HomeMy WebLinkAboutLINCOLN PARK (FORMERLY LINCOLN MIXED-USE PDP), 1110 E. LINCOLN - PDP - 40-94G - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSM
HCS2000: S alized Intersections Release le
• Analyst: Joseph Inter.: Lemay/Vine
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 12/6/04 Jurisd: Fort Collins
Period: amdE) Year recent shor long bkgrd otal
Project ID: 0497 no nb/sb left -turn
E/W St: Vine Street N/S St: Lemay Avenue
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
I Westbound
I Northbound
I Southbound I
L T R
1 L T R
I L T R
i L T R 1
No. Lanes
I
I
I
I I
I 0 1 0
1 1 1 0
I 1 1 0
1 0 1 0
LGConfig
I L TR
! L TR
I TR
I TR 1
Volume
I100 325 85
175 200 145
1 810 125
I 575 40 1
Lane Width
112.0 12.0
112.0 12.0
1 12.0
1 12.0 I
RTOR Vol
1 0
1 0
► 0
1 0 I
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A I NB Left
Thru A I Thru P
Right A i Right P
Peds I Peds X
WB Left A I SB Left
Thru A I Thru P
Right A I Right P
Peds I Peds X
NB Right I EB Right
SB Right I WB Right
Green 31.0 59.0
Yellow 3.0 3.0
All Red 2.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 155 485 0.71 0.32 43.9 D
TR 560 1805 0.80 0.31 40.0 D 40.8 D
Westbound
L 122 381
TR 541 1745
Northbound
TR 1079 1829
0.72 0.32 48.8 D
0.75 0.31 36.8 D
39.0 D
1.02 0.59 52.9 D 52.9 D
Southbound
TR 1090 1847 0.61 0.59 15.7
Intersection Delay = 39.3 (sec/veh)
B 15.7 B
Intersection LOS = D
• -y
HCS2000: S` lalized Intersections Release le
. Analyst: Joseph Inter_: Lemay/Vine
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 12/6/04 Jurisd: Fort Collins
Period: <pm Year recent f hor long bkgrd tot 1_
Project ID: 0497 no nb/sb left -turn
E/W St: Vine Street N/S St: Lemay Avenue
SIGNALIZED INTERSECTION SUMMARY
I Eastbound I Westbound I Northbound I Southbound I
L T R I L T R I L T R I L T R
I I I I I
No. Lanes I 1 1 0 I 1 1 0 1 0 1 0 I 0 1 0 I
LGConfig I L TR I L TR I TR I TR 1
Volume 135 145 65 1115 265 140 I 420 40 1 660 85 1
Lane Width 112.0 12.0 112.0 12.0 1 12.0 1 12.0 I
RTOR Vol I 0 1 0 I 0 I 0 I
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A I NB Left P
Thru A I Thru P
Right A I Right P
Peds X ( Peds X
WB Left A 1 SB Left P
Thru A I Thru P
Right A 1 Right P
Peds X 1 Peds X
NB Right 1 EB Right
SB Right 1 WB Right
Green 34.0 56.0
Yellow 3.0 3.0
All Red 2.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 167
477
0.23
0.35
23.7
C
TR 604
1776
0.38
0.34
25.4
C
25.2
C
Westbound
L 337
963
0.37
0.35
25.0
C
TR 600
1766
0.73
0.34
33.7
C
31.7
C
Northbound
TR 1031
1841
0.51
0.56
15.4
B
15.4
B
Southbound
TR 1027
1834
0.83
0.56
26.2
C
26.2
C
Intersection
Delay
= 24.9
(sec/veh)
