HomeMy WebLinkAboutFIRST CHOICE BANK - MINOR SUBDIVISION - 41-94A - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTWind erosion control features will consist of the following:
• The east/west irrigation channel berm along the south margin of the site.
• The silt fence along the north and east margins of the site.
• The temporary building..
• The main bank building.
• The paved parking areas to the south and east of the temporary building.
• The existing east curb of the north -bound lanes of College Avenue.
• Temporary Bank Detention berm.
Wind erosion control measures which will be implemented after construction will
consist of mulching and seeding the bare area. Hay or straw mulch will be applied and
crimped into the soil surface at a rate of 2 tons per acre after seeding of the site.
INSTALLATION SCHEDULE
Construction of the fill for the main bank facility is proposed to start in April 1995 and
continue through September 1995 with the majority of the main bank and parking
construction completed by completed July 1995. The approximate date of
implementation of the erosion control measure during construction are shown on a
time line spread sheet in Appendix II and on the Drainage and Erosion Control Plan.
EROSION CONTROL SECURITY
The erosion control security requirement for the 1ST Choice Bank main bank
construction was estimated based on the specification of Section 2.0 of the Manual.
The cost of the erosion control measures at the site as detailed above were estimated
to cost $2,290 with a security requirement of $3,435. The estimate is detailed in
Appendix II.
REFERENCES
1. City of Fort Collins, Colorado, Storm Drainage Design Criteria and Construction
Standards, May 1984, Revised January 1991.
1
I
1
I
IPractice Factor Measures
Sediment control practice measures for the 1 ST Choice Bank Construction will consist
of the construction of a silt fence, gravel filter inlet and sediment trap. The location
and details of the practice measures are shown on the Grading and Erosion Control
Plan and Detail Sheet appended at the end of this report.
Practice factor measures for the site after construction will consist of the silt fence.
The silt fence will remain until the erosion controls for construction of the main bank
facility are erected or until vegetation has been established. The P - Factor for the
basin is presented for both the during and after construction cases on Standard Form
B in Appendix II.
Cover Factor Measures
Cover factor measures for the site during construction will consist of the main bank
building pad and the parking areas for the Temporary Bank site which will be in place
at the beginning of main bank construction. The building and paved areas were
assigned a C - Factor value of 0.01.
Cover factor measures for the site after construction is completed will consist of the
placing of sod grass and landscaping mulches. The mulched and revegetated areas
were assigned C - Factor values of 0.01 as selected from the manual. Cover factor
values for the paved area was not changed from during construction conditions. The
calculations for the weighted C - Factor for both during and after construction are
presented on Standard Form B in Appendix II.
"During Construction" Effectiveness Evaluation
The Net Effectiveness for the erosion control measures at the site during construction
was calculated as 84.4 percent and exceeds the "During Construction" Performance
Standard value of 81.0 percent. Calculations of the basin effectiveness value and the
Net Effectiveness for the site are presented on Standard Form B in Appendix II.
"After Construction" Effectiveness Evaluation
The Net Effectiveness for the erosion control measures at the site after construction
was calculated as 99.0 percent and exceeds the "After Construction" Performance
Standard value of 95.3 percent. Calculations of the basin effectiveness value and the
Net Effectiveness for the site are presented on Standard Form B in Appendix II.
WIND EROSION ANALYSIS
The surface soils at the 1 ST Choice Bank site are rated as moderately wind erodible.
Construction at the site will occur during the wind season of November to May.
The limited size of the construction area and the necessary access in this area will
restrict the available area for placement of a wind barrier. For this reason the wind
erosion features at the site will consist primarily of natural features at the site, water
erosion controls and the features to be constructed.
I
RAINFALL EROSION ANALYSIS
Site Soils
The Larimer County, Soil Conservation Service Soils Report identifies the soils
overlaying the site as belonging to Thedalund Loam having slight to moderate rainfall
erodibility characteristics. The rainfall erosion season as detailed in the City of Fort
Collins, Erosion Control Reference Manual [11 (the Manual) is between May 1 and
October 31. The natural drainage of the site is from the southwest to northeast where
any runoff is discharged to the south gutter flowing east along Horsetooth Road. A
mixture of dryland grasses and weeds currently cover an estimated 55 percent of the
site located primarily on the south side. Fifteen (15) percent of the site is covered with
asphalt for the parking and access to the temporary bank site. The remaining 30
percent of the 2.17 acre property having served as a pumpkin and tree lot and parking
is considered to be bare ground with sparse to no vegetation.
The Manual details the site as having moderate wind erodibility characteristics. The
Manual states the predominant wind direction is from the west-northwest in this area.
The wind erosion season as detailed in the manual is between November 1 st and May
31 st.
Construction at the site is estimated to begin in April 1995 and continue through
September 1995, with the majority of the grading and fill work completed by March
1995 with the Box Culvert Installation. This schedule places the project in the rainfall
season for this area and out the wind erosion season.
