HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK PUD - PRELIMINARY/FINAL - 43-94 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSOCT-2.4-94 MON IS c 34 C I TYSC_AP_E URBAN DE_SI_GN P _ 01
HORSETOOTH EAST BLISINE5S PARK
�.
!'
'
�' •
::' : `:, !: ° NOTES. REGARDING PARKING
pgMAND
F. :
1:
Parking deinsnd Is projected as:
Doctors (0 1 Cr.h O00 sq. ft) ;• 7 spaoos
A"Ptionlst/clerical staff 3 spaces
Ni.rs"Ai6hnicians
spaces
:
Patients in exam rooms (3/Dr.) 21
{
spaces .__,
'
Pntisnfa in i area (2]Dr 1, 14 sD®aces .:
•: . : :. '
.
\ ;-;'Total demand (7.4/DRI) ' ' —` 52 spaces (7.411000 s
Other demand comes, from "walk in".. traffic for blood pressure checks,
flu. ahots, other immunizations, eto.
1.
:w
It is ript,drireble to leave patients Coming to family
see s. Dr: without a piste to park.
4
Parliinp is shared with Lot 2. With cQnstruction
of the future building on that lot,',
overall parking ratio is projected to be 4,8%1000 . ft.
d
• ' fA
�., ♦ • :ilk' '
1'
Post-V brand fax transmlital memo 7vi N
'•
' •:..
of Pea•..
' .:i•, •
'
Phone
xs L Fax
BUSINESS
SERVICE USES
POINT CHART E
For All Criteria
Applicable Criteria Only
Criterion
Is
the
Criterion
Applicable
Yes No
I II ill IV
Circle
the
Correct Score
Multiplier
Points
Earned
Ixll
Maximum
Applicable
Pcints
a, Transit Route
X
2
0
2
b, South College Corridor
X
X
2
0
4
g
c. Part of Center
X
X
2
0
3
6
d, Two Acres or More
X
X
2
0
3
6
e. Mixed -Use
X
X
2
0
3
�;
6
f. Joint Parking
1
1 1
2
0
3
g. Energy Conservation
X
1112131410
2
g
h. Contiguity
X
X
2
0
5
10
i• Historic Preservation
1
2
0
2
J•
1
2
0
k.
1
2
0
1
2
0
Totals c
v vi
Percentage Earned of Maximum Applicable Points V/VI = VII
vu
Land Development Guidance System for Planned Unit Developments
The City of Fort Collins, Colorado, Revised March 1994
-73-
Business Service Uses (continued)
h. Is the project located with at least one -sixth (1/6) of its property boundary contiguous to existing
Cuban development?
i. If the site contains a building or place in which a historic event occurred, has special public value
because of notable architecture, or is of cultural significance, does the project fulfill the following
criteria?
1. Prevent creation of influences adverse to its preservation;
2. Assure that new structures and uses will be in keeping with the character of the building or
place. Imitation of period styles should be avoided; and
3. Propose adaptive use of the building or place that will lead to its continuance, conservation,
and improvement in an appropriate manner while respecting the integrity of the
neighborhood.
Lana Development Guidance System for Planned Unit Developments
The City of Fort Collins, Colorado, Revised March 1994
-72-
ACTIVITY:
Business Service Uses El
DEFINITION:
Those activities which are predominantly retail, office, and services uses which would not qualify as a
neighborhood service, neighborhood convenience, or community/regional shopping center. Uses include
retail shops; offices; personal service shops; financial institutions; hotels/motels; medical clinics; health
clubs; membership clubs, standard and fast-food restaurants; hospitals; mortuaries; indoor theaters;
recreation uses; small animal veterinary clinics; printing and newspaper offices; and, other uses which
are of the same general character.
CRITERIA:
Each of the following applicable criteria must be answered "yes" and implemented within the
development plan.
Yes No N/A
1. Does the project gain its primary vehicular access from a street other than ' ❑
South College Avenue?