Intersection
LOS = C
APPENDIX C
I
HCS2000: S' zalized Intersections Release le
Analyst:
Joseph
Inter.:
Lemay/Vine
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
12/6/04
Jurisd:
Fort Collins
Period:
am
Year
recen shor long bkgrd-ota1
Project
ID: 0497
E/W St:
Vine Street
N/S St:
Lemay Avenue
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
I Westbound
I Northbound
I Southbound ►
L T R
I L T R
I L T R
I L T R I
No. Lanes
I
I
I
I I
I 0 1 0 I
I 1 1 0
► 1 1 0
1 0 1 0
LGConfig
I L TR
I L TR
I LTR
I LTR I
Volume
1100 325 85
175 200 145
150 810 125
180 575 40 I
Lane Width
112.0 12.0
112.0 12.0
I 12.0
I 12.0 I
RTOR Vol
1 0
1 0
I 0
I 0 I
Duration 0.25
Area
Type: All other
areas
Signal Operations
Phase Combination 1 2
3 4 1
5
6 7 8
EB Left
A
1 NB
Left
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
I
Peds
X
WB Left
A
I SB
Left
P
Thru
A
(
Thru
P
Right
A
I
Right
P
Peds
I
Peds
X
NB Right
I EB
Right
SB Right
I WB
Right
Green
28.0
62.0
Yellow
3.0
3.0
All Red
2.0
2.0
Cycle
Length: 100.0 secs
Intersection
Performance Summary
Appr/ Lane
Adj Sat
Ratios
Lane Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c g/C
Delay
LOS
Delay LOS
Eastbound
L 117
405
0.94 0.29
99.2
F
TR 505
1805
0.89 0.28
52.3
D
61.5 E
Westbound
L 84
291
1.05 0.29
147.3
F
TR 489
1745
0.83 0.28
45.3
D
63.4 E
Northbound
LTR 1066
1720
1.09 0.62
73.4
E
73.4 E
Southbound
LTR 875
1411
0.86 0.62
26.5
C
26.5 C
Intersection
Delay
= 57.6 (sec/veh) Intersection
LOS = E
HCS2000: Signalized Intersections Release 4.le
Analyst: Joseph Inter.: Lemay/Vine
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 12/6/04 Jurisd: Fort Collins
Period: ®pm Year recent 4= long bkgrd
Project ID: 0497
E/W St: Vine Street NIS St: Lemay Avenue
SIGNALIZED INTERSECTION SUMMARY
Eastbound I Westbound I Northbound I Southbound
L T R I L T R I L T R I L T R
I I I I
No. Lanes I 1 1 0 I 1 1 0 I 0 1 0 I 0 1 0
LGConfig I L TR I L TR I LTR I LTR
Volume 135 145 65 1115 265 140 120 420 40 190 660 85
Lane Width 112.0 12.0 112.0 12.0 1 12.0 I 12.0
RTOR Vol ( 0 1 0 1 0 1 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A 1 NB Left P
Thru A I Thru P
Right A i Right P
Peds X I Peds X
WB Left A i SB Left P
Thru A I Thru P
Right A I Right P
Peds X I Peds X
NB Right i EB Right
SB Right I WB Right
Green 28.0 62.0
Yellow 3.0 3.0
All Red 2.0 2.0
Cycle Length: 100.0
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) V/c g/C Delay LOS Delay LOS
Eastbound
L 92
TR 497
Westbound
L 258
TR 494
Northbound
LTR 1080
Southbound
LTR 1009
316 0.41 0.29 31.6 C
1776 0.46 0.28 30.4 C
890 0.48 0.29 30.8 C
1766 0.89 0.28 52.6 D
30.6 C
47.7 D
1742.