Performance Standard
The estimated "During Construction" and "After Construction" Performance Standard
for the 1 ST Choice Bank Main site are 81.0 and 95.3, respectively. For the purpose
of estimating the site's Performance Standard the entire site was evaluated as one,
' 2.17 acre basin.
The Performance Standard for the site was estimated using the methods detailed in the
Manual and the estimated, average slope length and slope for the basin. Flow lengths
and slopes developed for calculation of the "During Construction" Performance
Standard is presented on Standard Form A in Appendix 11. The Performance Standard
I was taken from Table 5.1 of the Manual. The "After Construction" Performance
Standard is calculated by dividing the "During Construction" Performance Standard by
0.85.
I
J
I
I
I
Details
Support for the following discussion will be found in the calculations in Appendix I.
The total drainable area of the historic site, the area of the compacted earth and the
grassed area were measured. A composite runoff coefficient was calculated using
base coefficients of 0.35 for the compacted earth and 0.20 for grassed areas. Using
a time of concentration taken from overland flow curves, discharge was calculated for
a 2-year event under historic conditions. A peak discharge from a two year storm was
calculated to be 0.83cfs at Design Point A.
As shown, Basin A includes the interior of the developed site and Basin B includes the
widened portions of College Avenue and Horsetooth Road and Mitchell Drive Extension
to its centerline. Except for the paved surfaces included in Basin A, the culvert over
the canal along the south boundary of the site contributes little if any runoff to the site
as drainage holes in the culvert roof allow seepage to flow directly into the canal.
Runoff coefficients were determined for both Basin A and Basin B using base
coefficients of 0.25 for grassed areas and 0.95 for impervious surfaces. A mass
balance was calculated for Basin A for the 100 year event using a release rate of
0.83cfs. It was determined that this would require a pond volume of 11,239 cubic
feet. Mass balances were also calculated for Basin B alone and Basin A and B
combined fora 100 year event using a release rate of 0.83cfs. It was determined that
Basin B alone would require a detention volume of 2135 cubic feet and the
combination of Basins A and B would require a pond volume of 15,849 cubic feet.
The pond volume provided by site grading is 14,454 cubic feet (calculated by the
trapezoidal method). The pond volume required by adding the results of analyzing
Basin A and Basin B separately, equals 13,374 cubic feet. The difference between this
and the mass balance for the combination of Basin A and B results from release the
effect of differing release rates.
While the layout and grading of the site provides the volume to theoretically detain all
the runoff from a 100 year event from Basin A and all or most of the runoff from Basin
B, depending on the analytical approach, it is difficult to actually route runoff from the
adjacent streets into the site and through the detention system. Therefore, the runoff
from College, Horsetooth and Mitchell Drive will flow undetained to Warren Lake. To
offset this the runoff from Basin A, the site interior, will be released at a maximum rate
of 0.15cfs, less than the 0.83cfs historic release rate. This will be done using a 2 inch
orifice and will theoretically allow the capacity of the pond to be utilized during the first
three hours of a 100 year event.
The detention system as designed accounts for development within the site and all or
at least 90% of the adjacent street work depending on the approach to analyzing the
combination of Basins A and B. Thus, it does not appear that downstream stormwater
runoff conditions have been adversely impacted by the development of the 1 st Choice
Bank site.
The following does not have a direct impact on the foregoing. The flow in the east
gutter of College Avenue south of its intersection with Horsetooth Road to its high
point near Boardwalk Drive, was analyzed. The 5 foot inlet in the bridge over Canal
No.2 takes about 3cfs and about 11 cfs continues to Horsetooth during a 100 year
event.
I
® m m i m m � � ! � � � � ® � � � � �
-N V PTV V. • .. -•
--
26LL25
35 36
�P�
a
1.
ILI
is
u
---------------------------------
EAST NORSETOOTH ROAD
---------------------------------
OWN
1o1 CHOICE BANK
OF FORT COLLINS
BASIN A
EXISTING
tof CHOICE BANK OF FORT COLLINS DRAINAGE STUDY AND
EROSION CONTROL PLAN
UTILITY PLAN APPROVAL
M[rID lI:�R�a�
MC4o ar:�V
HATER
[ wwsre
5 of 12 " —.--
v.tx`x�x
Road, Landings Drive and Stanford Road to Warren Lake. Some runoff from the east
side of College Avenue from its high point opposite Shopko also enters this system.
A part of this College Avenue runoff enters Canal No.2 where College bridges the canal .
(this will be discussed separately under Drainage Design Details). The runoff from the
present level of development in the area served by the described system causes
flooding from time to time at the intersection of Horsetooth, Landings Drive and
Stanford Road.
Hydrologic Criteria
The Rational Method was used to analyze the impact of the runoff from the site of
interest.
Calculations
All calculations for this report have been made in accordance with criteria established
by the City of Fort Collins. Calculations are included in Appendix I.
Variances
No variance is requested.
