HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, DALE'S CARPET ONE - PDP - 43-94K - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW7. There should be no need for this as this is a developed lot and there
will be no public improvements. All utility laterals are in place beyond
the property lines.
8. The easement exists, see the site plan
9. The intersections already exist and there are no more planned with
this project.
10. This one doesn't make any sense! We need more explanation and
clarification that it is needed.
11. In a phone conversation with Eric regarding this item, he determined
that due to the limited parking and the traffic generated, that a right
turn lane from Horsetooth to Timberline was not required.
Storm Drainage
1. No comment and see the drainage plan.
2. No comment.
3. See storm drainage plan and report from Stewart & Assoc.
4. OK
5. See storm drainage plan and report from Stewart & Assoc.
6. See storm drainage plan and report from Stewart & Assoc.
Transportation Planning
1. No TIS is required.
2. Bicycle parking is provided near the main entrance.
3. The sidewalk kink has been removed.
Natural Resources
1. The site is void of trees and shrubs. .
2. The trash enclosure has adequate room for recycling and the business
is a leader in the recycling of flooring related materials.
3. There is no fugitive dust associated with this project.
4. See landscape plan and plant list.
Parks and Recreation
1. There are no residential units in this project.
Current Planning
1. OK
2. OK
DALE'S CARPET ONE
Jan. 27, 2003 CONCEPTUAL REVIEW RESPONSE
Zoning:
1. Since the conceptual review date the process for allowing this use in the E
district has been determined by the planning department.
2. See site plan
3. See landscape plan
4. Building height is approximately 33' from grade at the building.
5. See site plan
6. No comment.
7. See site photo metrics plan.
8. See subdivision plat by Stewart & assoc.
Light & Power
1.
No comment.
2.
See site plan.
3.
No comment.
Poudre Fire Authority
1. Fire Hydrant located to the East in the Rite -Aid parking lot.
2. No comment
3. The building will be fire sprinklered.
4. A dedicated fire lane can be established if actually needed.
Water/ Wastewater
1. No comment
2. See landscape plan and OK to the fees.
Engineering
1. No comment
2. No comment
3. The established right-of-ways meet the requirements
4. How can we find this one out?
5. In a phone conversation with Eric regarding this item, he determined
that due to the limited number of parking spaces and the traffic
generated that no traffic study was needed.
6. The existing streets, curb, gutter and sidewalks meet the urban area
street standards.