0.51
0.62
12.3
B
12.3 B
1628
0.95
0.62
36.4
D
36.4 D
Intersection Delay = 32.8 (sec/veh) Intersection LOS = C
secs
APPENDIX B
11
HCS2000: S ialized Intersections Release le
Analyst:
Joseph
Inter.:
Lemay/vine
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
12/6/04
Jurisd:
Fort Collins
Period:
am(i
Year
recent ho long k r total
Project
ID: 0497
E/W St:
Vine Street
N/S St:
Lemay Avenue
I Eastbound
L T R
I
No. Lanes 1 1 1 0
LGConfig I L TR
Volume 1100 325 85
Lane Width 112.0 12.0
RTOR Vol 1 0
SIGNALIZED INTERSECTION SUMMARY
I westbound I Northbound I Southbound 1
I L T R I L T R I L T R I
I I I I
I 1 1 0 ► 0 1 0 1 0 1 0 ►
i L TR I LTR I LTR 1
170 200 145 150 800 120 180 570 40 ►
112.0 12.0 1 12.0 1 12.0
1 0 1 0 1 0 I
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A I NB Left P
Thru A 1 Thru P
Right A I Right P
Peds X I Peds X
WB Left A I SB Left P
Thru A I Thru P
Right A 1 Right P
Peds X I Peds X
NB Right I EB Right
SB Right I WB Right
Green 29.0 61.0
Yellow 3.0 3.0
All Red 2.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay.LOS
Eastbound
L 130 433
TR 523 1805
Westbound
L 97 323
TR 506 1745
Northbound
LTR 1049 1720
0.85
0.30
70.4 E
0.86
0.29
47.2 D
0.85
0.30
79.1 E
0.80
0.29
41.9 D
1.09 0.61 74.3 E
Southbound
LTR 859 1408 0.87 0.61 28.2
Intersection Delay = 53.9 (sec/veh)
C
51.8 D
48.2 D
74.3 E
28.2 C
Intersection LOS = D
3
IICS2000: S ialized Intersections Release le
Analyst:
Joseph
Inter.:
Lemay/Vine
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
12/6/04
Jurisd:
Fort Collins
Period Gpm
Year
recent hort long<bk r total
Project
ID: 0497
E/W St:
Vine Street
N/S St:
Lemay.Avenue
SIGNALIZED INTERSECTION SUMMARY
1 Eastbound
I Westbound
I Northbound
I Southbound I
L T R
I L T R
I L T R
I L T R 1
No. Lanes
I
I
I
I I
I 0 1 0 I
i 1 1 0
1 0 1 0
1 1 1 0
LGConfig
I L TR
I L TR
i LTR
I LTR 1
Volume
135 145 65
I110 265 140
120 415 35
I90 650 85 1
Lane Width
112.0 12.0
112.0 12.0
I 12.0
I 12.0 1
RTOR Vol
1 0
1 0
I 0
I 0 I
Duration 0.25
Area Type: All other
areas
Signal Operations
Phase Combination
1
2 3 4 1
5 6 7 8
EB Left
A
I NB
Left
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
X
I
Peds
X
WB Left
A
I SB
Left
P
Thru
A
(
Thru
P
Right
A
I
Right
P
Peds
X
I
Peds
X
NB Right
I EB
Right
SB Right
i WB
Right
Green
30.0
60.0
Yellow
3.0
3.0
All Red
2.0
2.0
Appr/ Lane
Lane Group
Grp Capacity
Eastbound
L 117
TR 533
Westbound
L 284
TR 530
Northbound
LTR 1046
Cycle Length: 100.0
_Intersection Performance Summary
Adj Sat Ratios Lane Group Approach
Flow Rate
(s) We g/C Delay LOS Delay LOS
377
0.32
0.31
28.1
C
1776
0.43
0.30
28.7
C 28.6 C
917
0.42
0.31
28.4
C
1766
0.83
0.30
43.3
D 40.1 D
1743 0.52 0.60 13.4 B 13.4 B
Southbound
LTR 977 1628 0.97 0.60 41.6 D 41.6 D
Intersection Delay = 33.2 (sec/veh) Intersection LOS = C
secs
APPENDIX A
TABLE I
Short Range (2007) Background Peak Hour Operation
P
-
EB LT
C
E
EB T/RT
C
D
EB APPROACH
C
D
WB LT
C
E
Lemay/Vine
(signal)
WB T/RT
D
D
WB APPROACH
D
D
NB LTrr/RT
B
E
SB LT/T/RT
D
C
OVERALL
C
TABLE 2
Short Range (2007) Total Peak Hour Operation
IN-q gv
"-,I M�M
. . . . . . . . . . . . . . . .
V115
-1�' P
Lemay/Vine
(signal)
EB LT
C
F
EB T/RT
C
D
EB APPROACH
C
E
WB LT
C
F
WB T/RT
D
D
WB APPROACH
D
E
NB LTIT/RT
B
E
SB LT/T/RT
D
C
OVERALL
C
E
TABLE 3
Short Range (2007) Total Peak Hour Operation
With No NB/SB Left Turns
W4 N
%
MUMMY"
EB LT
C
D_
EB T/RT
C
D
EB APPROACH
C
D
Lemay/Vine
(signal)
W3 LT
C
D
WB TIRT
C
D
WB APPROACH
C
D
NB T/RT
B
D
SB T/RT
C
B
OVERALL
C
D
w
Q
0
z
w
z
w
0J
CV
rl-
N
W
a.
