HomeMy WebLinkAbout1ST CHOICE BANK OF FORT COLLINS (TEMPORARY FACILITY) - MINOR SUBDIVISION - 41-94 - CORRESPONDENCE - MEETING COMMUNICATION (3)an�ov � �anvaan wvvvvaa
io
m
co
L_
Ol
C
m
J
y
0
M
m
o
p1 O
Z x m
o
a � /a
� I I
F
S
W
S
Y.
Q
O
t— I
t
Q
O
I
1
I
I
I
1
1
eee�o3S euel ujnl �edel
i
,Shc ,91E 109t
,039 :416ue1 IB301
I
COLLEGE AVENUE
CAPACITY AND
---------------------------------------------------------------------
LEVEL -OF -SERVICE
Page-3
POTEN-
ACTUAL
FLOW-
TIAL
MOVEMENT
SHARED
RESERVE
RATE
CAPACITY
CAPACITY
CAPACITY
CAPACITY
MOVEMENT
v(pcph)
c (pcph)
c (pcph)
c (pcph)
c = c - v
LOS
-------
p
--------
M
--------- ------------
SH
R SE
------------
---
MINOR STREET
EB LEFT
43
499
491
491
448
A
RIGHT
20
930
930
930
'911
A
MAJOR STREET
NB LEFT
20
769
769
769
750 _
A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... Site Access
NAME OF THE NORTH/SOUTH STREET.... Mitchell Drive
DATE AND TIME OF THE ANALYSIS..... 05-17-1994 ; PM Peak
OTHER INFORMATION.... 2010 Total Traffic
ADJUSTMENT FACTORS Page-2
PERCENT RIGHT TURN
CURB RADIUS
(ft) ACCELERATION LANE
GRADE ANGLE
FOR RIGHT TURNS FOR RIGHT TURNS
EASTBOUND
------- ---------
0.00 90
----------------
20
-----------------
N
WESTBOUND
----- ---
---
-
NORTHBOUND
0.00 90
20
N
SOUTHBOUND
0.00 90
20
N
VEHICLE COMPOSITION
---------------------------------------------------------------------
% SU TRUCKS %
COMBINATION
AND RV'S
VEHICLES
% MOTORCYCLES
EASTBOUND
----------- -------------
4
1
-------------
0
WESTBOUND
---
---
---
NORTHBOUND
4
1
0
SOUTHBOUND
4
1
0
CRITICAL GAPS
---------------------------------------------------------------------
TABULAR VALUES
ADJUSTED
SIGHT DIST. FINAL
(Table 10-2)
VALUE
ADJUSTMENT CRITICAL GAP
MINOR RIGHTS
EB 5.50 5.50 0.00 5.50
MAJOR LEFTS
NB 5.50 5.50 0.00 5.50
MINOR LEFTS
EB 7.00 7.00 0.00 7.00
IDENTIFYING INFORMATION
---------------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... Site Access
NAME OF THE NORTH/SOUTH STREET...'. Mitchell Drive
DATE AND TIME OF THE ANALYSIS..... 05-17-1994 ; PM Peak
OTHER INFORMATION.... 2010 Total Traffic
1985 ECM: UNSIGNALIZED INTERSECTIONS Page-1
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 30
PEARHOUR FACTOR ..................... 1
AREAPOPULATION ...................... 50000
NAME OF THE EAST/WEST STREET......... Site Access
NAME OF THE NORTH/SOUTH STREET....... Mitchell Drive
NAME,OF THE ANALYST .................. JCH
DATE OF THE ANALYSIS (amt/dd/yy)...... 05-17-1994
TIME PERIOD ANALYZED ................. PM Peak
OTHER INFORMATION.... 2010 Total Traffic
INTERSECTION TYPE AND CONTROL
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
--------------------- -----------------------------------------------
EB WB NB SB
---- ---- ----
LEFT 42 19 0
THRU 0 -- 111 221
RIGHT 19 -- 0 102
NUMBER OF LANES
EB WB NB SB
------- ------- ------- -------
LANES 2 -- 2 2
CAPACITY AND LEVEL -OF -SERVICE
Page-3
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c p M SH R.SH(pcph) c (pcph) c (pcph) c = c - v LOS
------- -------- --------- ------------------------ ---
MINOR STREET
EB LEFT 33 565 559 559 526 A
RIGHT 14 959 959 959 944 A
MAJOR STREET
NB LEFT 14 821 821 821 807 A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... Site Access
