HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, DALE'S CARPET ONE - PDP - 43-94K - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: 6r5cip6 f H �. s. PIS— pa I�'s Cam f Dry
Planner: 5b�o ?�t�y1w TrafTicOperations:
Engineer: i'-e� M �
Date: I z- 17. ° 3
Items Requested
Site land Plat Ublity I Drainage R t Other Items Required
Redlined Items Being Returned
Site land Plat Utilily Drainage R t Other Items Being Returned
Engineering
j
✓
✓
✓
✓
✓:
Nrmwater
Water/Wastewater
TraiicOperations
/
o
Trans. Planning
iransfort
_
Natural Resources
Park Planning
_
Totals
Other:
Note: All redlined items should k returned with the redmittal/ rehsions.
rl
i
Revisions Routing Sheet -
Item: [# 3 k l ki�ne-14 E. 0u7. F�- Dal. is rd:; 17777 o . -_
1�D�at�ey:.� � 12 .17. 03
'u�[t�..t liter • �� ��l�v " � �- � �� �y� �'�''/
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
MAPPING / DRAFTING
FORESTRY
FCLWD/ELCOBOXELDER
FIRE
POLICE
ADVANCE PLAIYNIING
STREETS
R.O.W. PLANNING
WATER CONSERVATION '
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE / THOMPSON
CABLE TV
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
REA/DOE/PRPA
_ 5 3
TOTAL (0 7
Rcr. S-07-97