HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, CARRIAGE AUTO SERVICE SHOP - PDP - 43-94I - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW"Carriage" convenience center. For further information, please contact Doug Moore,
221-6600.
21. For an estimate of the Capital Improvement Expansion Fee, payable at the time of
building permit issuance, please contact the Building Inspection Division, 221-6760.
This fee is adjusted annually.
22. The architectural character of the building must conform to the other approved buildings
in the convenience shopping center. Significant landscaping is expected along
Timberline.
23. As a Type II use, a neighborhood information meeting is required unless specifically
waived by the Current Planning Department. Please contact the Current Planning
Department to discuss the need for such a meeting or to initiate this meeting. We will
prepare a notification map. The applicant provides the list of the property owners within
the notification area, plus $.50 cents per name. There is also the $50.00 sign posting fee.
We will arrange for the meeting location and facilitate the meeting.
5
10. The private drive must be platted as an emergency access easement in addition to public
access. For further information, please contact Ron Gonzales, 221-6570.
11. A new building will be assessed both the City's Street Oversizing Fee and the Larimer
County Road fee payable at the time of building permit issuance. Keep in mind fees are
adjusted annually. For further information, please contact Matt Baker, 221-6605.
12. A Transportation Impact Study will be required which will address all modes. Check
with Eric Bracke, 221-6630, to determine the scope of the study. Keep in mind that the
intersection of Timberline and Bighorn will not be signalized due to proximity to
Horsetooth and Caribou. If a recent T.I.S. was done, it may be updated.
13. Please be cautioned that any construction activity off -site will require an easement from
the property owner.
14. Timberline Road is classified as a major (six -lane) arterial. As such, development of the
subject parcel will require dedication of additional right-of-way so that there is 70.5 feet
from centerline of the roadway to property line. In addition, a 15-foot utility easement is
needed behind the right-of-way line. These dedications may or may not have already
been made by previous plats.
15. There should be direct and safe pedestrian access among the various uses within the
"Carnage" convenience center.
16. Public improvements shall comply with Larimer County Urban Area Street Standards.
One of these requirements is that the first parking stall must be setback from Bighorn
Drive between 40 — 50 feet, depending on the traffic volume on Bighorn as stated in the
T.I.S.
17. Utility Plans will be needed at the time of submittal. A Development Agreement will be
required prior to recording final documents. A Development Construction Permit will be
required prior to beginning site work. For further information, please contact Katie
Moore, 221-6605.
18. In the ultimate long-range design, Timberline will be a six lane arterial. A median will
reduce the turning movements at Bighorn to 3/ turns (no left -out) or to right-in/right=out
only. In the short range, the T.I.S. may call for a "porkchop" island to restrict turn
movements to right-in/right-out without the benefit of a median in Timberline.
19. Be sure to provide bike parking near the customer entrance. An outdoor plaza is
recommended for customers to enjoy during nice weather.
20. The construction phase will require a Fugitive Dust Permit from the Larimer County
Health Department. Also, trash enclosures should be sized to accommodate various
containers for recycling. A single trash hauler should be shared with the other uses in the
4
4. The project may also need a Modification to the Orientation to Connecting Walkway
standard of Section 3.5.3(B)(1). One way to meet this standard, as was discussed at the
meeting, would be to place the office/lobby component at the end of the four bays instead
of in the middle. The office/lobby could then tie directly onto a connecting walkway.
5. There is existing electrical power along Timberline so there is sufficient available power
to serve the site. It may be possible that the proposed lube shop could share the existing
transformer. If a new transformer is needed, its location must be coordinated with Light
and Power. If needed, a new transformer must be both accessible (within ten feet) to hard
surface for emergency change -out and screened for aesthetic purposes, if visible from a
public street or the neighborhood. In this case, the transformer should not be visible from
Timberline Road. Meters should be screened as well. Any modification to the existing
system would be at the developer's expense. A Commercial One ("C-1") Form must be
completed by a licensed electrical contractor. Light and Power has a hand-out describing
the development fees and charges. Street trees in the parkway strip must be kept 40 feet
from streetlights. Ornamental trees must be kept 15 feet from streetlights. For further
information, please contact Alan Rutz, 221-6700.
6. This site is in the Fox Meadows drainage basin where the new development fee is $6,468
per acre, subject to the runoff coefficient and amount of impervious surface. The
standard drainage and erosion control reports and construction plans are required and
they must be prepared by a professional engineer registered in Colorado. Onsite
detention is required along with water quality which may be provided by extended
detention. The site is on Stormwater inventory map #110. A copy can be obtained from
the Utilities office at 700 Wood Street. The design engineer will need to refer to the
Horsetooth East Business Park drainage plan for special drainage requirements. Unless
that report identifies a release rate the site release rate is the two-year historic rate. The
inventory map identifies an open channel as well as a storm sewer along the east property
line.
7. There is an existing 8-inch water main and an existing 8-inch sewer main in the north -
south drive west of the site. A sand and oil interceptor will be needed. Any existing
water and sewer services must be used or abandoned back to the main.
