Loading...
HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, 2ND FILING - FINAL PUD - 43-94F - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFinal Drainage Report Northern Engineering Services, Inc. Horsetooth East Business Park, Pad G Center P.U.D. May 15, 1998 Page 6 TABLE OF CONTENTS PAGE Section A: Excerpts from Reference 1.............................................................. Al -All Section B: B1- B7 Developed Hydrology ........................................ ........................... Section C: C 1- CS I Design of Inlets Section D: D l - D4 Design of Storm Sewers.................................................................. Section E: E1- E2 I Designof Swales..................................................................... Section F: F1- F3 I Design of Culverts.................................................................. I Section G: G 1- G5 Detention Pond Calcuations............................................................. Section H: Hl- H4 Designof Orifaces.................................................................. Section I: Riprap Calculations I1- I2 ...................................................................... ISection j: Erosion Control Calculations J 1- J ........................................................... I I I I I Final Drainage Report Northern Engineering Services, Inc. Horsetooth East Business Park, Pad G Center P.U.D. May 14, 1998 Page 5 REFERENCES 1). Final Drainage and Erosion Control Study for Carriage Wash P.U.D., RBD, Inc. Engineering Consultants, October, 1995. 2.) Storm Drainage Report of Horsetooth Business Park, First Filing, Stewart and Associates, Inc., February 1991. 3.) Storm Drainage Design Criteria and Construction Standards, City of Fort Collins, Colorado, May, 1984. 4.) Drainage Criteria Maunal, Urban Drainage and Flood Control District, Wright - McLaughlin Engineers, Denver, Colorado, March, 1969. I I I Final Drainage Report Horsetooth East Business May 15, 1998 Page 4 Park, Pad G Center P.U.D. Northern Engineering Services, Inc. Timberline and Big Horn Drive. Basin 5 flows east to a low point in Elk Road (Design Point 5). The flow will then continue south in a swale along Timberline Drive to the existing detention ponds on the Carriage Wash Site. An existing orifice on the outlet of Pond B restricts the flow to 0.46 cfs, which is the designed release rate from the Carriage Wash P.U.D. The orifice will be replaced to allow flows up to 0.757 cfs (See Section H). V. EROSION CONTROL and WATER QUALITY 5.1 Erosion Control Plan The erosion control plan presented here is intended to control both wind and rainfall erosion. Evaluation of the rainfall erosion control plan will be completed first, with the wind erosion control plan to follow. The Erosion Control Reference Manual for Construction Sites (ECRM), City of Fort Collins, has been referenced for this erosion control plan. The proposed rainfall erosion control plan during construction will consist of temporary structural erosion control measures. Gravel inlet filters will be placed at all area inlets and sidewalk chases. Temporary sediment control consisting of straw bale dikes will be used in swales until permanent vegetation is established. Riprap outlet protection provided at the outlet of the swale will be buried with a minimum of six inches of native topsoil. Performance standards for the City of Fort Collins to be used for "During Construction" activities are given in Table 5.1. Computation of the "Performance Standard" and "Effectiveness" of the Erosion and Sediment Control Plan are presented in Section ] of this report. The proposed wind erosion control plan during construction will consist of silt fencing. From the Wind Erodibility Map for Fort Collins, Colorado, the site is located in a moderate erodibility zone. From Table 4.1 (page 19 of the ECRM) the maximum barrier spacing is 200 feet. Silt fencing will be placed along the south and east property lines to act as a wind barrier. See the Grading and Erosion Control Plan for locations of proposed erosion control measures. VI. CONCLUSIONS 6.1 Compliance with Standards All drainage analyses have been performed according to the City of Fort Collins Storm Drainage Design Criteria Manual (SDDCM) and the Urban Drainage and Flood Control District's Drainage Criteria Manual. The only variance requested has to do with the depth of Pond 1. Pond 1 is parking lot detention that was required as part of the Horsetooth East Business Park Master Drainage Plan. In order to get the required volume, the ponding depth will need to be 23.16 inches which is greater than the standard ponding depth maximum of 18 inches. I Final Drainage Report Northern Engineering Services, Inc. Horsetooth East Business Park, Pad G Center P.U.D. May 15, 1998 Page 3 • The computer program "Storm Sewer" by Eagle Point has been used to analyze the capacity of storm sewers.. 