HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK PUD, 3RD FILING (RITE AID) - FINAL - 43-94G - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (6)Commur Planning and Environmental 'ices
Current Planning
City of Fort Collins
September 9, 1998
Robin Salvagio
CLC Associate, Inc.
8480 E. Orchard Road, #2000
Englewood, CO 80111
Dear Robin,
Staff has reviewed your documents for the Horsetooth East Business Park PUD, 3rd
Filing (Rite Aid), that were submitted on August 13, 1998 and offers the following
comments:
1. The Zoning Department stated the following:
a. At least one additional ramp is needed at the handicap accessible parking
stalls.
b. Please locate the bike rack near the building entrance (without impeding
pedestrian circulation).
C. Please remove all building signage from the building elevations. All signage
will be based upon the City Sign Code and is subject to the issuance of a
sign permit by the Zoning Department.
d. Please provide building envelope dimensions and the relative distances to
property lines on the Site Plan.
2. The Current Planning Department stated the following:
GENERAL:
a. A redlined set of the Plat, Site Plan, Landscape Plan and Building Elevations
is attached. Please return the redlined set with plan revisions.
PLAT:
fib. Right-of-way cannot be vacated by the Plat. City of Fort Collins right-of-way
may only be vacated by Ordinance of the City Council. The first reading of
such ordinance must be completed before this project can be considered by
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
Design Procedure
The STYROFOAM brand insula-
tion can be placed over the utility
line as either a horizontal layer
(Figure 2) or as an inverted-U
configuration (Figure 3).
The width of insulation
required is determined by the
equation:
W=3D+2[F-(X+D+0.5)]
where
W = width of insulation. ft.
D = pipe diameter, ft.
X = insulation depth, I
F = frost depth from Figure 4, ft.
(Fig. 4, last page)
The thickness of insulation is
determined by using the appropri-
ate design index from Figure 5
and, along with the depth of back -
fill over the insulation, selecting
the recommended insulation thick-
ness. in inches. from Table 1.
Where it is not practical to
excavate to the width needed for
a horizontal layer, an inverted - U
configuration can be used. The
bottom of the vertical legs should
be at least level with the bottom
of the utility line. The sum of the
length of the vertical legs and the
width of the horizontal section
should be equal to or greater than
the width of a horizontal layer
;nfiguration.
Example: A 12 in. diameter water
line will be buried at a depth of 3-
1/2 ft. The work site is located
near Minneapolis. MN.
X=3ft.
D=1ft.
F = 6 ft. (from Figure 4).
W = 30) + 2 [6 - (3+1+0.5)] = 6 ft.
Thickness is found by determin-
ing the Design Freezing Index
(°F - days) from Figure 5.
`F - days = 2500 - 3000
From Table 1, at a depth of 3 ft
and 3000 *F-days, the thickness of
insulation required is 3 inches.
TABLE 1 - Thickness of STYROFOAM Brand Insulation in Inches -
Amount of
Backfill over
Insulation (ft)
Design Freezing Index
ff-days)
1500 2000 2500 3000 3500 4000
4500
2'-0"
2.0'
2.5
3.0
3.5
4.0
4.5
5.0
T-0"
1.5
2.0
2.5
3.0
3.5
4.0
4.5
4'-0"
1.0
1.5
2.0
2.5
3.0
3.5
4.0
5'-0"
1.0
1.0
1.5
2.0
2.5
3.0
3.5
6'-0"
1.0
1.0
1.0
1.5
2.0
2.5
3.0
T-0"
1.0
1.0
1.5
2.0
2.5
8'-0"
1.0
1.0
1.5
2.0
9'-0" 1
1.0
1.0
1.5
10'-0"
1.0
1.0
Insulation Thickness (inches)
FIGURE 2 - Horizontal Layer Insulation
Soil Surface '
J
J C
W Y E
�
X < m
m
STYROFOAM Brand Insulation
Flt ::::.
D
Frost Depth (See Fig. 1)
See Caution
statement on differential icing
FIGURE 3 - Inverted - U Insulation
Soil Surface /
J
J C
a I Y E
U �
a
m
t..