2. DOES THE PROJECT EARN AT LEAST FIFTY (50%) PERCENT OF ]
THE IvIAXIML-M POINTS AS CALCULATED ON POINT CHART
"B" FOR THE FOLLOWING CRITERIA?
a. Is the activity contiguous to an existing transit route (not applicable
for uses of less than twenty-five thousand [25,0001 square feet GLA or
with less than twenty-five (251 employees, or located in the Central
Business District)?
b. Is the project located outside of the "South College Avenue Corridor"?
c. Is the project contiguous to and functionally a part of a neighborhood
or community/regional shopping center, an office or industrial park,
located in the Central Business District, or in the case of a single user, employ or will employ a
total of more than one hundred (100) full-time employees during a single eight (8) hour shift?
d. Is the project on at least two (2) acres of land, or located in the Central Business District?
e. Does the project contain two (2) or more significant uses (for instance retail, office, residential,
hotel/motel, or recreation)?
f. Is there direct vehicular and pedestrian access between on -site parking areas and adjacent existing
or future off -site parking areas which contain more than ten (10) spaces?
g. Does the activity reduce non-renewable energy usage through the application of alternative energy
systems or through energy conservation measures beyond those normally required by the Model
Energy Code as adopted by the City? Refer to Appendix "E" for energy conservation methods to
use for calculating energy conservation points.
Land Development Guidance System for Planned Unit Developments
The City of Fort Collins, Colorado, Revised March 1994
71-
,.3
Activity A: ALL DEVELOPMENT CRITERIA
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the criterion
applicable?
Will the critedo
be satisfied?
If no, please explain
r �
LL
Y
Yes
No
. COMMUNITY -WIDE CRITERIA
1.1 Solar Orientation
1.2 Comprehensive Plan
I
1.3 Wildlife Habitat
1.4 Mineral Deposit
�(
1.5 Ecologically Sensitive Areas
reserved
reservedT_r
1.6 Lands of Agricultural Importance
1.7 Energy Conservation
X
1.8 Air Quality
1.9 Water Quality
1.10 Sewage and Wastes
A 2. NEIGHBORHOOD COMPATIBILITY CRITERIA
2.1 Vehicular Pedestrian Bike Transportation
x
2.2 Building Placement and Orientation
2.3 Natural Features
2.4 Vehicular Circulation and Parking
2.5 Emergency Access
2.6 Pedestrian Circulation
2.7 Architecture
2.8 'Building Height and Views
2.9 Shading
2.10 Solar Access
2.11 Historic Resources
2.12 Setbacks
2.13 Landscape
2.14 Signs
2.15 Site Lighting
2.16 Noise and Vibration
2.17 Glare or Heat
2.18 Hazardous Materials
A 3. ENGINEERING CRITERIA
3.1 Utility Capacity
3.2 Design Standards
3.3 Water Hazards
3.4 Geologic Hazards
Land Development Guidance System for Planned Unit Developments
The City of Fort Collins, Colorado, Revised March 1994
y
-61-
0
�
VAUCHT
��IFF RRYY�YE
auqum Ess PkIRK lF.U.Bo
PREMMARY AND FINAL
ELEVATIONS
.r„ 3 w3
I
r�Tn n7n TnTn rnl
_.J I I I I I I I I U ll
- BIG' HORN DR.
I _
L-
I—IJ1LJ1
LJ1 L11 LI11IJ
II �_
III
I I I I
C
}TI
eu lows
yl
ii------1
I
III
I \
III
I
I r_
�Ji
�l J I I I I I I I I lL I
— —
�IIIIIIIIIIII IIII
Li 1 LLI I L11 LI_L J_ IJ ! Li
PLANT LIST PLANTING NOTES
UD[ 3OENnFlCN4,� I
�. " wu..rw.nwxrn..�vr.w. E%10TM5 WETLANDS�DETEMION AREA J
+ PPWE EXIGTM WILLOL TREES
•• °'w" �"'^�^ '...�.�� ' .� : �r� w��` "tl�"'� To CITY STAIlDA1 s AND R211OVE g1 lm OLIVE TREES.
