HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, CARRIAGE AUTO SERVICE SHOP - FDP - 43-94J - CORRESPONDENCE - STAFF'S PROJECT COMMENTSDepartment: Engineering Contact: Katie Moore
Number 62
(12/03/03) Why did the right-of-way dedication along Timberline change from 10.5
feet to 15.5 feet? According to the previous calculation, 10.5 feet was sufficient. Did
something change? The plat should indicate a 10.5 foot dedication along Timberline
Road. The site plan shows the dedication correctly.
Number 63
(12/03/03) Did a C.A:D. layer get turned off? The plat is now missing the 10-foot
Public Service Company easement and the 20-foot PSCo easement as well.
Number 64
(12/03/03) Some of the lines are too light to be reproduced or scanned. Please be
sure that all line weights are sufficient on the mylars for both reproducing and
scanning.
The plat needs to indicate that the parcel is "Lot One" and provide the square
footage of the entire lot, not the building envelope.
Be sure to indicate exterior building materials and color on the architectural sheet.
We are ready for signed mylars. For the plat, be sure to submit a total of three
mylars — one original and two copies.
Be sure and return all of your redlined plans when you re -submit. As always, if you
have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Sincerely:
Ted Shepard
Chief Planner
Page 2
` STAFF PROJECT REVIEW
Cih•of Fort Collins
VF RIPLEY ASSOC. Date: 12/18/2003
AMY JOHNSON
401 W MOUNTAIN AVE. #201
FT. COLLINS, CO 80521
Staff has reviewed your submittal for HORSETOOTH EAST BUSINESS PARK,
CARRIAGE AUTO SERVICE SHOP - TYPE II (LUC) AND FINAL PLAN, and we
offer the following comments:
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 65 Created: 12/11/2003
Please revise water quality outlet structure per redline on sheet 6.
Department: Stormwater Utility
Topic: Erosion Control
Number: 66
[12/16/03]
Third Review
December 15, 2003
Issue Contact: Basil Harridan
Created: 12/16/2003
Please provide an erosion control surety calculation.
Some of the proposed construction is outside your proposed silt fencing and
downstream (the detention area). How do you propose to account for this
construction in your plan?
Part of the site slopes to the north and/or northeast. What do you propose for the
protection of the north drive?
Your note # 9 states that gravel filters are to be installed on all inlets. Where is this?
Your note # 11 calls for the straw bales to be installed immediately following grading.
Where is this?
Your note #12 calls for seeding all disturbed areas "as described in the Grading and
Erosion Control notes on this sheet." What notes?
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 67 Created: 12/18/2003
[12/18/03] No comments
Paae 1
I'