Fifl.:`. ..: E:'d.
a+2b>W
See Caution statement on differential icing
Rite Aid Drug
Notes to be added to Sheet C6.10 pertaining to the replacement of existing sanitary sewer
1. During the replacement of existing sanitary sewers and manholes from station 1+00 - to station 4+87, contractor shall maintain continuous flow of sewage as follows:
a. During construction operations, flow shall be pumped around (from existing
manhole to existing manhole) the section being replaced. Contractor shall
have personnel attending the pump at all times during pump operation and
shall have emergency equipment/procedures in place for situations of pump
failure.
2. Contractor shall provide and maintain systems (pumps, piping, hoses, fittings,
couplings, etc.) which:
a. Are water -tight and which will prevent spills or discharges of raw sewage in
the trench or on any ground surfaces.
b. Have the proper capacity to prevent the surcharging of the upstream and
downstream sewers at all times.
3. Contractor shall confine all construction operations including storage of materials to
recorded utility easements or public right-of-way.
4. Contractor shall be responsible for any damage to private property resulting from raw
sewage discharges or from surcharging of sewers.
5. All sanitary sewers shall be air tested and all manholes vacuum tested in
accordance with Section 01666 of the Standard Construction Specifications.
-If the grades allow for the reL -,anent of the existing sanitary sewer, i , the following will
apply:
➢ Insulation is required for sanitary sewers less than 4 feet deep. Provide design information
and specifications for areas where insulation will be used. `
➢ Provide details for sequencing and construction methods for realignment of sanitary sewer
(see example attached to plan set).
➢ Replacement of the base and first section will be required for the sanitary sewer manhole at
station 1+00. Core drill opening into existing manhole at station 4+87.and reshape invert
inorder to redirect flow through manhole. - - - - - -
-See site, landscape and utility plans for other comments.
Date: Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
X Plat X Site _ Drainage Report _Other
X Utility X Redline Utility X Landscape
City of Fort Collins
REVISION
COMMENT SHEET
DATE: August 13, 1998 DEPT: Water/Wastewater
PROJECT: #43-94G Horsetooth East Business Park, 3rd
Filing, (Rite Aid) LDGS - Final
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, September 2, 1998
-The original plans for the sanitary sewer passing through this site, indicate that the sewer was
designed at minimum grade(0.4%). If it was installed per plans, then this realignment will not be
allowed, as the extra length and drop through the extra manhole will cause the grade to be less
than the allowable grade. Verify inverts of sanitary sewer NOW inorder to finalize design.
-Provide a minimum of 10 feet separation between realigned sanitary sewer and electric vault.
Will location of proposed sanitary sewer manhole, create conflicts with other utilities?
-Coordinate landscape design with civil design and provide required landscape/utility separation
distances.
-Connect proposed fire hydrant to 8-inch water main using a 8" x 6" swivel tee with 8" plug and
thrust block on unused side. Place fire hydrant 2 feet beyond back of curb.
-Reverse domestic service and fire line to avoid conflicts between service line and thrust block
on 90-degree elbow of fire line.
-Show location of proposed curbstop and draw meter pit to scale. Provide a 5 foot minimum
separation between meter pit and storm sewer line.
-Show locations of water and sewer main crossings in all profile views.
-Water and sewer services may not be projected under permanent structures (i.e. trash enclosures,
Drive up windows, etc.).
Date: 91719.s Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
X Plat X Site _ Drainage Report _Oth
X Utility X Redline Utility X Landscape
It
City of Fort Collins
Horsetooth East Business Park, 3rd Filing (Rite Aid) (page 2 of 2) September 9, 1998
site/landscape (continued)
• The deciduous trees along Timberline Road need to be placed with the center of the tree
at 12 feet east of the eastern property line. This will insure that the trees will be in the
future parkway strip and will not require relocation or removal at the time of the ultimate
improvements. Ornamental trees may be place in the parkway aredbeing provided with
this plan.
Plat
• It is not a private drive it is Elk Road - it is being vacated by ordinance and I can provide
the ordinance number upon final approval of the vacation by City Council for you to
include on the plat.