NOXIO Y MS RR7'I DETENTION AREA WILE
NETANM=1 Ii Y %MD RAPT MAT MR . NEVEGETAM
AS NELLESSARY WITH NATIVE GWASS. WILDFLpIERIS. d SNR ft.
LANDSCAPE BREAKDOWN
w
z_
J
LLJ
ml
�Ityl- s
A)1 1 1'. 1 (1(1)
BUJSUN1ESS ?AIR IBC
RUJ.➢D.
PRELIMINARY AND FINAL
LEGEND
LANDSCAPE PLAN
EXISTRG TREES TO OE FEtIOY£D
EXISTM TREES TO IB N
DELIDIlD11S S44DE TREE
=
��.�
CWFERWSIIEE
s_
gNAN'@NT4 TIES
f£SOE 90D
—
m
LOT 3
FUTURE
INDUSTRIAL
ZONING IP
I
�L FUTURE BUSINESS SERVICES
ZONING IP
I BIG HORN DR.
O' YTILITT
T
J
I I
1 U I
r
PLD. BdSIDAR1
—
[—
_
--I I I 1
1 n 1 1 1 1 1 1 rT
—I -1LJ 1. 111 L1IJ
ITTII
-
i
BUILDRE
I
LOT ?
r
I
BUILDING
LOT 1
— L— -- L
J . DETENI
IIIIII IIIII III
— — — — 1L1.1—J1L ss
EXISTING EXISTING DETENTION POND
INDUSTRIAL GENERAL NOTES
ZONING IP _..... ... M
III I
3' ecRNs+ WALLS TOT, I V I\
I'1AtGN WLLOR1b — —
ATfAC181D
R OPTI
WALK ��
ICENrmunw /
_ — — — 9KN . �OJCRISi
e'IRIWI
MIS
-Mon
FUTURE — — —
MULTI —FAMILY
ZONING RMP
PROPOSED
FOX MEADOWS
CONVENIENCE
CENTER
ZONING RMP
VIGIN ry MAP
QtM@@p*
LAND USE BREAKDOWN
SIGNATURE BLOCK
PROPERTY DESCRIPTIONL
TT�T T��[�(�\may T�prypl�}Iq pI�7Ig7�7y7} 7�7q'q�„yp/�\�a�\+ry�l per"+SIT"I�p.
� �y I ®LLUIWJ.Ld ®®
Ll LL LlJ1 l.J:d�]]N/ Ll
PRELIMINARY AND FINAL
.... ""
LEGEND
SITE PLAN
R ACCEbIGILITi RN'IP
�•
4 9TANpA1® PAIKING SPKE
P .
WIVDICAP PARCMG
RV .fYJt�
—
1 a 3
II pL(/NDA LF
GOLF COURSE
SITE
.t
yyy'SaV�
IP
0
L /UTA'V
to
Et FM.
<n r Farr
OEM
.i ♦ Y� ♦ �.
Vicinity Map
HORSETOOTH EAST BUSINESS PARK PUD / 0
LOt 1 - Preliminary & Final
Project Number 43-94
Horsetooth East Business Park PUD - Preliminary and Final, #43-94
October 24, 1994 P & Z Meeting
Page 5
provided that such extension can be granted without
substantial detriment to the public good.
If the staff and the developer disagree over the provisions to
be included in the development agreement, the developer may
present such dispute to the Board for resolution if such
presentation is made at the next succeeding or second
succeeding monthly meeting of the Board. The Board may table
any such decision, until both the staff and the developer have
had reasonable time to present sufficient information to the
Board to enable it to make its decision. (If the Board elects
to table the decision, it shall also extend the term of this
condition until the date such decision is made.)