8. The water conservation standards for landscape and irrigation will apply to the project.
Development fees, water rights will be due at time of building permit. Please be aware
that the Water and Sewer Department of Fort Collins Utilities has implemented a plan
check fee. For further information, please contact Roger Buffington, 221-6700.
9. The site will be served by the Poudre Fire Authority. They will require that a fire hydrant
be within 300 feet of the building capable of delivering a minimum of 1,500 gallons per
minute at 20 p.s.i. The address must be visible from the street on which it fronts. A
Hazardous Material Impact Analysis is required to evaluate the amount and type of
potential flammable materials that may be stored in the building.
3
ITEM: New Carriage Lube Shop at S.W.C. Timberline/Horsetooth
MEETING DATE: January 27, 2003
APPLICANT: Byron Collins and Mark Tingey c/o Ms. Linda Ripley, V-F Ripley
and Associates, 401 W. Mountain Avenue, Fort Collins, CO
80521.
LAND USE DATA: Request for 1,600 — 2,000 square foot, four -bay automotive lube shop
located at the southwest corner of Timberline Road and Horestooth Road in the Horsetooth East
Business Park. The site is approximately 32,000 square feet in size located directly south of the
vacant Rite Aid building.
COMMENTS:
The site is zoned E, Employment. The proposed land use (vehicle minor repair, servicing
and maintenance) could only be permitted as part of a convenience shopping center
which is a secondary use in the E zone. And then a lube shop must be found a "use of
similar character as determined by the Planning and Zoning Board. As a secondary use,
the convenience shopping cannot occupy more than 25% of the E zone district as defined
by the boundaries of the Horsetooth East Business Park and Collindale Business Park.
Please read the definition of the convenience shopping center and note that it must
contain four or more businesses and not exceed seven acres.
2. Creating the boundaries of a convenience shopping center will require a logical exercise
that justifies which properties are included and which are not. Perhaps the private east -
west drive could act as the north boundary. This would then include the three "Carriage"
uses and the office building.
The build -to line along Timberline is between 10 and 25 feet subject to respecting
existing or proposed right-of-way and easements for utilities. Keep in mind that
Timberline is master planned as a major arterial with 141 feet of total right-of-way so the
east property line will be 70.5 feet from the ultimate centerline of the road. If any
Modifications of Standards are needed, then the request must be forwarded to the
Planning and Zoning Board either as a stand-alone Modification or in conjunction with
the Project Development Plan (P.D.P).
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 221 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
CURRENT PLANNING DEPARTMENT
f
Community Planning and Environmental Services
Current Planning
CitV of Fort Collins
January 30, 2003
Ms. Linda Ripley
V-F Ripley and Associates
401 W. Mountain Avenue
Fort Collins, CO 80521
Dear Linda:
For your information, attached is a copy of the Staff's comments for the New Carriage Lube
Shop at the Southwest Corner of Timberline Road and Horsetooth Road which was
presented before the Conceptual Review Team on January 27, 2003.
The comments are offered by staff to assist you in preparing the detailed components of the
project application. Modifications and additions to these comments may be made at the time of
formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 970-221-6750.
Sincerely,
-;�J404A4
Ted Shepard
Chief Planner
cc: Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
19. Bike parking and plaza have been provided.
20. Acknowledged; see site plan.
21. Acknowledged.
22. See landscape plan and architectural elevations.
23. Acknowledged.
Thank you for your consideration.
Sincerely,
Amy C. Johnson
VF Ripley Associates
July 15, 2003
Ted Shepard
City of Fort Collins Planning Department
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
RE: Response to Conceptual Review comments letter, for CARRIAGE AUTO
SERVICE SHOP.
Dear Ted,
The comments below address the issues raised by the Conceptual Review Team
regarding the New Carriage Lube Shop now named Carriage Auto Service Shop.
Upon receiving comments from the Conceptual Review Team, several meetings have
been held to discuss issues raised on the project. Byron Collins and Mark Tingey,
the developers, and members of the design team have had a utility coordination
meeting, and a meeting with Ted Shepard and Basil Hamden, to resolve several.
issues.
1. An interpretation from Cameron Gloss was sent April 18a' with an interpretation
which clarifies the qualification of the site within the Land Use Code standards
for a Convenience Shopping Center.
2. See site plan for Convenience Shopping Center boundary.
3. A 15' build -to line has been observed from the proposed dedicated Timberline
R.O.W.
4. Acknowledged.
5. Acknowledged.
6. Acknowledged.
7. Acknowledged.
8. Acknowledged.
9. Acknowledged, refer to Hazardous Materials Impact Analysis.
10. Acknowledged.
11. Acknowledged.
12. Acknowledged.
13. Acknowledged.
14. The site plan shows a 15' utility easement from proposed dedicated Timberline
R.O.W.
15. Acknowledged.
16.Our property does not border on Bighorn Drive; it is adjacent to a private drive to
the north.
17. Acknowledged.
18. Our property does not border on Bighorn Drive; it is adjacent to a private drive to
the north.