NAME OF THE NORTH/SOUTH STREET.... Mitchell Drive
DATE AND TIME OF THE ANALYSIS..... 05-17-1994 ; Noon Peak
OTHER INFORMATION.... 2010 Total Traffic
ADJUSTMENT
------------------------------------
FACTORS
--------------------------------
Page-2
PERCENT RIGHT TURN
CURB RADIUS
(ft) ACCELERATION LANE
GRADE ANGLE
FOR RIGHT TURNS' FOR RIGHT TURNS
EASTBOUND
------- ---- -----
0.00 90
----------------
20
-----------------
N
WESTBOUND
----- ---
---
-
NORTHBOUND
0.00 90
20
N
SOUTHBOUND
0.00 90
20
N
VEHICLE COMPOSITION
---------------------------------------------------------------------
$ SU TRUCKS $
COMBINATION
AND RV'S
VEHICLES
$ MOTORCYCLES
EASTBOUND
----------- -------------
4
1
-------------
0
WESTBOUND
---
---
---
NORTHBOUND
4
1
0
SOUTHBOUND
4
1
0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE
--------
ADJUSTMENT
-----------
CRITICAL GAP
------------
MINOR RIGHTS
EB 5.50
5.50
0.00
5.50
MAJOR LEFTS
NB 5.50 5.50 0.00 5.50
MINOR LEFTS
EB 7.00 7.00 0.00 7.00
IDENTIFYING INFORMATION
------------ w
OF THE EAST/WEST STREET...... Site Access
NAME OF THE NORTH/SOUTH STREET.... Mitchell Drive
DATE AND TIME OF THE ANALYSIS..... 05-17-1994 ; Noon Peak
OTHER INFORMATION.... 2010 Total Traffic
0
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
***,e,e:**,r*:,r***rr,e,e*t,e****,ex:*,r,r**,r*:*::******:,t:,eet*:t*,rr**,e***,►,e::::r
IDENTIFYING INFORMATION
AVERAGE RUNNING SPEED, MAJOR STREET.. 30
PEAR HOUR FACTOR ..................... 1
AREAPOPULATION ...................... 50000
NAME OF THE EAST/WEST STREET......... Site Access
NAME OF THE NORTH/SOUTH STREET....... Mitchell DriVe
NAME OF THE ANALYST .................. JCR
DATE OF THE ANALYSIS (ami/dd/yy)...... 05-17-1994
TIME PERIOD ANALYZED ................. Noon Peak
OTHER INFORMATION.... 2010 Total Traffic
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
EB WB NB SB
---- ---- ---- ----
LEFT 32 -- 14 0
THRU 0 -- 84 173
RIGHT 14 -- 0 96
NUMBER OF LANES
EB WB NB SB
-------------- ------- -----
LANES 2 -- 2 2
CAPACITY AND
7 --------------------------------------------------------------------
LEVEL -OF -SERVICE
Page-3
POTEN-
ACTUAL
FLOW-
TIAL
MOVEMENT
SHARED
RESERVE
RATE
CAPACITY
CAPACITY
CAPACITY
CAPACITY
MOVEMENT
v(pcph)
c (pcph)
c (pcph)
c (pcph)
c = c - v
LOS
-------
p
--------
M
---------
SH
------------
R. SE
------------
---
MINOR STREET
EB LEFT
43
738
731
731
687-
A
RIGHT
20
997
997
997
977
A
MAJOR STREET
NB LEFT
15
957
957
957
942
A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... Site Access
NAME OF THE NORTH/SOUTH STREET.... Mitchell Drive
DATE AND TIME OF THE ANALYSIS..... 05-17-1994 ; PM Peak
OTHER INFORMATION.... 1995 Total Traffic
I
ADJUSTMENT FACTORS
---------------------------------------------------------------------
Page-2
PERCENT RIGHT TURN
CURB RADIUS
(ft) ACCELERATION LANE
GRADE ANGLE
FOR RIGHT TURNS FOR RIGHT TURNS
------- ----------
EASTBOUND 0.00 90
----------------
20
-----------------
N
WESTBOUND ----- ---
---
-
NORTHBOUND 0.00 90
20
N
SOUTHBOUND 0.00 90
20
N
VEHICLE COMPOSITION
-=-------------------------------------------------------------------
$ SU TRUCKS $
COMBINATION
AND RV'S
VEHICLES
$ MOTORCYCLES
----------- -------------
EASTBOUND 4
1
-------------
0
