Loading...
HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, 2ND FILING - FINAL PUD - 43-94F - SUBMITTAL DOCUMENTS - ROUND 4 - ROUTING SHEETProject: rL h E' Planner: Engineer: TrafOc Operations: — J'J Date: I % / Z � s--, Items Requested I WNW IfPmC RAiner RafnrvneA Engineering Stormwater Water/Wastewate Tralhc Operations Site ;< Land x x Plat �; Utility Drainage Rpt Other Items Required Site Land Plat T uIIJ Utilityb Drainage Rpt Oth x � x ✓� Trans. Planning Transkt Natural Resources Park Planning Totals Other: Note: All redlined items should be returned with the rewbmittal/ revisions. Revisions Routing Sh Item: [# M A t Date: i sl ks\7 p=lnt�� FILE: PROJECT PLANNER ENGINEERING: PAVEMENT ZONING BUILDING INSPECTION LIGHT & POWER MAPPING / DRAFTING FORESTRY FCLWD/ELCOBOXELDER FIRE POLICE ADVANCE PLANNING STREETS R.O.W. PLANNING WATER CONSERVATION POST OFFICE US WEST PUBLIC SERVICE SCHOOLS: POUDRE /THOMPSON CABLE TV STATE HIGHWAY DEPARTMENT DITCH COMPANY RAILROAD: UP or BN/CS REA/DOE/PRPA y 'Qr`�v oOy 8�+ a4 TOTAL Rev. S-07.97