W
L_
r
Co
0
L9
rn
0
r
x
a
LL
CD
O
N
co
T
O
0)
rn
w
z
n
a
z
w
w
z
z
w
z
0
a
0
a
Z
z
a
H
03
U
LL
LL
a
H
TO: Kaye Vincent, Lagunitas Companies
Cathy Mathis, VF Ripley Associates
Tricia Kroetch, North Star Design
City of Fort Collins
FROM: Matt Delich 4VA�
DATE: January 11, 2006
SUBJECT: Lincoln Mixed -Use Project Transportation Impact Study -
Adequate Public Facilities analysis of Vine/Lemay
intersection (File: 0497ME01)
This memorandum addresses the adequate public facilities (APF)
issues related to the Vine/Lemay intersection. Historically, this
intersection has been problematic due to geometric constraints. In
the future, Vine Drive will be moved to the north. When this occurs,
it is anticipated that there will not be an APF issue. However, in
the interim, analyses are required that address solutions to the APF
operational issue.
Currently, the Lemay/Vine intersection has one approach lane on
Lemay Avenue, and eastbound and westbound left -turn lanes on Vine
Drive. The Lemay/Vine intersection was analyzed both with and
without the Lincoln Mixed -Use Project site generated traffic. As
shown in Table 1, the Lemay/Vine intersection will meet the City
operational standards during the peak hours without the Lincoln
Mixed -Use Project site traffic. Calculation forms are provided in
Appendix A. With the Lincoln Mixed -Use Project site generated
traffic, the subject intersection will operate acceptably in the
morning peak hour, but it will not meet the City operational
standards in the afternoon peak hour. This is reflected in Table 2.
Calculation forms are provided in Appendix B. The increase in delay
is greater than 2 percent, even though the increase in traffic is
less than 1 percent. Therefore, the impact of the site generated
traffic is significant per the City of Fort Collins criteria.
Northbound and southbound left -turn lanes would require additional
right-of-way and redesign of the railroad crossing. Since the City
of Fort Collins Master Street Plan shows the Lemay/Vine intersection
shifted to the north with a future grade separated railroad crossing,
purchasing right-of-way and upgrading the existing railroad crossing
would not be reasonable.
Restriction of northbound and southbound left -turns during the
peak hours has been entertained by the City in other transportation
impact studies. Analysis of the Lemay/Vine intersection with the
left -turn restrictions is shown in Table 3. Calculation forms are
provided in Appendix C. The Lemay/Vine intersection will operate
acceptably in both the morning and afternoon peak hours with
northbound and southbound left -turn restrictions.
If unacceptable operation occurs during one or more peak hours
at the Lemay/Vine intersection, the City may implement "no left turn
during peak hours" action for the northbound and southbound traffic
on Lemay Avenue. This will result in acceptable operation at this
intersection.
-MAI N ST
�i�XjBf�jA�P-A�2,K�
=/JI I I I I
U) U)—
o
ROMERO PARK "
BUCKINGHAM ST -
UCI IKII INIGHAM P RK
COY DITCH E.LINCOLN
La Poudre
E
[LPL
7
ST
SITE
#40-94G - Lincoln Park PDP
6/15/2007
N
1 inch equals 800 feet
Lincoln Park P.D.P., #40-94G
June 28, 2007 Administrative Hearing
Page 10
Timing of the grade -separated intersection improvement and Vine/Lemay and
corresponding improvements at Lincoln Avenue and Duff Drive is uncertain, but
preliminary design has resulted in the dedication of new rights -of -way to
accommodate these streets. In the interim, the development will utilize Lincoln
and Lemay Avenues in their present configuration.
In summary, the P.D.P. adequately provides vehicular, pedestrian and bicycle
facilities necessary to maintain the adopted transportation Level of Service
standards contained in Part 11 of the City of Fort Collins Multi -modal
Transportation Level of Service Manual for the following modes of travel: motor
vehicle, bicycle and pedestrian. Currently, and in the short range future, the key
intersections will operate acceptably.