• In the area where Elk Road and Otter Drive are being vacated the area is being retained as
utility, drainage and emergency access easement.
• Indicate that the off -site easements are to be provided by separate document.
• indicate the width of Row being dedicated.
Utility Plans
• Revise the general notes as shown on the cover sheet and add the additional general notes
as indicated in order to provide City of Fort Collins General notes.
• Add `3`d filing' to the title.
• The access out of the site on the south to the access drive closest to Timberline road
needs to be narrowed to one lane going out. The narrowing should occur by moving the
eastern curb line west. This will help to provide adequate separation between the drive
and the ultimate right turn lane which will be 12 feet closer to the drive than shown on
these plans (these plans show the interim design for Timberline Road)
• Show the ribbon median in Timberline that will extend to Horsetooth.
• Reference the Horsetooth East Business Park, 2nd filing plans for the design of the access
drive and the Timberline improvements. This will have to be constructed prior to this
project being built. Note also this plan set can not be approved until those plans are
approved unless the design for the access drive and Timberline Road is included in these
plans.
• Provide the following details: additions to existing sidewalk D-20, curb and gutter detail
D-11, Patching detail.
• see plans for additional comments
r
t
REVISION
COMMENT SHEET
DATE: August 13, 1998 TO: Engineering
PROJECT: #43-94G Horsetooth East Business Park, 3rd
Filing, (Rite Aid) LDGS - Final
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, September 2,1998
Horsetooth East Business Park, 3td Filing (Rite Aid) September 9, 1998
Site/ landscape Plan
• The sidewalk on timberline is to be a 6 foot sidewalk with an 8 foot parkway.
• Notes on the Plans indicate that the right turn lane on Timberline and the internal drive
will be existing. This may be so, but if they haven't been built yet then they will need to
be built with this project. So please reference the plans that this design will be approved
with. Requirement of construction of these improvements will be a requirement of the
development agreement for both projects.
• The access out of the site on the south to the access drive closest to Timberline road
needs to be narrowed to one lane going out. The narrowing should occur by moving the
eastern curb line west. This will help to provide adequate separation between the drive
and the ultimate right turn lane which will be 12 feet closer to the drive than shown on
these plans (these plans show the interim design for Timberline Road)
• There is a note indicating that the sidewalk on the north side of the access drive is being
built by others. I am not sure who that is, but the 2"d filing is not showing the walk being
constructed on that side of the drive. So this plan needs to show it is being constructed
here.
• The site/landscape and utility plans do not reflect the latest pedestrian crossings of the
access drive as being shown on the 2nd filing submittal.
(Continued on next page)
Date: I?1?Ar
CM HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
. mat R — Oda
City of Fort Collins
9. On the plans, the storm sewer pipes are shown to be CPP/CCP (typo?) type pipes.
Please explain which one is correct and exactly what these pipes are.
RESPONSE:
10. The subbasins do not extend completely to the property line adjacent to Timberline
Road. When delineating subbasins, please include the entire property. In addition,
please show that all onsite flows are accounted for and none will go offsite
(specificially flows from the roof of the building).
RESPONSE:
Erosion/Sediment Control Comments (These comments were made on the initial
review but have not been addressed)
1. The erosion control report must include performance standard, effectiveness, and
erosion control cost estimate calculations.
2. The erosion/sediment plan needs standard erosion control notes, project schedule, and
BMP details.
3. The silt fence shown along Timberline Road on the west side of the new drainage
swale is not necessary if everything in that area flows into the swale. The pond will
act as a sediment trap with its outlet filter. There should also be a note on the plan
stating that the detention ponds will be constructed as the first step in overlot grading.
4. Please use a gravel sediment outlet filter on the main detention pond — straw bale
barriers in these locations don't work as well.
5. Vehicle Tracking Control needs to be defined on the plan. What does it consist of?
Please refer to the redlined report and plans for additional review comments.
hrthebp-b&c2.doc
3. It is unclear how the drainage for this site ties in with downstream established
conditions. Please discuss the drainage facility design more in detail and how it
relates to downstream facilities. In addition, please include with the report all
references that are mentioned as well as references that are asked for.