4.5 Previous Studies Per the Final Drainage and Erosion Control Study for the Carriage Wash P.U.D. (Reference 1), about 8.11 acres of the entire Horsetooth East Business Park, Second Filing is to be detained onsite, requiring 1.64 ac-ft of storage with a maximum release rate of 0.17 cfs/ac. That study also determined that upstream four parking lots could provide a total of 0.34 ac-ft of storage. The use of the parking lots was then found to create a need for only 1.30 ac-ft of storage to be contained in Ponds A, B, and C on the Carriage Wash site. Using the coefficients and release rates from the Final Drainage and Erosion Control Study for the Carriage Wash P.U.D. , the existing ponds could accommodate 0.363 ac-ft of storage from the Pad G site (see Section G). Using the actual coefficients from the new site plan and the FAA Method for Pad G, 0.404 ac-ft of storage will be required (See Section G). This leaves a deficit of 0.041 ac-ft which will be detained in the Pad G parking area. As stated previously, the Drainage and Erosion Control Study for the Carriage Wash P. U. D. had anticipated 0.34 ac-ft of storage in upstream parking lots. The plan seemed to indicate detention in each of the four major parking lots for Pad A, Pad B/C, Pad D, and Pad G. Using this basis we calculated 0.34/4 = 0.085 ac-ft of storage in the Pad G parking area. This in combination with the storage required by the new site layout will give a parking lot storage requirement of 0.085 + 0.041 = 0.126 ac-ft. 4.6 Drainage Concept Basin 1 will drain overland to the southeast to a proposed area inlet (Design Point 1) and proposed Storm Sewer Line A. This line then drains south to an existing 24"x38" HERCP and then to existing Pond B. Basin 2 drains overland to the south to a proposed area inlet (Design Point 2). This basin will have detention in the parking area (Pond 1). Using the FAA Method it was determined that the required detention in the parking lot was 0.186 ac-ft, which is more than the 0.126 ac-ft that was previously calculated (See Section G). An orifice plate will restrict the flow to 0.15 cfs (See Section H). This line then drains to Storm Sewer Line A and again, south to Pond B. Basin 3 drains overland to Automation Way as proposed in previous drainage studies (Design Point 3). Basin 4 flows north along Automation Way, east along Horsetooth Road, and south along Timberline. This basin historically continued to run south along Timberline into a Type R curb inlet at the comer of Timberline and Big Horn Drive. Due to the proposed of a turn lane off of Timberline as part of this project, this basin will now drain to a low point in Timberline Road (Design Point 4). The flow will enter a Type "R" curb inlet then continue south in Storm Sewer Line C along Timberline Road to the existing curb inlet at the corner of Final Drainage Report Northern Engineering Services, Inc. Horsetooth East Business Park, Pad G Center P.U.D. May 15, 1998 Page 2 3.1 Maior Basin Identification The site is located in the Foothills Drainage Basin. Runoff from the project area will be routed by onsite storm pipes and then to an existing storm drain system which exits the Carriage Wash site along the south property line. These storm pipes eventually outlet to the downstream Collindale Regional Detention Pond. 3.2 Historic Drainage Patterns The site historically drains from northwest to southeast at slopes ranging from 0.90 to 2.70%. The majority of the site has historically drained to the south through the Carriage Wash site and into the existing Carriage Wash detention ponds. The Storm Drainage Report of Horsetooth Business Park (Reference 2), and the Final Drainage and Erosion Control Study for the Carriage Wash P.U.D. (Reference 1), were used as basis' for drainage planning for the Pad G site. IV. DEVELOPED DRAINAGE 4.1 Developed Conditions Planned development for Horsetooth East Business Park, Pad G includes: • a commercial office building • utilities including storm and sanitary sewers and water. Off -site easements for drainage and grading will be required for this development. 