HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, DALE'S CARPET ONE - PDP - 43-94K - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS1. The report indicates that the WQ pond is to be excavated as an initial step in overlot grading and then utilized
as a sediment trap. Please so indicate on the plan.
WE 14DD6B N0TG TO S/fGETs 3 64-.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility Plans
Number: 20 Created: 12/15/2003
u+21Z4/04] Why is the existing curb stop beingg relocated? Provide a detail of the relocation procedures for the existing
curb stop. WE WILL- A70-r ICeLOo4-rG /t/z J6JeVJca
Maintain a 10-foot minimum separation between the water/sewer lines and light poles, entry signs, etc.
Correctly show and label all existing water and sewer lines within this site as well as adjacent to this site (see attached
utility plans for adjacent development).
[12/15/03] Provide all appropriate City of Fort Collins standard details.
Number: 21
[2/24/04]
Created: 12/15/2003
[2/181041 Building is still more than 15' from Automation. I don't believe the "future expansion" being shown to the
build -to -line complies, but this is OK if project,planner determines that one of the exceptions is met.
[12/4/03] Build to line standard on corner lot requires compliance with Sec. 3.5.3(B)(1)(a) to (C), which requires
(V. S Frre K setback of between 10' and 25' from Horselooth lot fine, and a maximum setback of 15' from Automation lot line. The
Horsetooth setback is ok, but the Automation is not.
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 2 Created: 12/4/2003
W. S• FRrfk 12/18/041 Building is still more than 15' from Automation. I don't believe the "future expansion" being shown to the
build -to -line complies.
(12/4103] Build to line standard on corner lot requires compliance with Sec. 3.5.3(B)(1)(a) to (C), which requires
setback of between 10' and 25' from Horsetooth lot line, and a maximum setback of 15' from Automation lot line. The
Horsetooth setback is ok, but the Automation is not.
The project has been scheduled for consideration by the Planning and Zoning Board for
March 18, 2004. Final Compliance may be submitted after the Planning and Zoning Board.
Redline drawings area available at the Current Planning front desk. Be sure and return all of
your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Bob Barkeen
City Planner
Page 3
Department: Light & Power
Topic: Light & Power
Number: 6
[2/18/04)
Issue Contact: Doug Martine
Created: 12/9/2003
[12/9103] Developer will need to coordinate power requirements, transformer location, and electric development
charges with Light & Power Engineering (970)221-6700.
Department: PFA
Topic: General
Number: 30
[3/2/04]
Issue Contact: Michael Chavez
Created: 12/16/2003
ADDRESS NUMERALS:
(V• S Fit'* Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6-inch numerals
on a contrasting background. (Bronze numerals on brown brick are not acceptable). 1997 UFC 901.4.4
Number: 31
[3/2/04]
Created: 12/16/2003
qtZ/16/03] WATER SUPPLY: Commercial
No commercial building can be greater then 300 feet from a fire hydrant.
Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be
capa�,H E L= 1np 14 ggallons of water per minute 7at a V residual
Goerwie2 OF Ho jEs6rov�+1.2.2.2
rS wo-rt4lAi 3 O� Cee HYDRA DF SvrzDrNG £ Auro�+.arioN wasc#
Number: 32 Created: 12/16/2003
(312/04)
�[a-Pt16/03] SPRINKLER REQUIREMENTS:
This proposed building exceeds 5000 square feet for type V construction and must be fire contained or fire
sprinklered. Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new building
equipped with a required fire sprin k/Q system or fire alarm system. 1997 UBC Table 9B; 1997 UFC 902.4; PFA
POLICY88-20 WO - R 4 r-ie6L.nr6 Sru6 Svro P-<ope ery
Number: 44 Created: 2/26/2004
[2/26/04] Previous comments dated 12-16-03 still pertain.
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 42 Created: 2/23/2004
[2/23/04] Same issues from 12/17/03
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
limber: 45 Created: 3/1/2004
Please change water quality outlet pipe to at least a 12-inch. See redlined plans. W E c oAw� *D, pr pg To 1 Z"
Number: 46 Created: 3/1/2004
Please add size and type to existing storm sewer on drainage and grading plan.
,,.—PdU mbe r: 47 Created: 3/1/2004
Please see other minor comments on redlined plans and report.
Topic: Erosion Control
Number: 48 Created: 3/1/2004
Page 2
+„ STAFF PROJECT REVIEW
Cih'nf Purl Collins
W.J. FRICK DESIGN GROUP Date: 03/02/2004
C/O BUD FRICK
526 S. COLLEGE AVE.
FT. COLLINS, CO 80524
Staff has reviewed your submittal for HORSETOOTH EAST BUSINESS PARK, DALE'S
CARPET ONE PDP - TYPE II, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Bob Barkeen
Topic: Erosion Control
Number: 49 Created: 3/2/2004
W. T. Frni.k. [3/2/04] A modification will need to be sought for the setback along automation Way. This setback does not meet the
build to standards within Section 3.5.3 of the LUC.
Number: 50 Created: 3/2/2004
T. Fr,�.1<[3/2/04] Screening of the loading area. Evergreen Trees will need to be planted adjacent to the loading area (south of
the trash enclosure) to provide screening from Automation Way.
Number: 51 Created: 3/2/2004
WZ I^nck [3/2/04] There is a landscape gap along Automation Way. Additional trees should be incorporated in this area to fill in
the gap.
Department: Engineering Issue Contact: Katie Moore
Topic: General
.4-M tu ber: 14 Created: 12/10/2003
[2/17/04] Please also see redlined utility plan checklist for additional comments.
[12110/031 Please see redlines for any additional comments.
,Ntfmber: 41 Created: 2/17/2004
(2/17/04] It appears that some construction of curb and gutter and pavement is proposed on the property to the east.
An offsite easement will be needed for this. Please provide a letter of intent from the adjacent property owner for the
easement prior to publ`c hearing, and the act1 al eas$ement with final compli nge. W C. G i%&-L y cc! 44e, Cis r b
So -f 4&+ Wt did no+ floe *a, do dwy A+lac. Rife, A•.l Proroariy
W.-S. Number: 43 Created: 2/24/2004
[2/24/04] The quality of the site and landscape plans needs to be brought up to standards. Some of the printing is very
difficult to read, and having so much information on a plan this size makes the information difficult to decipher. Please
simplify the plans or increase the scale at which they are shown.
L--Topic: Plat
Number: 8 Created: 12/10/2003
12/17/04] Repeat
[12110/031 Please include the reception num¢¢ers of all eas@ments/ROW previously dedicated.
We- hove- %a(cie.1 t1je. ree_ee 2ro n«.•.bivsfor g eriJssiiitJ.
Lfvpic: Utility Plans
Number: 11 Created: 12/10/2003
[2/17/041 Repeat
[12/10/03] Please clearly show, label and dimension all property lines/ROW, and easements. Also, please dimension
the existing sidewalks and the proposed driveway width. ''' h 1 f h&1 d eeti s1 v"a.
Page I