RESPONSE:
4. For the detention pond, please indicate on the plans the required volume, volume
provided, allowable release rate, actual 100-year discharge, 100-year water surface
elevation, and shade the extent of I00-year ponding. Also please indicate where the
spillway is located and include cross -sectional view.
RESPONSE:
5. The subbasins as delineated on the drainage plan do not correspond with the report.
In addition, there appears to be more than one concentration point in some of the
subbasins. Concentration points represent the location where all the flows in the
specific subbasin convene; therefore, each subbasin should only have one
concentration point. Please make changes as needed and include drainage summary
table (with concentration points) on drainage plan.
RESPONSE:
6. Please provide missing details of inlets, riprap protection, and restrictor plate/outlet.
RESPONSE:
M
7. On storm sewer profile views, please show the 100-year hydraulic grade line (HGL),
as well as other subsurface utilities and 100-year WSEL for the detention pond.
RESPONSE:
8. Please provide a downstream analysis of the entire storm sewer to the Carriage Wash
ponds. This was asked for on the previous submittal but was not addressed. Also
keep in mind that the orifice plate size for Pond A on the Carriage Wash site will
change with increased developed area contributing to the pond.
RESPONSE:
hrthebp-b&c2.doc
R •
T�� y COMMENT
DATE: August 13, 1998 TO: Stormwater
PROJECT: #43-94G Horsetooth East Business Park, 3rd
Filing, (Rite Aid) LDGS - Final
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, September 2,1998
1. Please calculate runoff coefficients as detailed in the City of Fort Collins Storm
Drainage Design Criteria Manual (revised January 1997). And with correctly
calculated runoff coefficients, please redo hydraulic and detention pond calculations.
RESPONSE:
2. Supporting calculations need to be provided for all proposed inlets, storm sewer
pipes, and riprap protection. Please provide these and add any pertinent information
(size, type, etc.) on the plans.
RESPONSE:
(continued on back)
Date: Lf �� Signature: f
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS A:> , be .
Zc Ply XSiw <Dra W Report x Otti�'"% r, L`
�jlffiy AAedbm UkCI* ,espoNss Ci�of Fort Collins
I.�
5. Comments and redlined utility plans from the Water and Wastewater Utility are
attached. Please return all redlined documents with plan revisions.
This completes the review comments at this time. Additional comments may be
forthcoming as the various departments and reviewing agencies continue to review this --
request.
Please contact the Current Planning Department for the required number of plan revisions
prior to revision submittal. Please provide a written response to each of the above stated
comments.
A Planning and Zoning Board date will not be assigned until all comments have been
addressed and revisions have been reviewed. Failure to resolve each of the issues
identified will result in a Staff recommendation of denial to the Planning and Zoning
Board.
Please contact me at 221-6206 if you have any questions or concerns related to these
comments.
Sincerely,
Michael Ludwig, ICP
City Planner
xc: Sheri Wamhoff
Stormwater Utility
Current Planning File #43-94G
BUILDING ELEVATIONS:
af. The proposed architecture does not tie in with other proposed and existing
buildings in the "Horsetooth East Business Park". The proposed building
should have a sloped/pitched roof. Architectural interest will be required
along the street fronts in accordance with the LDGS and the Interim
Standards for All Commercial Development. Columns, or recesses and
projections are needed to break up the building facades. Diamond shaped
windows should be eliminated.
ag. Please identify all building materials and colors on the building elevations.
Please provide color samples.
ah. Please specify that the asphalt shingles will be high -profile, heavy
dimensional, Class A fiberglass shingles.
ai. Please show the location of roof -top mechanical equipment on the building
elevations. The equipment screening should be incorporated into the
architecture of the building.
aj. Please indicate that building mounted meters, etc. will be painted to match
the building surface.
ak. Please provide a trash enclosure detail.
al. Please delete the copyright notes from the Building Elevation sheet. If
approved, the mylars for the PUD must be recorded and.kept on file with the
City of Fort Collins as public information. The City must be able to reproduce
blueline prints from the mylars upon request by the public. ,
LIGHTING PLAN:
am. Please delete the copyright notes from the Lighting Plan sheet. If approved,
the mylars for the PUD must be recorded and kept on file with the City of Fort
Collins as public information. The City must be able to reproduce blueline
prints from the mylars upon request by the public.
an. Please specify high-pressure sodium light fixtures rather than metal halide
light fixtures.