5. Findings of Fact/Conclusion:
In evaluating the Lincoln Park P.D.P., Staff makes the following findings of fact:
A. The site is in the boundary area of the East Mulberry Corridor Plan and is
consistent with adopted plan designations and policies of the Plan.
B. The proposed residential land uses comply with the use, density and
design requirements of the M-M-N zone district.
C. The P.D.P. complies with the zone district requirements for Mix of
Housing, Public Gathering Spaces and Design Standards.
D. The P.D.P. complies with the applicable General Development Standards
found in Article 3.
RECOMMENDATION:
Staff recommends approval of Lincoln Park P.D.P., #40-94G.
Lincoln Park P.D.P., #40-94G
June 28, 2007 Administrative Hearing
Page 9
K. Section 3.6.4 — Transportation Level of Service Requirements
"All development plans shall adequately provide vehicular, pedestrian and
bicycle facilities necessary to maintain the adopted transportation Level of
Service standards for the following modes of travel. motor vehicle, bicycle
and pedestrian."
An intermediate, short-range (2006) Transportation Impact Study was prepared
in conjunction with the P.D.P.
There is one key intersection impacted by the development: East Vine
Drive/North Lemay Avenue. In the short range, given full development of the
Lincoln Project, the intersection will operate acceptably in the morning peak hour,
but it will not meet operational standards in the afternoon peak hour. The
increase in traffic delay is greater than 2 percent, even though the increase in
traffic is less than 1 percent. Northbound and southbound left -turn lanes would
require additional right-of-way and redesign of the railroad crossing south of the
Vine/Lemay intersection. Since the Street Master Plan shows the Vine/Lemay
intersection shifted to the north with a future grade separated railroad crossing,
purchasing right-of-way and upgrading the existing railroad crossing would not be
reasonable as a requirement of the Project.
Restriction of northbound and southbound left -turns during the peak hours has
been entertained by the City in other traffic studies for projects within the area.
The Vine/Lemay intersection will operate acceptably in both the morning and
afternoon peak hours with northbound and southbound left -turn restrictions and
the incorporation of a southbound left turn lane off Lemay Avenue onto Fitzgerald
Drive.
If unacceptable operation occurs during one or more peak hours at the
Vine/Lemay intersection, the City may implement "no left turn during peak hours"
action for the northbound and southbound traffic on Lemay Avenue. This will
result in acceptable operation at this intersection.
The level of service for pedestrian, bicycle, and transit modes based upon the
measures in the multi -modal transportation guidelines has been achieved
through the project design.
Detached public sidewalks will be constructed along all public streets constructed
in conjunction with this development, including along existing Lincoln and Lemay.
Further, on -street bicycle lanes are an integral part of the roadway design for
realigned Lincoln and Lemay Avenues and future Duff Drive.
Lincoln Park P.D.P., #40-94G
June 28, 2007 Administrative Hearing
Page 8
"To prevent residential streetscapes from being dominated by protruding
garage doors, and to allow the active, visually interesting features of the
house to dominate the streetscape, the following standards shall apply:
(1) Street -facing garage doors must be recessed behind either the front
facade of the ground floor living area portion of the dwelling or a covered
porch (measuring at least six (61 feet by eight [81 feet) by at least four (4)
feet. Any street -facing garage doors complying with this standard shall not
protrude forward from the front facade of the living area portion of the
dwelling by more than eight (8) feet.
(2) Garage doors may be located on another side of the dwelling ("side- or
rear -loaded") provided that the side of the garage facing the front street
has windows or other architectural details that mimic the features of the
living portion of the dwelling.
(3) Garage doors shall not comprise more than fifty (50) percent of the ground
floor street -facing linear building frontage. Alleys and comer lots are
exempt from this standard."
All garages within the P.D.P are alley -loaded; therefore, the standard has been
satisfied.
J. Section 3.6.3 — Street Pattern and Connectivity Standards
"The local street system of any proposed development shall be designed
to be safe, efficient, convenient and attractive, considering use by all
modes of transportation that will use the system (including, without
limitation, cars, trucks, buses, bicycles, pedestrians and emergency
vehicles."
