Loading...
HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, 2ND FILING - FINAL PUD - 43-94F - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSCU Y72@@P(A� urban design, inc. 8. All red -lined plan comments have been addressed, please see the revised plans for all changes. We believe all comments have been addressed, please review these and confirm the placement of this project on the January 17'" Planning and Zoning hearing agenda. Please call if you have any questions or require additional information or materials. Sincerely, 16� Rza'�4j Kimberly Straw, AL& Cityscape Urban Design, Inc. enclosures cc: Jerry Lee, W.W. Reynolds Mike Jones, Northern Engineering December 1, 1998 Steve Olt Current Planning City of Fort Collins 281 North College Avenue Fort Collins, CO 80524 Re: Horsetooth East — Pad G Dear Steve: urban design, inc. 3555 stanford road. suite 105 fort Collins, colorado 80525 (970) 226-4074 FAX (970) 226-4196 E-mail: cityscap@frii.com Please find enclosed the requested copies of revised plans for the Horsetooth East Pad G project. The following revisions were made to the plans: Zoning Department a. Light pole locations are now shown on the plans. b. The vehicle — sight line conflict has been resolved by planting lower growing shrubs. The tree located there is a deciduous shade trees and should not hinder vision. 2. Stormwater Utility Most stormwater comments are addressed in utility and drainage plans prepared by Northern Engineering. 5. The issue of relocating the trees in the ponding area was resolved with Donny Dustin previously. 3. Water/Wastewater Department Most water/wastewater comments are addressed in utility and drainage plans prepared by Northern Engineering. - Water and sewer mains are shown on the site and landscape plans - Landscape design has been coordinated with the civil design 4. Engineering Department Most engineering comments are addressed in utility and drainage plans prepared by Northern Engineering. - The retaining wall with handrails has been labeled on the site and landscape plans. 5. The necessary easements have been or are being addressed by Northern Engineering. 6. The most current Rite -aid site plan has been inserted into our plans. 7. A larger, more detailed vicinity map has been provided on Sheet 1.