If this condition is not met within the time established
herein (or as extended, as applicable), then the final
approval of this planned unit development shall become null
and void and of no effect. The date of final approval for this
planned unit development shall be deemed to be the date that
the condition is met, for purposes of determining the vesting
of rights. For purposes of calculating the running of time for
the filing of an appeal pursuant to Chapter 2, Article II,
Division 3, of the City Code, the Iffinal decisional of the
Board shall be deemed to have been made at the time of this
conditional approval; however, in the event that a dispute is
presented to the Board for resolution regarding provisions to
be included in the development agreement, the running of time
for the filing of an appeal of such "final decision$' shall be
counted from the date of the Boards decision resolving such
dispute.
Horsetooth East Business Park PUD - Preliminary and Final, #43-94
October 24, 1994 P & Z Meeting
Page 4
FINDINGS of FACT/CONCLUSIONS:
In evaluating the request for the Horsetooth East Business Park
P.U.D., Preliminary & Final, staff makes the following findings of
fact:
* The proposal is in conformance with the approved
Horsetooth Business Park P.U.D., Amended O.D.P.
* The request scores 60% on the Business Service Uses Point
Chart in the L.D.G.S., which exceeds the minimum of 50%
required for the project to proceed without a variance to
the chart.
* The request meets the applicable All Development Criteria
of the L.D.G.S.
* The ratio of 7.7 parking spaces per 1,000 square feet of
leasable floor area, as proposed, is a high number for
the proposed office/medical uses on this site. The visual
impacts from the amount of proposed parking will be
mitigated with the inclusion of earthen berms and
landscaping in and around the groupings of parking.
* The property is exempt from the Residential Neighborhood
Sign District; therefore, all signage for this
development is subject to the strict interpretation and
requirements of the City Sign Code.
RECOMMENDATION:
Staff recommends approval of the Horsetooth East Business Park
P.U.D., Preliminary & Final - #43-94, with the following condition:
1. The Planning and Zoning Board approves this planned unit
development final plan upon the condition that the development
agreement, final utility plans, and final P.U.D. plans for the
planned unit development be negotiated between the developer
and City staff and executed by the developer prior to the
second monthly meeting (December 12, 1994) of the Planning and
Zoning Board following the meeting at which this planned unit
development final plan was conditionally approved; or, if not
so executed, that the developer, at said subsequent monthly
meeting, apply to the Board for an extension of time. The
Board shall not grant any such extension of time unless it
shall first find that there exists with respect to said
planned unit development final plan certain specific unique
and extraordinary circumstances which require the granting of
the extension in order to prevent exceptional and unique
hardship upon the owner or developer of such property and
Horsetooth East Business Park PUD - Preliminary and Final, #43-94
October 24, 1994 P & Z Meeting
Page 3
stucco. The material for the roofs will be a mix of red/brown/gray
concrete tiles. The roofs will be at a 2:1 slope from eaves to
peak.
Landscaping:
This development is providing 8 street trees along Timberline Road
in the parkway between the curbline and detached sidewalk. There is
an existing Poudre Valley REA power line along the west side of
Timberline Road in this area and the appropriate trees will be
specified when it is determined if and/or when these power lines
will be relocated or undergrounded. A combination of berming and
tall shrubs will be used to screen the parking from the arterial
street. There will be shade trees in the planting areas in the
parking lots. The foundation and accent plants around the building
will consist of a variety of ornamental trees, deciduous and
evergreen shrubs, and perennial flowers for low level color and
texture.
Parking:
The 54 vehicular parking spaces for a 7,000 square foot building,
at a ratio of 7.7 spaces per 1,000 square feet of leasable floor
area, is considered to be a high number for the proposed
office/medical uses on this site. The applicant has requested this
amount of parking because the intent is to divide the building into
7 separate medical practices, with each practice requiring 7
parking spaces for the doctor, support staff, and multiple patients
in treatment and waiting rooms. The visual impacts from the amount
of proposed parking will be mitigated with the inclusion of earthen
berms and landscaping in and around the groupings of parking.
