Introduction
The proposed 1ST CHOICE BANK office and commercial development is to be located
south of Horsetooth Road and east of College Avenue in Fort Collins, Colorado. The 1.8-
acre development will contain an office/commercial building of approximately 24,000
square feet, with 7,000 square feet for the bank, 4,000 square feet of retail/commercial
area and 13,000 square feet of office space.
Leigh, Scott & Cleary, Inc. has been retained by 1ST CHOICE BANK to determine the
traffic impacts of the proposed development on the surrounding roadway system. This
report summarizes the following analysis procedures which were utilized in the
evaluation:
• A review and analysis of present roadway and traffic conditions in the
vicinity of the site and a review of planned and proposed roadway
improvements in the general vicinity.
i A determination of the average weekday and peak -hour vehicle -trip
generation for the proposed development.
• An analysis of the estimated directional distribution of site -generated
traffic and an assignment of that traffic to the adjacent street
network.
• ' A determination of the future traffic volumes in the vicinity of the site.
• An evaluation of the impacts of site -generated traffic expressed in
terms of the developments traffic as an increment of total projected
traffic on the surrounding roadway system and the resulting levels of
service on the adjacent major intersections.
• A determination of appropriate roadway improvements which will
ensure optimum traffic operation for traffic entering and exiting the
' site.
i
A-1
I
I TABLE OF CONTENTS
Section Description Page
A Introduction .........................................
A-1
B Roadway and Traffic Conditions ..........................
B-1
C Traffic Generation .....................................
C-1
D Traffic Distribution
D-1
E Trip Assignment and Traffic Volumes ......................
E-1
F Traffic Impacts .......................................
F-1
G Access Recommendations
G-1
H Conclusions .........................................
H-1
Appendix A: Existing Traffic
Appendix B: Level of Service Calculations
Appendix C: Accident Data
LIST OF ILLUSTRATIONS
Figure Description Page
[! 1
Site Location ........................................
B-2
2
Area Streets and Existing Lane Geometry ...................
B-3
3
1992 Traffic Counts.....................
B-7
4
1995 Peak -Hour Background Traffic Volumes ................
B-9
5
2010 Peak -Hour Background Traffic Volumes ................
B-10
6
Directional Distribution of Site -Generated Traffic ..............
D-2
7
Peak -Hour Site -Generated Traffic
E-2
8
1995 Total Peak -Hour Traffic ............................
E-3
9
2010 Total Peak Hour Traffic ............................
E-4
I 10
Recommended Lane Geometry
F-2
LIST OF TABULATIONS
Table Description Page
1 Summary of 1992 Intersection Levels of Service ............... B-6
2 Estimated Traffic Generation ............................. C-2
3 Summary of 1995 Intersection Levels of Service ............... F-3
4 Summary of Year 2010 Intersection Levels of Service ........... F-4
Traffic Impact Analysis
1ST CHOICE BANK
Fort Collins, Colorado
Prepared for
Mr. John Drennen
1ST CHOICE BANK
4119 Attleboro Court
Fort Collins, CO 80525
Prepared by
Leigh, Scott & Cleary, Inc.
1889 York Street
Denver, CO 80206
(303) 333-1105
June 1, 1994
(LSC #940440)
Traffic Impact $& Analysis
I s t CHOICE BAN
Pt. COM1IS, Colorado
Leigh, Scott & Cleary, Inc.