3. Comments and redlined plans from the Engineering Department are attached.
Please return all redlined documents with plan revisions.
4. Comments and redlined utility plans from the Stormwater Utility are attached.
Please return all redlined documents with plan revisions.
q. The sidewalk along the private drive should be 6 feet wide rather than 4 feet
wide.
The first driveway (south of the drive-thru) should be one-way directional (exit
only) to eliminate vehicular circulation conflicts. The driveway should be
narrowed by eliminating pavement from the east half of the proposed --
driveway. Please revise as noted on the redlined plan set.
S. Numerous improvements on the Site Plan are shown to be constructed by
others. By indicating that the improvements will be done with Pad G, the
Rite -Aid plan set cannot be recorded until after Pad G documents are
recorded. Please note that some of the off -site improvements do not match
what Pad G is proposing (i.e. crosswalks, sidewalks, etc.) Please coordinate
with the consultants for Pad G.
LANDSCAPE PLAN (Sheet 3):
3'-
t. Tree wells should be shifted from the center of the sidewalk. At least 4 feet
of clear sidewalk must be maintained.
U. Please add shrubs on the west edge of the parking lot.
V. The landscape island on the south side of the drive-thru lanes should be
widened as noted on the redlined plans and vertical, evergreen landscaping
added to screen the drive thru lanes.
W. Vertical, evergreen screening is needed southeast of the proposed building
to screen the loading dock.
X. Shrubs are needed between the parking rows north of the building as noted
on the redlined plans.
Y. Please add two trees at the northwest comer of the building as noted on the
redlined plans.
z . Please add trees in the parking lot islands as noted on the redlined plans.
aa. Please add shrubs along the north edge of the parking lot as noted on the
redlined plans.
ab. Please move the Plant List and Plant Notes from Sheet 4 to Sheet 3.
ac. Additional vertical landscaping is needed along the east side of the building.
ad. Please add tree protection notes to the Plant Notes on Sheet 3.
ae. Please add a note to the Landscape Notes which states that all landscaping
shall be AAN #1 grade.
the Planning and Zoning Board. Please contact the Engineering Department
to discuss the processing for a right-of-way vacation.
C. There still appear to be overlaps between the, proposed Plat boundary for
this project and the boundary for the Horsetooth East Business Park PUD,
2nd Filing. Please eliminate the overlaps and correct the legal as necessary.
d. Numerous off -site easements are needed for grading and access. Please
submit all easements in a form acceptable to the City of Fort Collins.
SITE PLAN (Sheet 1):
e. Please make sure that the legal description on the Site Plan is identical to
the legal description on the Plat.
Please replace the words "Signature Block" with the words "Statement of
Ownership".
g. Please add the word "Notary" above the notary certification statement.
h. Please add the words "Planning Certification" above the planning certification
statement.
Please revise the sheet index. Sheet one should indicate "Notes". Sheet
two should indicate "Site Plan".
j. General Note #7 indicates that rooftop mechanical equipment will be
screened with a metal decking structure. Please incorporate the screening
of the mechanical equipment into the building's architecture without the use
of metal decking structures.
k. Please revise Note #10 as per the attached redline.
SITE PLAN (Sheet 2):
I. Please add zone districts to the vicinity map.
M. Please dimension the widths of all sidewalks.
n. The parking lot should have standard parking stalls that are 9 foot wide and
19 feet deep. Drive aisles should be 24 feet wide. Please adjust the Site
Plan as noted on the attached redlined documents.
o. The foundation planting beds along the north and west building elevations
should be a minimum of 5 feet wide.
P. Please specify the species and diameter of all existing trees on the site that
are proposed to remain or be removed.