All internal streets within the P.D.P. are public streets. Forbes Drive, Santiago
Lane, and Becca Lane, all local streets, connect the P.D.P. to existing major
arterial streets, Lemay and Lincoln Avenues. The new internal local streets will
feature detached sidewalks, on -street parking on both sides, and two travel
lanes.
At the perimeter of the PDP are new arterial and collector streets. The
subdivision plat provides right-of-way dedications for realigned Lemay and
Lincoln Avenues. Additionally, right-of-way has been dedicated for a new 2-lane
collector road connecting existing Duff Drive with the alignment of existing
Buckingham Street.
Lincoln Park P.D.P., #40-94G
June 28, 2007 Administrative Hearing
Page 7
(2) Each housing model shall have at least three (3) characteristics which
clearly and obviously distinguish it from the other housing models,
including different floor plans, exterior materials, roof lines, garage
placement, placement of the footprint on the lot, and/or building face. "
The standard has been met through provision of attached single family units (aka
townhouses), flats, attached units and carriage houses. Each housing type has
been provided different floor plans, building elevations and materials.
Townhouse style units are distinguished by varied materials and architectural
forms for each unit along a facade.
G. Section 3.5.2(C) — Relationship of Dwellings to Streets and Parking
"Every front fagade with a primary entrance to a dwelling unit shall face
the adjacent street to the extent reasonably feasible. Every front fagade
with a primary entrance to a dwelling unit shall face a connecting walkway
with no primary entrance more than two hundred (200) feet from a street
sidewalk. "
As mentioned, all but two buildings provide primary dwelling unit entrances facing
an adjacent public street. Buildings 15 and 16, containing a total of 16
townhouse units have front doors opening directly on a connecting walkway
leading to the street and which are no more than 110 feet in length. Therefore,
the requirements of this section have been satisfied.
H. Section 3.5.2(D) — Residential Building Setbacks
"The minimum setback of every residential building and of every detached
accessory building that is incidental to the residential building from any
arterial street right-of-way shall be thirty (30) feet.
Minimum setback of every residential building and of every detached
accessory building that is incidental to the residential building from any
public street right-of-way other than an arterial street shall be fifteen (15)
feet".
All proposed residential buildings and garages comply with the required minimum
setbacks.
Section 3.5.2(E) — Garage Doors
Lincoln Park P.D.P., #40-94G
June 28, 2007 Administrative Hearing
Page 6
Parking Stall Dimensions [3.2.2(L)] — All proposed parking spaces meet the
parking stall dimensions of this section.
C. Section 3.3.1(B) — Subdivision Lot Standards.
The subdivision plat is in compliance with Section 3.3.1(B) Lots in that:
1) Each lot has direct vehicular access to a public street and the side lot
lines are substantially at right angles or radial to the street lines.
2) The general layout of lots, roads, driveways, utilities, drainage
facilities and other services within the development have connect to
existing and planned future infrastructure, including streets described
under the Master Street Plan and the East Mulberry Corridor Plan.
D. Section 3.3.1(C) — Public Dedications
An applicant is required to dedicate rights -of way for public streets, drainage
easements and utility easements as needed to serve the area being platted.
Rights -of -way for Santiago Lane, Fitzgerald Drive, Forbes Lane, Becca Lane,
and future realignments to Lincoln and Lemay Avenues and the drainage, utility
and sight distance easements necessary to serve this lot will be dedicated with
the subdivision plat, if approved and filed.
E. Section 3.2.4 — Site Lighting
The lighting designs must be fully shielded and in accordance with the
requirements of this section. A street light plan has been submitted that shows
how public street lighting will integrate with street tree placement and ensure
public health and safety. Details on the on -site lighting will be worked out at the
time of Final Plan review.
F. Section 3.5.2(B) — Model Housing Variety
(1) "Any development of one hundred (100) or more single-family detached,
single-family attached in groups of two (2), or two-family detached
dwelling units shall have at least four (4) different types of housing
models. The applicant shall include in the application for approval of the
project development plan documentation showing how the development
will comply with the foregoing requirement.
Lincoln Park P.D.P., #40-94G
June 28, 2007 Administrative Hearing
Page 5
purchasers, heirs and assigns, including a Homeowner's Association that the
trees will be removed in conjunction with future street construction.
