on the site and landscape plans. 106 Drive access notes for the alley homes has been added.. Engineering — Street Names 134 The correct name is Flagstaff Place. Light and Power 120 The street lights were shown on both the 100 scale plan, and the 30 scale plan. Street trees have been adjusted for the revised light locations. Stormwater-Landscape Plans 179 The street names have been added to all 30-scale landscape plans. Conflicts with storm inlets have been resolved. Lind Property Filing One Response # I to revisions 5/13/03 -Civic Center V i l l a g e 144 North Mason Street Suite 2 • Fort Collins, Colorado 80524 (970) 472-9125 • Fa :(970) 494-0728