HomeMy WebLinkAboutLINCOLN PARK (FORMERLY LINCOLN MIXED-USE PDP), 1110 E. LINCOLN - PDP - 40-94G - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (7)w
Engineering — All comments resolved and/or complied with.
Light & Power — All comments resolved and/or complied with.
Stormwater Utility — All comments resolved and/or complied with.
Transportation Planning — All comments resolved and/or complied with.
Water Wastewater — All comments resolved and/or complied with.
Zoning — All comments resolved and/or complied with.
Forestry — All comments resolved and/or complied with.
ELCO — Have obtained petition and will submit to ELCO water district.
USPS — All comments resolved and/or complied with.
Thank you for your assistance in helping us move this challenging project quickly
to final approval.
Sincerely,
T
Prouty, President
sLincoln, Inc.
JP/ksr
March 1, 2006
Cameron Gloss
Director of Current Planning
281 N. College Avenue
Fort Collins, CO 80521
Re: Lincoln Mixed Used Project ---Response to July 11, 2005 Staff Project
Review Comments
Dear Cameron,
Enclosed are our responses to Staff Comments dated July 11, 2005:
49. New building elevations have been provided.
39. Landscape has been adjusted as requested.
40. Buffer transition to the east has been included to the extent possible. It
should also be noted that the east side of the residential units are the garage
side — non -viewing side of the townhouses with the view being to the open
space, park and mountains to the west. Furthermore there is a large open space
to the east that will either remain as open space or will have buildings fronting on
the new aligned Lincoln, landscaping and parking screening and creating
distance between our residential use and that probable office -warehouse use.
Furthermore, the nature, design and architecture of the probable use to the east
will be a transition between our project and the industrial as well as a mutual
buffer both for our residential and the industrial.
29. See response immediately above. In addition, with regard to the uses and
buffer to the north, the same considerations are relevant. There will be an open
space parcel to the north between our project and the street. Also, again, the rear
driveway -garage end of our building will be facing the street, whereas the front of
our building will look out to the south and the west mountains. In addition, it
should be noted that to the north is residential. And also, there is a residential to
the immediate south. Therefore this project represents a continuation of that
pattern of residential to the north and south, as well as providing a buffer
between uses to the east.
3944 JFK Parkway, Ste. 12E, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125