DRAINAGE DESIGN
Conceot
The tendency for downstream flooding, as described under Development Constraints,
suggests that future development in the contributing area should not aggravate this
condition any more than absolutely necessary. To this end the 1 st Choice Bank site
has been graded to collect runoff in the northeast corner. A part of the runoff from
the street pavement and the shoulder construction along College Avenue, Horsetooth
Road and Mitchell Drive adjacent to the site has also been accounted for. Water
detained on site will be released to the south flow line of Horsetooth Road at less than
the peak rate that would theoretically occur from the two year historic storm falling
on Basin A (Basin A, Basin B and Design Point A are located on the enclosed figure and
are shown at a larger scale on the Drainage Study and Erosion Control Plan contained
with the Utility Drawings).
The volume that will be provided in the site detention pond exceeds the volume
required by established criteria (the required volume should provide for the difference
in runoff from Basin A between a 100 year storm under developed conditions and a
2 year storm under historic conditions released at the historic rate). This additional
volume will be utilized during the first three hours of a 100 year storm by reducing the
release rate to less than the historic 2 year rate. This will be done by restricting the
flow with an orifice of minimum practical size. This reduced release rate and the
excess detained volume have the effect of offsetting some of the runoff that would
be contributed to the system downstream by the adjacent streets in Basin B during a
100 year event:
W W
z
z z
w W
>
¢ d
w �
� d
a �
a W-
o a
v
SITE EAST HORSETOOTH ROAD
[Cm .11
0
�.
WARREN LAKE
1p Q \ I \ RESERVOIR
Cn J
� W
/ z
l w
¢
w
JHARMONY a
1
WATER FIGURE 1 Date:
FEB 1995
IVASTE 1st CHOICE BANK OF FORT COLLINS
SITE LOCATION MAP Project:
LAND 9441 21 00
INC.
FINAL DRAINAGE AND EROSION CONTROL REPORT
FOR
THE 1 ST CHOICE BANK PERMANENT FACILITY
FORT COLLINS, COLORADO
DEVELOPMENT LOCATION AND DESCRIPTION
Location
A new two story building is planned for a site at the southeast corner of College
Avenue and Horsetooth Road as shown on the enclosed Site Location Map. The
building will contain the permanent banking office of the 1st Choice Bank of Fort
Collins and several retail outlets. The project is scheduled for completion in 1995. A
site layout at a larger scale is shown on the Utility Drawings.
The site lies in the Northeast Quarter of Section 36, Township 7 North, Range 69
West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, State of
Colorado.
Prooerty Description
The property that the new building will occupy currently contains a trailer that the 1 st
Choice Bank is using as a temporary facility to conduct business until the new building
is completed. The remainder of the site is presently partially covered with grasses and
is partially covered with compacted earth resulting from earlier use as a fall pumpkin
and Christmas tree sales location. The site slopes from the southwest to the northeast
at a gradient of approximately 2%. Runoff historically entered the south gutter area
of Horsetooth Road and eventually flowed into Warren Lake Reservoir.
DRAINAGE BASIN IDENTIFICATION
Description
The site lies in the Foothills Drainage Basin.
DRAINAGE DESIGN CRITERIA
Regulations
The City of Fort Collins Storm Drainage Design Criteria (1 ] is being used as the basis
for this report.
Development Constraints
The system that presently conveys and will continue to convey runoff from the site to
downstream storage includes the gutters in Horsetooth Road, the piped drainage
system conveying runoff from part of Horsetooth Road and from the Marriot Hotel area
to Warren Lake and the piping that conveys runoff from the intersection of Horsetooth
WATER
WASTE
& LAND
INC.
February 7, 1995
2629 Redwing Rd. Suite 200, Fort Collins, Colorado 80526-2879
(303)226-3535
fax (303) 226-6475
Mr.Glen D. Schlueter
City of Fort Collins
Utility Services Stormwater
235 Mathews
Fort Collins, Colorado 80522
RE: 1 ST CHOICE BANK OF FORT COLLINS PERMANENT FACILITY - FINAL DRAINAGE
AND EROSION CONTROL REPORT
Dear Mr. Schlueter:
Transmitted herewith is a copy of the referenced report for your review and approval.
The report has been prepared in accordance with the requirements of the City of Fort
Collins.
If you have any questions or require any modifications please call me.
Thank you.
Sincerely,
WATER, WASTE & LAND, INC.
Ma rice H. Lutkin, P.E.
Manager, Civil Engineering Division
Consulting Engineers and Scientists
FINAL
DRAINAGE AND EROSION CONTROL REPORT
FOR
1 ST CHOICE BANK OF FORT.COLLINS
PERMANENT FACILITY
FORT COLLINS, COLORADO
Prepared for:
1 st Choice Bank of Greeley
2162 35th Avenue
Greeley, CO 80634
Prepared by:
Water, Waste & Land, Inc.
2629 Redwing Road, Suite 200
Fort Collins, Colorado 80526
• � i
' °
%%r^
"`:�,•'
February 7, 1995 =, . :`•
— n�
FINAL
DRAINAGE AND EROSION CONTROL REPORT
FOR
1ST CHOICE BANK OF FORT. COLLINS
PERMANENT FACILITY
FORT COLLINS, COLORADO
y�ll • R
III �
LAND