All applicable landscape design standards of Article 3 have been met.
B. Section 3.2.2 —Access, Circulation and Parking
General Standard [3.2.2 (B)] — The proposed parking and circulation systems in
this PDP accommodate cars, bikes and pedestrians safely, efficiently and
conveniently. The pedestrian system provides direct, convenient, continuous
access throughout the site with crosswalks and ramps where needed and visual
interest and security.
Safety Considerations [3.2.2(C)(1)] —As required, pedestrian areas are
separated from vehicle areas and bicycle areas by the use of detached 4.5 foot
wide sidewalks along local streets and 6 foot -wide detached sidewalks along
future collector and arterial level roads. There will be dedicated bike lanes along
the future arterial and collector roadways.
Bicycle Facilities [3.2.2(C)(4)] — Adequate bicycle parking will be required for the
community gathering space and for the residential units.
Walkways [3.2.2(C)(5)] — Walkways within the site directly and continuously
connect points of pedestrian origin and destination. Such walkways provide a
direct connection between the building entries and internal walkway system. This
standard is therefore satisfied.
Parking Lot Layout [3.2.2 (E) The few parking areas that are provided
incorporate well-defined circulation routes, traffic control signs where appropriate,
perpendicular parking bays where appropriate, numerous landscaped islands,
and clearly defined pedestrian and bicycle access points.
Required Number of Spaces for Type of Use [3.2.2(K)] — Parking requirements
for the residential units have been met through the garage and surface parking
spaces shown on the plan. A total of 334 parking spaces have been provided
where a minimum of 283 parking spaces is required.
Handicap Parking [3.2.2(K)(5)] — The proposed site plan will satisfy this
requirement in terms of the number of handicap parking stalls, their location and
configuration.
Lincoln Park P.D.P., #40-94G
June 28, 2007 Administrative Hearing
Page 4
• Facilities are easily accessible. The P.D.P. will provide direct
bicycle and pedestrian access via a network of on -street sidewalks
and an internal path system. A field of 9 parking spaces, including
disabled stalls, are immediately abutting the gathering space.
Facilities consist of a swimming pool, hardscape, small turf area
and mail kiosk.
• This area will be maintained by the Homeowner's Association.
D. Development Standards Specific to the MMN District
Section 4.6 (E)(1) requires that each development be composed of complete
blocks bounded by public or private streets and within a prescribed maximum
size in order to promote attractive streets that provide direct pedestrian
movements. The proposal meets the design requirements of this section since
block sizes range from just under 2 acres to 4.7 acres, which is substantially less
than the 7 acre maximum. More than 50% of the block faces consist of building
frontages. No buildings exceed 3 stories.
4. Compliance with Applicable General Development Standards:
A. Section 3.2.1 — Landscaping and Tree Protection
The PDP provides significant canopy shading to reduce glare and heat buildup.
Visual quality and continuity with the development is addressed through the
provision of full tree stocking along the perimeter of buildings, and adjacent
surface parking lots. All trees proposed in the Master Plant List are species
approved by the City Forester and are shown as sufficiently diverse and spaced
adequately to satisfy the standards for parkway conditions and with regard to
spacing from utilities. Landscape notes are sufficient to achieve Code
requirements.
Trees will be planted matching the new rights -of -way for realigned Lincoln and
Lemay Avenues allowing the trees to grow substantially between now and such
time that these new arterial streets are constructed. The applicant has elected to
plant street trees along the existing arterial frontages for aesthetic reasons, with
the understanding that such trees will need to be removed in the future and are
not likely to survive transplanting. Statements indicating the likelihood of future
tree removal will be provided in the development agreement, alerting future
Lincoln Park P.D.P., #40-94G
June 28, 2007 Administrative Hearing
Page 3
Single family attached dwellings, attached multi -family dwellings and "carriage
houses" which are considered detached dwellings, are permitted subject to
administrative review. The 166 units on 15.5 gross acres equals approximately
12 dwelling units per acre, consistent with the minimum density requirement for
M-M-N zoned projects.
B. Mix of Housing
Section 4.6(D)(2)(d) requires that
The lot size and layout pattern for Medium Density Mixed -Use Neighborhoods
shall be designed to allow buildings to face toward the street.
