Loading...
HomeMy WebLinkAboutLINDEN GROVE PUD - PRELIMINARY - 49-94 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTTABLE 2. ESTIMATED REQUIRED DETENTION (DETAIN THE DEVELOPED 100-yr STORM AND RELEASE AT THE 10-yr HISTORIC RATE) PO NO 02- ,Qin= C(Cf)IA= 21.241 . . . . . . . . . . . . ... ..... ............... .1 . . ... ....... . I . . . . . . . . . . . . . . . . . ....... . ......... elm 10 7.00 148.68 89,208 10.50 6,300 82,908 20 5.10 108.32 129,989 10.50 12,600 117,389 30 4.10 87.08 156,751 10.50 18,900 137,851 40 3.50 74.34 178,416 10.50 25,200 153,216 50 3.00 63.72 191,160 10.50 31,500 159,660 60 2.65 56.29 202,630 10.50 37,800 164,830 70 2.40 50.98 214,099 10.50 44,100 169,999 80 2.20 1 46.73 224,294 10.50 50,400 173,894 90 1.95 41.42 223,657 10.50 56,700 166,957 100 1.80 38.23 229,392 10.50 63,000 166,392 110 1.60 33.98 224,294 10.50 69,300 154,994 1 120 1.50 31.86 229,392, 10.50 75,600 153,792 TST, INC. CONSULTING ENGINEERS 8 9/9/94 1 0 TABLE 2. ESTIMATED REQUIRED DETENTION (DETAIN THE DEVELOPED 100-yr STORM AND RELEASE AT THE 10-yr HISTORIC RATE) IPOND "I Qin= C(COIA= 9.39 1 ON 10 7.00 65.73 39,438 0.65 390 39,048 20 5.10 47.89 57,467 0.65 780 56,687 30 4.10 38.50 69,298 0.65 1,170 68,128 40 3.50 32.87 78,876 0.65 1,560 77,316 50 3.00 28.17 84,510 0.65 1,950 82,560 60 2.65 24.88 89,581 0.65 2,340 87,241 70 2.40 22.54 94,651 0.65 2,730 91,921 80 2.20 20.66 99,158 0.65 3,120 96,038 90 1.95 18.31 98,877 0.65 3510 95,367 100 1.80 16.90 101,412 0.65 3:900 97,512 110 1.60 15.02 99,158 0.65 4,290 94,868 1 120 1.50 14.09 .101,412 0.65 4,680 96,732 TST, INC. CONSULTING ENGINEERS 7 9/9/94 TABLE 1. HYDROLOGIC CALCULATIONS WORKSHEET (DEVELOPED ON SITE AND EXISTING OFFSrfE CONDITION) YrrER . .. ....... T. A.M. RASIN;::�' NY ft -M, ...... 1 0 0.60 2.12 0.00 21.05 17.41 3.15 5.55 5.95 13.11 Bi 2 400 0.60 2.12 3.15 15.30 13.20 3.70 6.30 1.91 4.08 B2 2 350 0.60 2.12 2.75 14.91 12.80 3.73 6.50 1.44 3.14 B IR3 2 1050 0.60 2.12 8.26 20.41 18.31 3.18 5.40 6.01 12.76 B4 2 1000 0.60 2.12 7.86 20.02 17.92 3.23 5.50 4.35 9.25 B5 2 700 0.60 2.12 5.50 17.66 13.56 3.45 5.90 5.22 11.15 cl 3 300 0.60 2.12 2.36 14.51 12.41 3.75 6.50 1.87 4.06 C C2 3 350 0.60 2.12 2.75 14.91 12.80 3.73 6.50 