Erosion/Sediment Control Comments
1. Refer to drainage report.
2. Details, notes and schedule have been provided.
3. A silt fence is shown on the east side of the swale.
4. Gravel sediment outlet filters are being used.
5. See detail B sheet C5-9 for vehicle tracking control detail.
Engineering comments
1. The sidewalk is a 6 foot walk on Timberline.
2. The right -turn lane and internal drive have been noted as to construction.
3. The access drive on the south end of the property has been narrowed.
4. Northern Engineering has changed their plans and noted the sidewalk construction.
5. The Rite Aid and Norther Engineering set of plans have been coordinated.
6. The trees along Timberline have been reworked.
Plat
7. Rite Aid understands that Elk Road id being vacated.
8. Rite Aid understands that easements are being retained.
9. A note has been added that easements are to be provided by separate document.
Utility Plans
10. General notes have been added and revised.
11. The title has been revised to "Filing No. 3".
12. The south access point has been narrowed.
13. The median has been shown.
14. Reference to construction has been made.
15. Details have been provided.
Water/Wastewater comments
1. The sewer plans have been redesigned.
2. A 10 foot separation has been provided.
3. Landscaping and civil have been coordinated.
4. Fire hydrant location and connection have been revised.
5. Domestic and fire lines have been reworked to avoid conflicts.
6. A 5 foot separation between the meter pit and storm line has been provided.
7. Profiles have been provided.
8. The 6" fire line that runs under the "open" canopy structure is a private line.
Refer to Northern Engineering's documents for further information.
ZTheandscape island on the south side of the drive thru has been widened.
Landscapin�as been added.
4e, The rgreen trees have been relocated near the loading dock. They have not
increased th mber of the evergreens.
isregard note "x" per Mike Ludwig.
6. Adding trees to the northwest corner of the building would block the building
signage. QD
�Irees ave been added to the parking lot islands.
Ever reen trees exist at the north edge of the parking lot, additional shrubs are not
needed.
The plant list and notes have been moved from sheet 4 to sheet 3.
(0 1
Three rows of trees are already proposed along the east side of the building. One of
the t rows are evergreens. Additional trees are not needed. I �
(D Tree protection notes are included in the constructions ecifications.�• L To ` .
LThe AAN #1 grade note has been added tot a landscape plan.
Building Elevations
1. The building architecture has been revised and pre ' marl a roved planning.?
The architecture does match the proposed and existing "Horsetooth East Business Park".
2. Building materials have been labeled on the building elevations and match the
proposed and existing "Horsetooth East Business Park". A material board will be provided prior
to final approval.. tZYjZ
�. __3, ,Asphalt shingle a been specified.
P`�__ 4. Roof top mechanical equipment will be screened by the building architecture. %
5. Building mounted meters will be painted to match the building.
6. A trash enclosure detail has been provided. M4600L
7. The copyright note has been deleted from the plans.
Lighting Plan
1. The copyright note has been deleted from the plans.
2. High-pressure sodium light fixtures have been specified.
Stormwater comments
1. Runoff coefficients have been calculated, hydraulic and detention calculations have been
redone.
2. Proposed inlets, storm sewer pipes, and riprap protection supporting calculations have been
provided.
3. Drainage report has been updated.
4. Additional information has been added to the plan for the detention pond.
5. Changes have been made with regard to the subbasins on the plan and in the report.
6. Additional details have been added.
7. Additional information has been added to the storm sewer profiles.
8. All information referencing the Carriage Wash ponds has been included.
9. RCP pipes are being used.
10. It was agreed that .1 acre can drain offsite. See drainage report.
Horsetooth East Business Park PUD, 3" Filing (Rite Aid)
Response to staff comments dated September 9, 1998
Zoning Dent.
1. Handicap ramps have been revised at accessible parking stalls.
2. Bike rack is only 80' from the building entrance. Moving closer to the building entrance will
impend the pedestrian circulation.
All building signage has been removed
gnage is issued under separate permit.
froln the building elevations. Rite Aid understands
4. Dimensions have been added to site plan, for building envelope and relative- distance to
property lines.
Current Planning Dept.
General
1. The redline sets have been returned with this resubmittal.
lat W�?.
to Aid understands that Right-of-way cannot be vacated by the plat.
2. The overlaps between the proposed plat boundary and the boundary for Horsetooth
East Business Park PUD Filing No. 2 have been corrected. The legal description has been
changed.
3. Grading and access easements have been shown on plat and noted by separate
document. Easement legal descriptions will be submitted prior to f approval. i
Site Plan Sheet 1
Legal description has been revised.
"Signature Block" has been replaced with "Statement of Ownership".
"Notary" has been added above notary signature block.
"Planning Certification" has been added above planning signature block.
Sheet index has been revised.
6 Roof top mechanical equipment will be screened adequately from any pedestrian or
passenger car sight line. 7
7. Note No. 10 has been revised
Site Plan (Sheet 2)
Zone districts will be added riot to final approval. �Q� la0k!
Sidewalk widths have been dimensione and labeled typical—+ n"s
Parking lot dimensions have been revised �.. sO�c�,� V4 to( t
The foundation planting beds are 5 feet wide.
5. ll tree species that can oe taennnea nave beef
The attached sidewalks along the private drive are 6 feet wide.
- - 6The first driveway south of the drive thru is a one-way drive isle.
A note has been added to the site plan for construction by others.w
Landscaping Plan (Sheet 3) for iti�,o.
;�ez
/wells have been moved.
bs have been added on the west side of the parking lot.