4.2 Design Criteria and References Drainage criteria outlined in both the City of Fort Collins Storm Drainage Design Criteria Manual (SDDCM) and Storm Drainage Criteria Manual by the Urban Drainage and Flood Control District have been referenced for this Final Drainage Study. 4.3 Hydrologic Criteria The Rational Method has been used to estimate peak stormwater runoff within the developed site with a minimum time of concentration of 5.0 minutes. The initial 10-year and major 100-year design storms have been used in the design of the proposed drainage system which include swales, inlets and storm sewers. Rainfall intensity data for the Rational Method has been taken from IDF curves (Figure 3-1) obtained from the "Larimer County Storm -Water Management Manual." 4.4 Hydraulic Criteria The City of Fort Collins Storm Drainage Design Criteria has been referenced for all hydraulic analyses. In addition, the following computer programs have been utilized: • The computer program "UDINLET" has been used to analyze inlet capacities; • The computer program "Flowmaster" has been used to analyze the capacity of proposed swales. i Final Drainage Report for Horsetooth East, Pad G Fort Collins, Colorado May 15, 1998 I. INTRODUCTION I 1.1 Objective To provide a final drainage scheme for the proposed Pad G in Horsetooth East Business Park. Specific objectives as part of this study are: 1. To adopt the hydrology and hydraulics contained in the Final Drainage and Erosion Control Study for Carriage Wash P.U.D. (Reference 1) and I the Storm Drainage Report of Horsetooth Business Park, First Filing (Reference 2), 2. To consider all off -site storm water runoff from adjacent properties and ' the design intent of future adjacent developments, 3. To consider any possible adverse effects downstream of the development due to developed stormwater. 1.2 Mapping and Surveying Topography of the site was provided to Northern Engineering Services by Landstar Surveying with a contour interval of one (1) foot. 1.3 Site Reconnaissance IA site visit was conducted on April 3, 1998 by the project engineer. Based on the topographic mapping, existing drainage basins and land use were confirmed as well as existing structures. The location and dimensions of existing culverts were verified as well as their condition and flow direction. II. SITE LOCATION AND DESCRIPTION 2.1 Site Location The site is located within Section 31, Township 7 North, Range 68 West of the 6th Principal Meridian in Fort Collins, Colorado. The project is bounded by Timberline Road on the east, the Carriage Wash on the south, and Automation Way on the west, (See Vicinity Map). 2.2 Site Description Horsetooth East Business Park, Pad G is approximately 1.918 acres and has historically been open space. There are no existing structures on the site. 2.3 Reservoirs and Irrigation Ditches There are no irrigation ditches or laterals located on the site. iIII. HISTORIC DRAINAGE BASIN PROJECT LOCATION HORSETOOTH ROAD s A ¢ 0 � p J Q ¢ O rn w p J O w o] Z 0 ¢ O a L7 HARMONY ROAD z 0 j v�•ow.��mwrtn.aA NORTHERN ENGWEEFt"G SERVIOES m wa ®...an. v. .. mum anuum eom PAD Q (m) m-aa our,aurt.uo ,. nviueo:m a °iw� May 14, 1998 City of Fort Collins Stormwater Utility 235 Mathews Fort Collins, Colorado 80522 RE: Pad G, Horsetooth East Business Park Fort Collins, Colorado Project Number: 9805.00 Dear Staff: Northern Engineering Services, Inc. is pleased to submit this Final Drainage Report for Pad G Horsetooth East Business Park for your review. This report was prepared in compliance with technical criteria set forth in the City of Fort Collins Storm Drainage Design Criteria and Construction Standards manual. If you should have any questions or comments as you review this report, please feel free to contact me at your convenience. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Zqlissa L. Mary B. Wohnrade, P.E. 420 SOUTH HOWES, SUITE 202, FORT COLLINS, COLORADO 80521, (970) 221-4158, FAX (970) 221-4159 Final Drainage Report for Pad G Horsetooth East Business Park Fort Collins, Colorado May 15, 1998 I I I I Prepared For: W.W. Reynolds Companies 1600 Specht Point Road Fort Collins, Colorado 80525 Prepared By: -NORTHERN Northern Engineering Services, Inc 420 S. Howes, Suite 202 Fort Collins, Colorado 80521 Phone: (970)221-4158 Project Number: 9905.00