The proposed pattern of internal public streets and placement of buildings results
in all units, except for those housed in buildings 15 and 16 and which front a
large detention pond, to front directly on a public street. Those 12 residential
units that do not face the street are connected to the street and public sidewalk
system through a pedestrian spine, thus satisfying the standard.
C. Small Neighborhood Parks, Central Feature or Gathering Space
Section 4.6(D)(3) requires that
At least ninety (90) percent of the dwellings in all development projects shall be
located within one thousand three hundred twenty (1,320) feet (one-quarter[114]
mile) of either a neighborhood park, a privately owned park or a central feature or
gathering place that is located either within the project or within adjacent
development, which distance shall be measured along street frontage without
crossing an arterial street.
A public gathering space is located at the corner of proposed Fitzgerald Drive
and Becca Lane. Therefore, at least 90% of the dwelling units are within one -
eight of a mile (660') of the gathering space. This public space contains
approximately 14,000 square feet and includes a swimming pool, small entry
plaza area, mail kiosk and maintained irrigated turf.
The gathering space complies with the standard in the following manner
The area is highly visible and formed by Becca Lane and Fitzgerald
Drive Street. None of this public space is bordered by rear yards,
and is easily observable from the two public streets.
Lincoln Park P.D.P., #40-94G
June 28, 2007 Administrative Hearing
Page 2
COMMENTS
1. Background:
The surrounding zoning and land uses are as follows:
N: R-L; Existing Single Family Housing (Andersonville Subdivision, Via
Lopez/San Cristo) with Single Family Housing (Alta Vista) and Agricultural
beyond.
S: C; Bull Run Apartments, Wal-Mart
E: I; Vacant; Existing Industrial Uses
W: I; Vacant; Existing Industrial Uses
The property was annexed in December 1994 as part of the East Lincoln Third
Annexation. A City Plan Structure Plan map designation amendment and
rezoning from I -Industrial to M-M-N was approved in 2002.
Until recently, the site contained a dilapidated farmhouse, masonry silo and
outbuildings. These structures have been demolished due to their lack of
structural integrity and invitation as an attractive nuisance.
2. East Mulberry Corridor Plan:
The site is located within the boundary area of the East Mulberry Corridor Plan.
With a Land Use designation of "Medium Density Residential" on the adopted
Framework Plan, the Project is found to be consistent with the Plan. The
Proposed Street Network Plan identifies the relocation of Lemay Avenue to
accommodate a grade separated intersection at Vine Drive, realignment of
Lincoln Avenue, and construction of an extension to Duff Drive. All three of these
future street improvements directly impact the Project.
A small corner of the property, to be platted as Tract 1 and containing 14, 903 sq.
ft. in area, is located within the boundary area of the Northside Neighborhoods
Plan. This parcel will remain undeveloped although it lies within the PDP
boundary.
3. Compliance with the M-M-N District Standards:
A. Land Use and Density
ITEM NO.
MEETING DATE
STAFF___,!I
Citv of Fort Collins HEARING OFFICER
STAFF REPORT
PROJECT: Lincoln Park P.D.P., #40-94G
APPLICANT: Lagunitas Companies
c/o Jon Prouty
3944 JFK Parkway, Suite 12E
Fort Collins, CO 80525
OWNER: Webster Associates
705 Kirtley Road
Lusk, WY 82225
PROJECT DESCRIPTION:
This is a request for 166 dwelling units within 23 buildings on 15.5 gross acres.
The site is located at the northeast corner of Lincoln and Lemay Avenues. The
housing types include a mix of 121 townhouses, 27 flats, 6 attached units and 12
carriage houses above garages. Primary access is gained via Lincoln Avenue
and through newly dedicated streets internal to the site. The Project has been
designed to accommodate future construction of realignments to Lincoln and
Lemay Avenues. The parcel is zoned M-M-N, Medium Density Mixed -Use
Neighborhood.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
The land uses, single family detached dwellings and multi -family dwellings, are
permitted within the M-M-N zone district. The P.D.P. complies with the zone
district requirements for mix of housing types, access to a central feature and
design standards. The P.D.P. complies with the applicable General
Development Standards.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
PLANNING DEPARTMENT