Signage:
This property is exempt from the Residential Neighborhood Sign
District; therefore, all signage for this development is subject to
the strict interpretation and requirements of the City Sign Code,
which is administered by the Zoning Department.
4. Transportation:
This development will gain its access from Timberline Road, an
arterial street, via Big Horn Drive, an existing industrial local
street.
Horsetooth East Business Park PUD - Preliminary and Final, #43-94
October 24, 1994 P & Z Meeting
Page 2
COMMENTS:
1. Background,•
The surrounding zoning and land uses are as follows:
N: IP; vacant, planned business services (Horsetooth Business
Park)
S: IP; detention pond/common area (Horsetooth Business Park)
E: RMP; vacant, planned convenience center (Fox Meadows Business
Park)
w: IP; vacant, planned industrial/business services (Horsetooth
Business Park)
This property was annexed into the City with the Timberline-
Horsetooth Annexation in August, 1977.
The Planning and Zoning Board approved the Horsetooth-Timberline
Properties P.U.D., O.D.P. in November, 1988. This request is part
of the 2.1 acre Parcel C that was identified for business service
uses. The Horsetooth Business Park P.U.D., Amended O.D.P. was
approved by the Board in April, 1991, with this area being
identified as business services on a portion of Parcel D.
2. Land Use:
This is a request for Preliminary & Final P.U.D. for a 7,000 square
foot building for office/medical uses on a 1.32 acre lot in the
Horsetooth East Business Park. It is in conformance with the
approved Horsetooth Business Park P.U.D., Amended O.D.P. The
request has been evaluated against the Business Service Uses Point
Chart and the applicable All Development Criteria of the L.D.G.S.
It scores 60% on the chart (exceeding the minimum of 50% required
for the project to proceed without a variance to the chart),
earning points for: a) being located outside of the "South College
Avenue Corridor"; b) being functionally part of an approved
office/industrial park; c) having direct vehicular and pedestrian
access between on -site parking areas and future off -site parking
areas; and d) having 1/6th contiguity to existing urban
development.
3. Design:
Architecture:
The building will be a two-story structure, approximately 24' in
height, with 5,100 square feet of floor area on the main level and
1,900 square feet on the second level. The exterior wall materials
will be a mix of red/brown/gray brick and a beige/gray synthetic
ITEM NO. 5
MEETING DATE 10-24-94
STAFF Steve Olt
(=6=m 1)
City of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Horsetooth East Business Park P.U.D., Preliminary &
Final - #43-94
APPLICANT: The W. W. Reynolds Companies
c/o Cityscape Urban Design, Inc.
3555 Stanford Road, #105
Fort Collins, CO. 80525
OWNER: The W. W. Reynolds Companies
4875 Pearl East Circle
Boulder, CO. 80301
PROJECT DESCRIPTION:
This is a request for Preliminary & Final planned unit development
(P.U.D.) approval for a 7,000 square foot building for
office/medical uses on a 1.32 acre lot in the Horsetooth East
Business Park. The property is located at the southwest corner of
Timberline Road and Big Horn Drive and is zoned IP, Industrial
Park.
TION: Approval with a condition
EXECUTIVE SUMMARY:
This request for Final P.U.D. approval:
* Is in conformance with the approved Horsetooth Business
Park P.U.D., Amended Overall Development Plan (O.D.P.);
* scores 60% on the Business Service Uses Point Chart in
the Land Development Guidance System (L.D.G.S.), which
exceeds the minimum of 50% required for the project to
proceed without a variance to the chart;
* meets the applicable All Development Criteria of the
L.D.G.S.;
* is exempt from the Residential Neighborhood Sign
District; therefore, all signage for this development is
subject to the strict interpretation and requirements of
the City Sign Code.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT