HomeMy WebLinkAboutLINCOLN EAST CONVENIENCE CENTER PUD, LOT 1 - FINAL - 40-94E - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSComments continued from the previous page... b. FULL CROSS -SECTIONS AT A MINIMUM OF EVERY 50 FEET SHOWING THE ROW LINES, CENTERLINE, FLOWLINE, STATIONING, ELEVATIONS, SIDEWALKS, PARKWAYS, CROSS -SLOPES, CURB & GUTTER, MEDIANS, ETC. C. ADEQUATE SIGHT DISTANCES, ADEQUATE STOPPING DISTANCES, RADII OF CURVES, ADEQUATE LONGITUDINAL SLOPES, ADEQUATE VERTICAL CURVES, TAPER LENGTHS, RIGHT -TURN LANES, ETC. YOU WILL NEED TO INCORPORATE THE DESIGN CURRENTLY BE PERFORMED BY THE SEAR -BROWN GROUP (ROB HUME) FOR THE AFFORDABLE HOUSING PROJECT TO THE SOUTH AND/OR TAKE THE INITIATIVE TO DESIGN THE PORTION OF LINCOLN-AVENUE ALONG THE FRONTAGE OF THE DIAMOND SHAMROCK PROPERTY AS WELL AS 1000 FEET NORTH AND SOUTH OF THIS PROJECT. WE WILL NEED TO SEE THE PROPOSED SOUTH FLOWLINE ALONG LINCOLN AVENUE TO COMPARE IT TO THE PLACEMENT OF THE NORTH FLOWLINE. THE SAME REQUIREMENTS THAT WERE STATED ABOVE FOR THE DESIGN OF LEMAY AVENUE APPLY TO THE DESIGN OF LINCOLN AVENUE AS WELL. THE PRIVATE ACCESS, MEDIAN, AND TAPER ALONG LINCOLN AVENUE WILL NEED TO BE REDESIGNED SO THAT A TANKER TRUCK WILL BE ABLE TO ENTER THE SITE. CURRENTLY THIS CANNOT HAPPEN EFFECTIVELY. • THIS IS THE SECOND TIME THE ENGINEERING DEPARTMENT HAS NOTIFIED YOU OF THESE REQUIREMENTS AND THEY HAVE NOT BEEN ADDRESSED. THIS IS A REQUIREMENT THAT NEEDS TO BE ACCOMMODATED BEFORE THIS PROJECT CAN PROCEED TO THE PLANNING AND ZONING BOARD. THEREFORE, WE ARE ASKING YOU TO NOT RESUBMIT YOUR UTILITY PLANS UNTIL YOU HAVE ADDRESSED, THESE ISSUES. OTHER COMMENTS: • You.wili need to redesign the vertical curves along the north flowline of Lincoln Avenue. Currently they do not meet the minimum requirements for an arterial street, per City standards. • Provide "k" values for all of the vertical curves. • Show a typical cross-section of both Lincoln Avenue and Lemay Avenue. • See sheet number 4 for additional comments and concerns. • We will need to see the proposed south flowline of Lincoln Avenue, not the edge of asphalt. You can label it by saying that it will be constructed by others, however, we need to know that the north flowline is placed in the correct location with respect to the south flowline. Sheet 5 of 10: Lincoln Avenue Profiles and Cross -sections Label all grade breaks with stations and elevations. See sheet number 5 for additional comments and concerns. DATE: September 25, 1997 DEPT: Engineering, PROJECT: #40-94E Lincoln East Convenience Center P.U.D. - (LDGS).Final PLANNER:. Mike Ludwig All comments must be recieved no later than the staff review meeting: Wednesday, Octoberf,1997 15, - MAJORISSUES YOU WILL NEED TO INCORPORATE THE DESIGN CURRENTLY BEING PERFORMED BY THE SEAR -BROWN GROUP (ROB HUME) FOR THE AFFORDABLE HOUSING PROJECT TO THE SOUTH AND/OR TAKE THE INITIATIVE TO DESIGN THE PORTION OF LEMAY AVENUE ALONG THE FRONTAGE OF THE DIAMOND SHAMROCK PROPERTY AS WELL AS 1000 FEET NORTH AND SOUTH OF THIS PROJECT. REFER TO THE DESIGN CONSTRUCTION CRITERIA, STANDARDS. AND SPECIFICATIONS FOR STREETS, SIDEWALKS, ALLEYS AND OTHER PUBLIC WAYS MANUAL. THIS DESIGN SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING: a. PLAN AND PROFILES FOR THE WEST FLOWLINE, EAST FLOWLINE, AND CENTERLINE. Comments continued on next page lar Date: io CHECI; HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS n Pkt x Sh _ Dlai * Report L Od a x Utility x Rd= Utley ,c Lands* To AW co,rtina.i7� 11. Please check the capacity of the inlet and storm sewer draining basin OS-3. RESPONSE: Please refer to the redlined plans and report for additional review comments. 3. The trench drains from the car wash should not drain to the storm sewer. The drainage from the car wash should drain to the sanitary sewer. RESPONSE: 4. Off -site grading easements may be necessary for the proposed grading on the north and east sides of the site. Also, a grading easement is needed for the proposed grading of the ditch at the southeast corner of the site unless the ditch is within the right-of-way. RESPONSE: 5. Please show property lines, existing easements and R.O.W.'s on the drainage plan. RESPONSE: 6. It appears that the east half of the access road from Lincoln will not be detained. Please adjust grading to allow this area to be detained. RESPONSE: 7. Please calculate the 1007year hydraulic grade line for the proposed storm sewer under Lincoln. Please show the HGL on the profile. Will the HGL in the pipe effect the operation of the detention pond. RESPONSE: 8. Please note that Diamond Shamrock will be responsible for constructing the outfall to the existing channel, if the San Cristo outfall is not yet constructed. RESPONSE: 9. The north half of the north access road is shown to drain off -site. Please direct this drainage to the detention pond. RESPONSE: 10. Please verify the profile of the San Cristo outfall storm sewer with the approved San Cristo plans. The proposed profiles should match the profile shown on the approved plans. RESPONSE: REVISION SEP 26 B97 COMMENT S HEE' DATE:. September 25; 1997 DEPT: Stormwater PROJECT: #40-94E Lincoln East Convenience Center P.U.D. - (LDGS) Final PLANNER: Mike Ludwig . All comments must be recieved no later than the staff review meeting: Wednesday, October 8,1997 1. City regulations specify no critical facilities, including gas stations, are allowed in the 500-year floodplain. A variance from this criteria is needed and must be approved by the Water Utilities Board. Please contact Marsha Hilmes-Floodplain Administrator regarding the variance request. This comment was made previously but was not addressed. RESPONSE: I Please verify that the future upstream portion of the storm sewer under Lemay will be able to tie in with the proposed storm sewer profile and alignment. A profile of the future upstream portion of the storm sewer is needed to verify the proposed profile and alignment. RESPONSE: Date: C -r,,. R/9 n -rofd Mj )To Iuclui5 CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONSRpI �i City of Fort Collins Uh1itY y DATE: September 25, 1997 DEPT: Mapping PROJECT: #40-94E Lincoln East Convenience Center P.U.D. - (LDGS) Final PLANNER: Mike Ludwig All comments must be recieved no later than the staff review meeting: Wednesday, October 8,1997 N 4.w� � �. `�� e. ` j i �" � e i 5 C� i �e re +ti � � ro vv. v� y +-+1 e � '•�. Z. �y�f7B5ea] 30, Ji�q. c'asehe�� ort %1�iS 1PIq-1 .: �oe5 06+ 111a�o� 1;%4L [duioSed -460,,J6 7(46- roc- WaC'ePTzo,./ ILIC'S of -r64CY rjFFs1rr:r- &14SL3'1-1e-ti--j �. %/-fcrr WI?OJ4 S2Ccrloa /S C4 6e-L-0 vcll L�6,q-4,. Date: Signatllie: C LuSCT v CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ PId _ Sk _ Dna * Report -Oda _ UWAy _ Rcd]z Ugly _Lands* City of Fort Collins DATE: October 13, 1997 DEPT: Water/Wastewater , PROJECT: #40-94E Lincoln East Convenience Center PUD - Final(LDGS) PLANNER: Mike Ludwig All comments must be received no later than the staff review meeting: Wednesday, October 13, 1997 . -Provide detail for Concrete joint encasement. -Label all fittings,, valves and define methods of deflections. Maintain 10' separation between sanitary sewer service and fuel tanks. -Show and label sanitary sewer main/manhole in Lincoln Ave. improvement plan view. Include note to adjust existing manhole to finish grade. -Provide detail of water main lowering detail. -See overall utility and landscape plans for other comments. Date: )( 7%i' le-37 Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS X Plat _ Site _ Drainage Report _Other X Utility X Redline Utility X Landscape City of Fort Collins Tree "Potection Specifications. The followinE to protection specifications lI shou._. followed to the maximum extent v ')le for all projects with protecteu existing trees. (1) Within the drip line of any protected existing tree, there shall be no cut or fill over a four inch (4") depth unless a qualified arborist or forester has evaluated and approved the disturbance. (2) All protected existing trees shall be pruned to the City of Fort Collins . Forestry standards. (3) Prior to and during construction, barriers shall be erected around all protected existing trees with such barriers to be of orange fencing a minimum of 4' height, secured with metal t-posts, no closer than six (6) feet from the trunk or one-half (%2) of the drip line, whichever is greater. There shall be no storage or movement of equipment, material, debris, or fill within the fenced tree protection zone. (4) During the construction stage of development, the applicant shall prevent the cleaning of equipment or material or the storage and disposal of waste material such as paints, oils, solvents, asphalt, concrete, motor oil or any othermaterial harmful to the life of a tree within the drip line of any protected tree or group of trees. (5) No damaging attachment, wires, signs, or permits maybe fastened to any protected tree. (6) Large property areas containing protected trees and separated from construction or land clearing areas, road rights -of -way and utility easements may be "ribboned off," rather than erecting protective fencing around each tree as required in subsection (G)(3) above. This may be accomplished by placing metal t-post stakes a maximum of fifty (50) feet apart and tying ribbon or rope from stake -to -stake along the outside perimeters of such areas being cleared. (7) The installation of utilities, irrigation lines, or any underground fixture requiring excavation deeper than six inches shall be accomplished by boring under the root system of protected existing trees at a minimum depth of 24 inches. The auger distance is . established from the face of the tree (outer bark) and is scaled from tree diameter at breast height as described in the chart below. Tree Diameter at Breast Height (inches) Auger Distance From Face of Tree (feet) 0-2 1 3- 2 5-9 5 10-14 10 15-19 12 Over 19 15 AA TREE PRESERVATION WORKSHOP HortScience, Inc. ASCA, Rocky Mountain Chapter ISA June 22, 1995 Table II-1: Guidelines for adequate tree preservation zones for trees. Distances should be increased for trees of poor vigor. s Q SPECIES ° v fi •. TOLERANCE TO IMPACTS S r Good � n j J f �u 2 III TREE AGE Young <I/4 life expectancy Mature 114-314 life expectancy Overmature >314 life expectancy Moderate Young Mature . Overmature Poor Young Mature Overmature y- e ,,,, �A I e• - LL Page II - 8 DISTANCE FROM TRUNK feettin. trunk diameter 0.5' 0.75' 1.0' 0.75' 1.0' 1.25' 1.0' 1.25' 1.5' 4?c.z :2 Y S 7. Comments and relined plans from the Mapping Department are attached. Please return redlined plans to Mike Ludwig at Current Planning with plan revisions. Please contact me at 221-6206 for the number of folded revisions required for each document prior to the submittal of plan revisions or if you have any questions or concerns related to these comments. Sincerely, Michael Ludwig, AICP City Planner xc: Tim Blandford, Engineering Stormwater Utility file/Project Planner diameter required for tree preservation zones and tree protection specifications. Please provide the existing ground elevation at the base of the trees to be preserved on the Site Plan and Utility (grading) plans to facilitate staff review. e. Please make sure that the lighting reveal under the edge of the canopy is painted, not illuminated. f. Please return all redlined plan sets with plan revisions. 2. Public Service Company offered the following comments: a. The easement along Lemay Avenue needs to be shown as 15 feet on the plat. b. The majority of the proposed gas mains and / or services will be located in asphalt areas, since this is where most of the easements are located. C. There are potential conflicts with trees in easements along E. Lincoln and the proposed gas main. 3. The Zoning Department offers the following comments: a. Please add a general note to the Site Plan that all exterior building lighting will be down -directional, sharp -cut off, high pressure sodium luminaries. b. Please show a curb ramp for the handicap parking space. c. Please clarify the building envelope. Label and dimension the building envelope and the distance from, the building envelope to the property line. Please dimension the buildings and canopies on the site plan, not in the schedule. d. The property.is located within the neighborhood sign district. Please remove all signs from the plans and show sign blocks for all wall mounted signs on the elevations. 4. Comments and redlined plans from the Engineering Department are attached. Please return redlined plans to Mike Ludwig at Current Planning with plan revisions. 5. Comments and redlined plans/reports from the Stormwater Utility are attached. Please return redlined plans/reports to Mike Ludwig at Current Planning with plan revisions. 6. Comments and redlined plans from the Water and Wastewater Utility are attached. Please return redlined plans to Mike Ludwig at Current Planning with plan revisions. Commui. Planning and Environmental ., iices Current Planning City of Fort Collins October 30, 1997 Diamond Shamrock Refining and Marketing c/o Carl Schmidtlein Galloway, Romero & Associates 5350 DTC Parkway Englewood, CO 80111 Dear Carl, Staff has reviewed your revisions for the Lincoln East PUD, First Filing (Diamond Shamrock) Final that were submitted on September 25, 1997, and would like to offer the following comments: The Current Planning Department offers the following comments: a. As previously discussed on the phone and in various meetings,. the review of the Lincoln East PUD revisions has been on hold, pending the resolution . of an agreement between Diamond Shamrock and adjacent property owners for the design of arterial street improvements. It is the Current Planning Department's understanding that an agreement has been reached and the design for the arterial street improvements for Lemay Avenue and Lincoln Avenue will be submitted in approximately 4 to 5 weeks. Staff is forwarding comments which are based upon the September 25, 1997 submittal only. Additional comments may, be forthcoming once the arterial street improvement plans have been reviewed. Additional revisions to the Diamond Shamrock proposal may be necessary. No further review of any additional plan revision submittal(s) will occur until the arterial street improvement plans have been submitted and reviewed. A Planning and Zoning Board hearing will not be scheduled until all comments are addressed. b. The proposed bike rack locations and ice machine impede pedestrian circulation. Please relocate. C. Please designate the specific color of the plastic inserts on the trash. enclosure gates. d. The Landscape -Plan indicates that tree rings will be provided to preserve the existing grade at the base of a couple of existing trees. Please see the attached. information from the City Forester concerning the minimum 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 take this application to the Planning and Zoning Board for their review on May 21, 1998.. Based on the information currently in our files, staff will be recommending that the Board deny this application. Any further application on this property will be required to apply under the City's Land Use Code. If you have been actively pursuing this submittal, please contact me. In order to keep this project active, documentation of your efforts since you received the City's comment letter will be needed. Likewise, should you have any questions regarding this notification, please contact me. Sincerely, Robert E. Blanchard Current Planning Director cc: Mike Ludwig, City Planner doonnae tle"ImAr a Commu. f Planning and Environmental, vices Current Planning City of Fort Collins Webster Associates 60 E. Service Road 1-25 Cheyenne, Wyo 82007 Dear Mr. Webster: March 25, 1998 On January 8, 1997, the -City Council enacted Ordinance 161, 1996, commonly called the Transition Ordinance. This Ordinance provided for the review and processing of land use. applications under the regulations in effect at that time (Land Development Guidance System, subdivision regulations, special site plan review) during the transition period until the adoption of the Land Use Code and established a temporary delay in the acceptance of new applications. Ordinance 161, 1996 established two deadlines for the acceptance of applications that would continue to be reviewed under the LDGS: 1. January 18, 1997. After the effective date of Ordinance 161, 19969 (January 18, 1997) only specifically exempted applications would be permitted. Until that deadline, applicants could submit either preliminary or final development applications and have them reviewed under the regulations in..effect at that time (Section 6, Ordinance 161, 1996); and, 2. July 17, 1997. As of July 17, 1997 or six months after the date of approval (whichever was later), all preliminary subdivision plats and PUDs would expire unless a completed application for final approval had been filed. In addition, the Ordinance allowed for the continued processing of applications already in the process. The clear intent of this Ordinance was to provide a reasonable transition time in which valid development projects could continue to be processed under prior regulations rather than being reviewed under newly adopted regulations. Our records indicate that you submitted a Final PUD application on April 29, 1997 for the Lincoln East Convenience Center PUD, 1 st Filing. City staff reviewed the submittal and provided initial comments on June 4, 1998. Since that time, revisions have not been submitted to indicate this is an active project. Because of this lack of activity and any other clear indication that you are actively pursuing this project, staff intends to 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 Apr-23-98 09:07A P_02 M - --fr It is Mr. Schrader's full intention to meet with Mr. Summers during the week of April 27"h to discuss the remaining planning issues and reach a solution. Given the information contained in the letter submitted to you on April 2, 1998 by Mr. Hauser and the timeline presented here,l respectfully request that this matter not be referred to the May 21, 1998 Planning and Zoning board for denial and, instead, that we be allowed to continue the review process under the approved preliminary P. U.D.. should you have further questions regarding this projector if I can provide any additional needed information, please feel free to call. Sincerely,, ( p PCS6- s r 4"-J6�C! Donald Shields Jr. Project Manager Wickham Gustafson, Architects CC". Larry Stroud; Miscio & Stroud Mike Ludwig; staff Planner Jerry Summeers; Summers Auto Repair Steve Schrader; Schrader Oil Co. Alan Hauser, Architecture One, P.C. Apr-23-98 09:07A P-01 WICK. HA / GUS ARSON LAWRENCE A. WICKHAM ROBERT J. GUSTAFSON DONALD G. SHIELDS A R C H I T E C T S 1730 SOUTH COLLEGE AVENUE SUITE 202 (970) 493-2025 FORT COLLINS. COLORADO 80525 FAX (970) 493-2026 April 22, 1999 Mr. Bob Blanchard Current Planning Director City of Fort Collins 281 N. College Ave. Fort Collins, CO 80522 RE: Final P.U.D. Application: Schrader's Country Store, Lot 1, Lincoln East Convenience Center P.U.D., a Filing Dear Mr. Blanchard: In regards to your letter dated March 20, 1999 and a letter you received from Alan Hauser of Architecture One dated April 2, 1998, I would like to further petition that you allow the continuation of the submittal and review process relative to this P.U.D.. Mr. Schrader has been diligent in pursuing this development since acquiring the property on March 5, 1998. In addition to the information stated in Mr. Hauser's letter, I would offer the following time line as evidence of our diligence. November 26, 1997 The Websters offer to buy the diamond Shamrock plans from Galloway Romero. December 1, 1997 Diamond Shamrock rejects the offer from the Websters. January 13, 1998 A contract was presented to the Schraders by the Websters. February 5 The Websters presented a counter -proposal to the Schraders. February 25 The Schraders present a new contract to the Websters. March 5 The Websters sign a contract with the Schraders. March 18 The Schraders meet with Mr. Jerry Summers to discuss joint planning to proceed with the P.U.D. March 21 - April 21 Mr. Summers was out of the country and could not be consulted on further planning issues. April 21 - April 28 Mr. Schrader is out of town. Commui. Planning and Environmentalvices Current Planning City of Fort Collins Donald Schields Jr. Wickham Gustafson Architects 1730 South College Ave Fort Collins, CO 80525 Dear Don: May 12, 1998 On March 20, 1998 you were sent a letter requesting documentation that you were actively pursuing the Lincoln East Convenience Center, Lot 1, Schraders Country Store. I have reviewed your response with other development review staff and determined that there has not been sufficient activity related to this project. Therefore, we will be taking this project to the Planning and Zoning Board with a recommendation of denial. Note that the Board meeting is scheduled for June 4, 1998, not May 21, 1998 as indicated in the original letter. Should you desire, you will have the opportunity to address the Board to explain the status of this project. As with any Planning and Zoning Board decision, you have the ability to appeal their decision to the City Council. Should you have any questions regarding this process, please contact me at (970)221-6750. Sincerely, 71A731"J") Robert E. Blanchard Current Planning Director cc: Mike Ludwig d0cMgebldld982Jtr 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 SCHEDULE Qrs—Yidn�luas eawv ewn.,l ®„av�ar Qi rw.c,W,• iv e4v mean e.a u u l.Y a u, IN LOT 3 I I I I L_ FRIEuM ►WARY PUD L` OL)-r LEGAL DESCRIPTION: sr m .oau��.a.mtd7.'a va�f°v-ni,n.l,r0 �'. m�i ut�E,F ®y,ve rym• v. wyen,.r uuanv ®LaJf v. aavu, uu..HI ,m v. Yn 1_n ew.a.�,I<m,4B.a „®m® Pri ®'mrY s,m'm. aoau,uw.v. nnY lmn 0°®aka —an„ �M vvYr mares ®u rtw 1.,r.%iY o.roir. r-r eawum rupm ami¢v—av 0 a�—ew �'Y aa„a a>-Yrs—emr. ®famu.0 n p. Nr1 Y4 RAISED CONCRETE SIDEWALK SECTION NOTES: ®mnma .0 s s ov"im°:.ww M mr •7wi sr.�`.n vm, LAND USE TABLE: m�.r. all ur ... --A . ,. mi.°.'Rrw anv.mi— - Wv uwr a p�jp.Cnn A.YPT DETAIL °OEM ATTORNEYS TIFlCATIONt o- PLANNING & ZONING BOARD CERTIMCATION: m .... M TRASH ENCLOSURE OWNER'S CERTIFlCATION: MC CINI` MAP 4 Diamond Shamrock SITE PLAN SHEET 1 of 5 I OUT I I W Z W Q W J O Z • ■ rA C" O T Link-N-Greene • Golf Course C CCR VICINITY MAP #40-94E N Lincoln East Convenience Center, LOT 1 Final ILDGSI 1r•=300• -___ H i11im %h K1 Lincoln East Convenience Center PUD, Lot 1, Final, #40-94E June 4, 1998 P&Z Meeting Page 5 4. Transportation: The proposed traffic volumes generated are acceptable and were accounted for in the traffic study that was approved with the Lincoln East PUD Overall Development Plan. The proposed use on Lot 2 will generate approximately 1,570 average daily vehicle trips. Parking ratios are acceptable for the proposed use. 5. Utility Plans: Comments from the Engineering Department, Stormwater Utility, Water and Wastewater Utility and Mapping Department were attached to the October 30, 1997 comment letter. These comments specifically requested revisions to the plans for arterial street improvements, revisions to the water utility drawings, additional information needed on the Plat, the need for off -site easements, and the need for a variance from the Water Utilities Board to locate a critical facility in the 500-year floodplain. Without revisions addressing each of these comments, compliance with Engineering Criteria A-3.2 Design Standards cannot be determined. 6. Status of Submittal: In the April 22, 1998 response letter, the applicant outlines the process by which Schrader's Country Store replaced Diamond Shamrock as the developer of the proposed PUD. The Director of Planning determined that site acquisition did not constitute activity as no further resolution of the development review issues has occurred. FINDINGS OF FACT/CONCLUSION: 1. The Lincoln East Convenience Center PUD, Lot 1, Final, #40-94E complies with the uses designated on Parcel A of the Lincoln East PUD Overall Development Plan. 2. The Lincoln East Convenience Center PUD, Lot 1, Final, #40-94E cannot be considered in substantial compliance with the approved Lincoln East Convenience Center PUD, Preliminary, #40-94D. 3. The Lincoln East Convenience Center PUD, Lot 1, Final, #40-94E does not meet all applicable All -Development Criteria of the LDGS, specifically Neighborhood Compatibility Criteria A-2.3 Architecture, A-2.6 Pedestrian Circulation, A-2.13 Landscaping and Engineering Criteria A-3.2 Design Standards. RECOMMENDATION: Denial of the Lincoln East Convenience Center PUD, Lot 1, Final, #40-94E. Lincoln East Convenience Center PUD, Lot 1, Final, #40-94E June 4, 1998 P&Z Meeting Page 4 Staff requested in the October 30, 1997 comment letter, that the proposed bike racks and ice machine be relocated so as not to impede pedestrian circulation. Without revisions addressing these comments, compliance with All Development Criteria A-2.6 Pedestrian Circulation cannot be determined. Architecture: The convenience store will have a pitched roof with a maximum height of approximately 23 feet. The convenience store will be constructed of a grey -tone, fluted block with light - grey tone rockface block accents at the corners. Synthetic white stucco will be used for an accent band below the roof line. The roof will be constructed with a dark gray standing seam metal. The automated car wash building will also have a pitched roof with a maximum height of approximately 23 feet. Building materials and colors will be identical to the convenience store. The fuel dispenser island canopy is split into two sections. The section on the north side of the building measures 40' x 50 feet. The section on the south side of the building also measures 40' x 50 feet but includes the potential for a 27' x 50 expansion for the potential future addition of 2 more fuel pumps. Both sections of the canopy will have a maximum height of approximately 20 feet and be constructed of a dark gray metal canopy facia to match the roof of the convenience store. Canopy lighting will be fully recessed. The support columns will be wrapped with light gray rock face block and synthetic stucco. Staff requested, in the October 30, 1997 comment letter, additional details for the trash enclosure. Without revisions addressing these comments, compliance with All Development Criteria A-2.3 Architecture cannot be determined. Landscaping: The landscape plan consists of deciduous street trees, ornamental and evergreen trees, and deciduous and evergreen shrubs around the perimeter of the site. Raised, patterned, pedestrian crossings are provided in various locations to mitigate pedestrian/vehicle conflicts. Picnic tables are provided in a significant landscaped area at the corner of Lemay and Lincoln Avenues. Staff requested, in the October 30, 1997 comment letter, additional documentation regarding the preservation of existing trees on the site. Without revisions addressing these comments, compliance with All Development Criteria A-2.13 Landscaping cannot be determined. Lincoln East Convenience Center PUD, Lot 1, Final, #40-94E June 4, 1998 P&Z Meeting Page 3 PUD only covered Parcels A and B of the Lincoln East Overall Development Plan. All other portions of the ODP expired on March 28, 1997 pursuant to Ordinance No. 161, 1996. If this Final PUD application is denied, the Preliminary PUD approval on Lot 1 and the ODP approval on Parcel A will expire pursuant to Ordinance No. 161, 1996. 2. Land Use: This is a Final PUD request for a 2,880 square foot gas station / convenience store and car wash on approximately 1.413 acres known as Lot 1 of the Lincoln East Convenience Center PUD. The property is zoned I, Industrial. A. Overall Development Plan The request is consistent with the uses designated for Parcel A of the Lincoln East PUD Overall Development Plan. B. Preliminary PUD On March 24, 1997 the Planning and Zoning Board approved the Lincoln East Convenience Center PUD, Preliminary, #40-94D by a vote of 5-0. Lot 1 was granted Preliminary PUD approval for a 2,880 square foot gas station / convenience store and car wash. However, substantial compliance with the approved Preliminary cannot be determined until issues related to the All -Development Criteria are addressed. C. All -Development Criteria This Final PUD request does not meet all applicable All -Development Criteria of the Land Development Guidance System. See comments below under layout, architecture, landscaping, and utility plans. 