Loading...
HomeMy WebLinkAbout1ST CHOICE BANK OF FORT COLLINS (TEMPORARY FACILITY) - MINOR SUBDIVISION - 41-94 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSt -'� A' PACES O 9FT .S • 13.67 n s DOWN 4' H. WOOD FErCE126 \ T << VVa, . �, be o.�✓ i - 4F'T WIDE RAMP . , \ (5) GREEN ASH .._ ....... •5 FRAXINUS PENNSYLVANIA LANCEOTA BACKFLOW PREVENTER, , 1.75"-2" CAL. B.&B. TIMER, AND VALVE BOX 0 ,\ S L--- -,�'' 18' � I--- 'r .5•�-� ,,� o. ; �-- L. r.-L a 3�- (s +v a •e ♦. :y'. Li�:f�.qv�`j[r •i_� .i ``\ L 1/.LIS Rp(_:/ `, -i- SCE`^'\ L \ ••\\,` `\ fit!y1AT Is >n a'1 ♦1 1 `\.. GS PG`O� Q`{ (2- �t�C1.aJlC \;,;\ ♦ \\``\\ n { „ . +,,'1 • NOTE: ALL NEW LANDSCAPE AREAS TO BE \ SPRAY IRRIGATED .\ ...:. t SMOOTH BROME GRASS SEED\� \\ (SHOWN HATCHED) (10) GREEN ASH - FRAXINUS PENNSYLVANIA LANCEOTA. \\; 22'! \ , 24' 12' • ,r::, '+ `, �'. • ` -. _ ,_ _ .75 — CAL. B.6c8. \\ J First Choice Bank of Fort Collins The site shall be accessible to persons with disabilities in accordance with Uniform Building Code Section 3103 and UBC Appendix Section 3106. Provide designated and marked accessible routes between buildings and the public way and accessible parking and the buildings. Provide parking and signs per Appendix Section 3107. Items needed for building permit submittal are two copies of the following: 1. Information from the manufacturer of the modular unit stating snow loads and floor loads used in the design of the unit. 2. Structural foundation drawings bearing the seal and signature of a registered Colorado engineer. 3. Design drawings for the tie -down system bearing the seal of a Colorado registered engineer and stating that the system will withstand 100 mph wind loads. 4. Construction drawings for a handicapped access ramp and landings showing compliance with Section 3307, 1991 Uniform Building Code. The design shown on the submitted drawings does not conform to the UBC requirements. Sharon Getz Building Inspection (303)221-6760 STANDARD LANGUAGE FOR DEDICATION STATEMENTS ON PLATS . Containing acres or square feet more or less that the undersigned have caused the above described land to be surveyed and subdivided into lots, tracts, and streets as shown on this plat -to be known as and is subject to all easements and rights -of -way now on record or existing or indicated on this plat and does hereby dedicate and convey to and for public use, forever, the streets and easements as laid out and designated on this plat, provided however that: 1) acceptance by the City of this dedication of easements does not impose upon the City a duty to maintain the easements so dedicated, and 2) acceptance by the City of this dedication of streets does not impose upon .the City a duty to maintain the streets so dedicated until such time as the streets are inspected and accepted by the City Engineer. All maintenance of the above described streets shall be performed by the undersigned (and his/her successors in interest) until such time as the City assumes such maintenance. r Maurice H. Lutkin, P.E. First Choice Bank of Fort Collins Minor Subdivision Page 3 The next step in this minor subdivision process is for you to respond to these comments, as well as any additional comments from Transportation, Stormwater and Engineering. Your response will need to include revised plans. Once the revisions are received and reviewed, a public hearing will be scheduled. Should you have any questions regarding these comments, please contact me. Sincerely, Robert E. Blanchard, AICP Chief Planner cc: Kerrie Ashl:eck, Civil Engineer ,.I Maurice H. Lutkin, P.E. First Choice Bank of Fort Collins Minor subdivision Page 2 7. Control monuments (2) and outerboundary monuments must be described. 8. Graphic curve data must be shown on the subdivision plat. 9. The basis of bearings in the West line of the NW 1/4 will require another control monument to be shown. 10. The legal description starts at the northeast corner of the section. This should be redone to start at the northwest corner. 11. The southwest corner of Horsetooth and Mitchell should be shown as a curve on the plat as it is shown on the site plan and include dedication of the curvature. 12. The building floor area is limited to 2,742 square feet on a lot this size. 13. Since the gross parking area exceeds 4,500 square feet, a landscaped island(s) must be provided to meet the Code requirement that 6% of the interior area be landscaped. 14. The'15' grass strip to the south and west of the lot is only required to be 5' wide. However, it must contain trees, shrubs and berming. The installation of plant material in this area could be guaranteed by escrow or letter of credit until the time the permanent structure is constructed provided the construction occurs by spring of 1995. Otherwise, this area must be planted. 15. A handicap parking stall and a bicycle rack are required. 16. The combination of trees, shrubs and berming must block a 20% cross section view of the parking area during the winter which may require additional landscape materials. This applies to the landscape areas adjacent to Horsetooth Road and Mitchell Drive. 17. Please see the attached comments from Building Inspection. 18. Please see the attached drawing from Tim Buchanan, City Forester, for suggested changes. 19. Transportation, Stormwater and Engineering comments will be mailed under separate cover. Commu� Planning and Environmental .vices Planning Department City of Fort Collins August 23, 1994 Maurice H. Lutkin, P.E. Water, Waste & Land, Inc. 2629 Redwing Road Suite 200 Fort Collins, CO 80526 Dear Mr. Lutkin: Staff has reviewed the Minor Subdivision application for the First Choice Bank of Bank of Fort Collins and have the following comments: 1. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. US West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Public Utilities Commission. 2. The owner is responsible for provision of all conduit, ditch and street crossings for telephone facilities within the project and the owner provides terminal room space (usually 4'x 4') and power for the main terminal at one building,. generally in a janitors' closet or utility room. The owner's vendor provides all facilities beyond the main terminal. Contact the US West engineer for conduit specifications for the main telephone entrance cable. 3. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. 4. The Public Service Company of Colorado (PSCo) does not anticipate any conflicts between this development and their existing high pressure transmission natural gas pipeline located within the southerly portion of Horsetooth Road, running in an east/west direction. However, this response is relative only to the high pressure natural gas facilities owned by PSCo. You need to verify the lack of conflict with PSCo electric transmission, distribution gas and distribution electric. PSCo reminds you that all existing utilities should be located before beginning construction. 5. The dedication statement is inaccurate. Please refer to the attached standard dedication language. 6. The lot must be called a lot and include its area. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750