WESTBOUND ---
---
---
NORTHBOUND 4
1
0
SOUTHBOUND 4
1
0
CRITICAL GAPS
---------------------------------------------------------------------
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
VALUE
ADJUSTMENT
CRITICAL GAP
--------------
MINOR RIGHTS
--- -----
-----------
------------
EB 5.50
1 5.50
0.00
5.50 .,
MAJOR LEFTS
NB 5.50
5.50
0.00
5.50
MINOR LEFTS
EB 7.00 7.00 0.00 7.00
IDENTIFYING INFORMATION
---------------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... Site Access
NAME OF THE NORTH/SOUTH STREET.... Mitchell Drive
DATE AND TIME OF THE ANALYSIS..... 05-17-1994 ; PM Peak
OTHER INFORMATION.... 1995 Total Traffic
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
►**,r*,e,rx***+r***r,r*t**ttirett*:::*,r***:*:*****at#r*,e,eirit**:*::**+tte,r,e,r,r:***
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 30
PEAK HOUR FACTOR ..................... 1
AREAPOPULATION ...................... 50000
NAME OF THE EAST/WEST STREET......... Site Access
NAME OF THE NORTH/SOUTH STREET....... Mitchell Drive
NAME OF THE ANALYST .................. JCH
DATE OF THE ANALYSIS (mm/dd/yy)...... 05-17-1994
TIME PERIOD ANALYZED ................. PM Peak
OTHER INFORMATION.... 1995 Total Traffic
INTERSECTION TYPE AND CONTROL
INTERSECTION TYPE: T—INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
EB WB NB SB
---- ---- ---- ----
LEFT 42 -- 15 0
THRU 0 -- 18 34
RIGHT 19 -- 0 102
NUMBER OF LANES
EB WB NB SB
-------------- ------- -----
LANES 2 -- 2 2
CAPACITY AND
--------------------------------------------------------------------
LEVEL -OF -SERVICE
Page-3
POTEN-
ACTUAL
FLOW-
TIAL
MOVEMENT
SHARED
RESERVE
RATE
CAPACITY
CAPACITY
CAPACITY
CAPACITY
MOVEMENT
v(pcph)
c (pcph)
c (pcph)
c (pcph)
c = c - V
LOS
-------
p
--------
M.
---------
SH
------------
R SO
------------
---
MINOR STREET
EB LEFT
33
760
753
753
720
A
RIGHT
14
997
997
997
983
A
MAJOR STREET
NO LEFT
14
975
975
975
961
A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... Site Access
NAME OF THE NORTH/SOUTH STREET.... Mitchell Drive
DATE AND TIME OF THE ANALYSIS..... 05-17-1994 ; Noon Peak
OTHER INFORMATION.... 1995 Total Traffic
ADJUSTMENT FACTORS
Page-2
PERCENT RIGHT TURN
CURB RADIUS (ft) ACCELERATION LANE
GRADE ANGLE
FOR RIGHT TURNS FOR RIGHT TURNS
------- ---------
EASTBOUND 0.00 90
---------------- -----------------
20 N
WESTBOUND ----- --
--- -
NORTHBOUND 0.00 90
20 N
SORTHBOUND 0.00 90
20 N
VEHICLE COMPOSITION
---------------------------------------------------------------
----
S SU TRUCKS $
COMBINATION
AND RV'S
VEHICLES $ MOTORCYCLES
----------- -------------
EASTBOUND 4
-------------
1 0
WESTBOUND ---
--- ---
NORTHBOUND 4
1 0
o
'
SORTHBOUND 4
1 0
CRITICAL GAPS
---------------------------------------------------------------------
TABULAR VALUES
ADJUSTED SIGHT DIST. FINAL
(Table 10-2)
VALUE ADJUSTMENT CRITICAL GAP
--------------
MINOR RIGHTS
-------- ----------- ------------
EB 5.50
5.50 0.00 5.50
MAJOR LEFTS
NB 5.50
5.50 0.00 5.50
MINOR LEFTS
EB 7.00
7.00 0.00 7.00
IDENTIFYING INFORMATION
-----------------------------------_----------------------------------
NAME OF THE EAST/WEST STREET...... Site Access
NAME OF THE NORTH/SOUTH STREET.... Mitchell Drive
DATE AND TIME OF THE ANALYSIS.....
