HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, 2ND FILING - FINAL PUD - 43-94F - SUBMITTAL DOCUMENTS - ROUND 4 - ROUTING SHEETProject: rL h E'
Planner:
Engineer:
TrafOc Operations:
— J'J
Date: I % / Z � s--,
Items Requested I WNW IfPmC RAiner RafnrvneA
Engineering
Stormwater
Water/Wastewate
Tralhc Operations
Site
;<
Land
x
x
Plat
�;
Utility
Drainage Rpt
Other Items Required
Site
Land
Plat
T
uIIJ Utilityb
Drainage Rpt
Oth
x
�
x
✓�
Trans. Planning
Transkt
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the rewbmittal/ revisions.
Revisions Routing Sh
Item: [# M
A
t
Date: i
sl ks\7 p=lnt��
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
MAPPING / DRAFTING
FORESTRY
FCLWD/ELCOBOXELDER
FIRE
POLICE
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE /THOMPSON
CABLE TV
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
REA/DOE/PRPA
y
'Qr`�v oOy 8�+ a4
TOTAL
Rev. S-07.97