Loading...
HomeMy WebLinkAbout1ST CHOICE BANK OF FORT COLLINS (TEMPORARY FACILITY) - MINOR SUBDIVISION - 41-94 - CORRESPONDENCE - LUC REQUIREMENTSAnother requirement of the modular structure will be the development and landscaping of the parking lot. This must be done in accordance with the Zoning Code and the Parking Lot Development Guide. The modular structure will trigger submittal of a utility plan, storm drainage report, drainage and grading plan, and erosion control plan. The obligations of the developer, as set forth in these documents, will be specified in a development agreement that must be executed by the City and the developer prior to beginning land development on the site. As applicants, you should allow eight to ten weeks from the date such plans and reports are submitted to the City for review. Finally, normal building permit fees will be due for the modular structure. These fees are specified in the Development Manual. It is our hope that your development plans for this property proceed smoothly with a full understanding of the submittal requirements for a modular structure. If you have any further questions regarding the plan review process, please contact Mr. Peter Barnes, Zoning Administrator, 221-6760. If there are questions regarding the requirements for the utility plans, drainage report, drainage and grading plan, and erosion control plan, please contact Kerrie Ashbeck, 221-6750. Sincerely: '/ ;S Ted Shepard Senior Planner xc: Mr. Bill Roumas One Marmack Place Loveland, CO 80537 Peter Barnes, Zoning Administrator Kerrie Ashbeck, Civil Engineer Encl. Planning Department June 23, 1994 and Environmental Services T—�C� U_ . k_s a{4 L_�L la- P' i Mr. Jim Hillhouse 11005 South Boulder Road4,� Lafayette, CO. 80026 L--- Dear Mr. Hillhouse: It has come to the attention of the City'of"Fort Collins Planning Department and Building Inspection Division that the site at the southeast corner of South College Avenue and Horsetooth Road is being considered for a modular structure.to house a bank. Further, this modular structure is to be used on a temporary basis until f such time as a permanent structure would be built. At the time the € property was brought before the City's conceptual review team, there was no mention of a modular structure. The purpose of this letter is to clarify the.process for site development given the new development scenario. Please be aware that under the Zoning Code, the modular structure will trigger the normal development requirements as if it were a permanent structure. The Zoning Code does not recognize a temporary condition or time frame, but rather, considers all structures to be permanent and subject to full inspection for compliance with all pertinent codes, fees, and the conditions of a certificate of occupancy. It is our hope that you have a copy of the original conceptual review comments for the site. It is not our intent to duplicate these comments here but outline the major issues. One of the primary comments is that the placement of a modular structure will require the property to be platted. In addition, the modular structure -must apply for a building permit that is processed by the City's Building Inspection Division.. This.process is described in the enclosed hand-out entitled "Use -By -Right - Review" which is excerpted from our Development Manual. This document contains detailed information and is an excellent resource if you are not familiar with land development in Fort Collins. The placement of a modular structure will require the submittal of a traffic impact analysis. This study will address the design of the deceleration lane for northbound College Avenue. This decel lane will be required to be built with the placement of the modular structure. V L- C-C tw,A , 1.7Z.6 —3s s- 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750