05-17-1994 ; Noon Peak
OTHER INFORMATION.... 1995 Total Traffic
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
IDENTIFYING.INFORMATION
AVERAGE RUNNING SPEED, MAJOR STREET.. 30
PEAKHOUR FACTOR ..................... 1
AREAPOPULATION ...................... 50000
NAME OF THE EAST/WEST STREET......... Site Access
NAME OF THE NORTH/SOUTH STREET....... Mitchell Drive
NAME OF THE ANALYST .................. JCH
DATE OF THE ANALYSIS (am/dd/yy)...... 05-17-1994
TIMEPERIOD ANALYZED ................. Noon Peak
OTHER INFORMATION.... 1995 Total Traffic
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC
--------------------------------------------------------------------
VOLUMES
EB WB NB SB
LEFT
---- ---- ---- ----
32 -- 14 0
THRU
0 -- 10 23
RIGHT
14 -- 0 96
NUMBER OF LANES
EB WB NB SB
-------------- ------- -------
LANES 2 -- 2 2
J
4
4 32
U34 .
26
27 —_
3 28
99 33
47
08 I 35
120 / 37
Norestooth Rd.
Edge of Existing Pavement
------- — — --
I
I
I
U Legend:
/ 4
5 _
00 ,✓('�8
84 I 9E
32
42
N
L�
No scale
C
i
u
S 966
32 i102
42
14
18
11
10 j
32 _ Noon Peak -Hour Traffic
34 PM Peak -Hour Traffic
Figure 7
Peak -Hour Site -Generated Traffic
1st Choice Bank, Ft. Collins, CO
(LSC #940440)
May, 1994
Leleh. Scott & Clowrv_ Inc
Mr. Tom Vosburg Page 2 July 8, 1994
turn lane -
315 ft.
taper (15:1) -
180 ft.
storage -
125 ft.
620 ft.
The lengths of these turn lane components are shown on the enclosed diagram.
The turn lane extends through the Showtime access. The taper extends past the
Wendy's access drive, where a deceleration lane has been constructed. It is
therefore recommended that the right turn lane on College Avenue be
constructed from. the Wendy's access north to Horsetooth Road. Including the
Wendy's deceleration lane as part of the right turn lane means that all state
access code standards are met and no variance is required.
4. Required distance for eastbound Horsetooth Road right -turn lane at Mitchell
Drive: Using Tables 4.8.1 and 4.8.4 of the State Access Code, the required
length of this turn lane assuming a 35 mph posted speed and a 15 mph turn
condition is
turn lane - 235 ft.
taper (15:1) - 150 ft.
385 ft.
The enclosed diagram shows that the right turn lane can be constructed to meet
these required distances.
Again, thank you for your assistance in developing this traffic analysis. I will call you in a few
days to review the above items.
Sincerely.
LEIGH. SCOTT & CLEARY, INC..
By: &-16 ac,��—
Alex Ariniello, P.E.
AA/wd
CC: John Drennen
C:\PROJECTS\940440\VOSBURG2.FC
LEIGH, SCOTT & CLEARY, INC.
TRANSPORTATION PLANNING
& TRAFFIC ENGINEERING CONSULTANTS
1889 York Street
Denver, CO 80206
(303)333-1105
FAX (303) 333-1107
July 8, 1994
Mr. Tom Vosburg
Transportation Department
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
Re: First Choice Bank
(LSC #940440)
Dear Tom:
Thank you for the opportunity to meet and discuss the traffic impact analysis for First Choice
Bank. The following addresses your comments:
1. Future trip diversion due to the completion of Mitchell Drive and the
recirculation system: The traffic analysis, page B-8, states that "about 1,000
trips per day will -be diverted from the College Avenue/ Horsetooth Drive Road
:intersection once. this new recirculation system is in place." These trips will
most likely come from the area bounded by Mitchell Drive, College Avenue,
Horsetooth Road and Bockman Drive. Currently, this area contains various
retail businesses, including a video rental outlet, florist, fast food restaurant,
auto parts store, and paint store. A rough estimate of the trips generated in this
area is 8, 000 vehicle trips per day. The diverted trips would be trips coming from
or going to the east, which are estimated to be 25 percent of total trips. Thus
there may be 2,000 vehicle trips that could be diverted. Due to trip linking,
proximity of the uses to College Avenue and ease of access to College Avenue for
right turning vehicles, about half of these trips, or 1,000 per day, are projected
to be diverted.
2. Site -Access total trips: Figure 7, Peak -Hour Site -Generated Traffic has been
revised to include trips entering or exiting the site from the south. Also, the
Mitchell Drive access diagram has been revised to reflect trips coming from
Horsetooth Drive east, which were not included in the original analysis. The
driveway totals now match the trip generation analysis (except for rounding ).
Capacity analyses for 1995 and 2010 were rerun and are included with this
letter. No significant difference was found.
3. Required distance for northbound College Avenue right -turn lane: Using Tables
4.8.1 and 4.8.4 of the State Access Code, the required length of this turn lane
assuming a 40 mph posted speed and a stop condition is
NO