3. Design: Layout: This request proposes a layout which places the 1808 square foot convenience store at the center of the Lot 1 with a split canopy for two pumps on each side of the store. A car - wash is located along the northern edge of Lot 1. Access to Lot 1 is gained via two proposed internal private drives; one from Lemay Avenue, the other from Lincoln Avenue. These private drives will also serve remaining undeveloped parcels. Raised, patterned concrete walkways mitigate points of pedestrian/vehicle conflict. Lincoln East Convenience Center PUD, Lot 1, Final, #40-94E June 4, 1998 P&Z Meeting Page 2 COMMENTS Background: On January 8, 1997, the City Council enacted Ordinance 161, 1996, commonly called the Transition Ordinance. This Ordinance provided for the review and processing of land use applications under the regulations in effect at that time (Land Development Guidance System, subdivision regulations, special site plan review) during the transition period until the adoption of the Land Use Code and established a temporary delay in the acceptance of new applications. The clear intent of this Ordinance was to provide a reasonable transition time in which valid development projects could continue to be processed under prior regulations rather than being reviewed under newly adopted regulations. On March 20, 1998, letters were sent to all inactive PUDs that were in the development review process noting that there had been no activity on these projects since staff comments on the most recent submittal had been mailed (attached). In this instance, inactivity was defined as not submitting revised plans in response to the City's revision comment letter. The applicant responded to the March 20, 1998 with a letter documenting activity related to the development application. After reviewing the applicant's documentation, the Director of Current Planning determined that there had not been sufficient activity related to the project. The applicant was notified on May 12, 1998 that the staff is presenting this project to the Board for review based on the information provided in the initial submittal. The surrounding zoning and land uses on the CityPlan zoning map are as follows N: OUT & RL; an undeveloped, unincorporated parcel and undeveloped Fort Collins Business Center land; San Cristo Subdivision. S: C; vacant/undeveloped (proposed Mulberry Lemay Crossing ODP). E: I & OUT; undeveloped remainder of Lincoln East ODP; undeveloped Fort Collins Business Center. W: 1; North Lemay (industrial) Subdivision, Second Filing (partially developed). This subject property was annexed into the City as part of the East Lincoln Third Annexation and Zoning on December 6, 1994. On October 28, 1996 the Planning and Zoning Board approved the Lincoln East PUD Overall Development Plan by a vote of 6-0. The Lincoln East Convenience Center PUD, Preliminary, #40-94D was approved on March 24, 1997 by a vote of 5-0. The Preliminary ITEM NO. 10 MEETING DATE 6/4/98 STAFF Mike Ludwig/Bob 131i Citv of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: Lincoln East Convenience Center PUD, Lot 1, Final, #40-94E. APPLICANT: Don Shields Jr. Wickham Gustafson Architects 1730 South College Avenue Fort Collins, CO 80525 OWNER: Webster Associates 60 East Service Road 1-25 Cheyenne, WY 82007 PROJECT DESCRIPTION: This is a Final PUD request for a 2,880 square foot gas station / convenience store and car wash on approximately 1.413 acres known as Lot 1 of the Lincoln East Convenience Center PUD. The property is zoned I, Industrial. RECOMMENDATION: Denial. EXECUTIVE SUMMARY: This project has been inactive since staff comments on the revision submittal were sent on October 30, 1997. Because of this inactivity and any other indication that the applicant is actively pursuing the project, the Planning and Zoning Board is being asked to review this project based on the information currently available. This request for Final P.U.D. approval: complies with the uses designated on Parcel A of the Lincoln East PUD Overall Development Plan; • cannot be considered in substantial compliance with the approved Lincoln East Convenience Center PUD, Preliminary, #40-94D. • does not meet all applicable All -Development Criteria of the LDGS, specifically Neighborhood Compatibility Criteria A-2.3 Architecture, A-2.6 Pedestrian Circulation, A-2.13 Landscaping and Engineering Criteria A-3.2 Design Standards. and COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281N.College Ave- P.O. Box580 Fort Collins, CO80522-0580 (970)221-6750 PLANNING DEPARTMENT