2.30 5.01 C3 3 500 0.60 2.12 3.93 116.09 13.98 3.61 6.20 1.88 4.05 C4 2 450 0.60 2.12 3.54 15.69 13.59 3.68 6.45 1.42 3.12 DI 4 150 0.60 2.12 1.18 13.33 11.23 3.90 6.85 0.89 1.93 D2 4 150 0.60 2.12 1.18 13.33 11.23 3.90 6.85 0.84 1.85 D3 5 350 0.60 2.12 2.75 14.91 12.80 3.73 6.50 2.00 4.35 D D4 5 500 0.60 2.12 3.93 16.09 13.98 3.61 6.20 2.62 5.61 D5 6 600 0.60 2.12 4.72 16.87 14.77 3.53 6.08 2.78 5.99 D6 6 550 0.60 2.12 4.33 21.52 18.54 3.10 5.40 6.31 13.73 D7 7 450 0.60 2.12 3.54 15.69 13.59 3.68 6.45 3.23 7.07 D8 6 1250 0.60 2.12 9.83 21.99 19.88 3.08 5.20 6.24 13.16 El 8 600 0.60 2.12 4.72 21.91 18.93 3.08 5.35 4.14 0.00 E2 9 800 0.60 2.12 6.29 23.48 20.51 2.98 5.15 3.16 6.84 E E3 8 1000 0.60 2.12 7.86 25.05 22.08 2.86 4.96 6.51 14.12 E4 a 1100 0.60 2.12 8.65 20.81 18.70 3.13 5.40 3.41 7.35 ES 8 1100 0.60 2.12 8.65 20.81 18.70 3.13 5.40 5.44 11.72 TST, INC. CONSULTING ENGINEERS j 9/8/94 c M, 7-MIRMIMIMMIMIRIMIEW. TABLE 1. HYDROLOGIC CALCULATIONS WORKSBEET (DEVELOPED ON SITE AND EXISTING OFFSITE CONDITION) ............VER%iSiSiB..... ............ ch ASIN A 1 4.20 0.45 1.00 1.25 1.89 2.36 300 1.00 21.05 17.41 B1 2 1.15 0.45 1.00 1.25 0.52 0.65 100 1.00 12.16 10.05 B2 2 0.86 0.45 1.00 1.25 0.39 0.48 100 1.00 12.16 10.05 B B3 2 4.20 0.45 1.00 1.25 1.89 2.36 100 1.00 12.16 10.05 B4 2 2.99 0.45 1.00 1.25 1.35 1.68 100 1.00 12.16 10.05 B5 2 3.36 0.45 1.00 1.25 1.51 1.89 100 1.00 12.16 10.05 Cl 3 1.11 0.45 1.00 1.25 0.50 0.62 100 1.00 12.16 10.05 C C2 3 1.37 0.45 1.00 1.25 0.62 0.77 100 1.00 12.16 10.05 C3 3 1.16 0.45 1.00 1.25 0.52 0.65 100 1.00 12.16 10.05 C4 2 0.86 0.45 1.00 1.25 0.39 0.48 100 1.00 12.16 10.05 D1 4 0.50 0.45 1.00 1.25 0.23 0.29 100 1.00 12.16 10.05 D2 4 0.48 0.45 1.00 1.25 0.22 0.27 100 1.00 12.16 10.05 D3 5 1.19 0.45 1.00 1.25 0.54 0.67 100 1.00 12.16 10.05 D D4 5 1.61 0.45 1.00 1.25 0.72 0.91 100 1.00 12.16 10.05 D5 6 1.75 0.45 1.00 1.25 0.79 0.98 100 1.00 12.16 10.05 D6 6 4.52 0.45 1.00 1.25 2.03 2.54 200 1.00 17.19 14.21 D7 7 1.95 0.45 1.00 1.25 0.88 1.10 100 1.00 12.16 10.05 D8 6 4.50 0.45 1.00 1.25 2.03 2.53 100 1.00 12.16 10.05 El 8 2.99 0.45 1.00 1.25 1.35 1.68 200 1.00 17.19 14.21 E2 9 2.36 0.45 1.00 1.25 1.06 1.33 200 1.00 17.19 14.21 E E3 8 5.06 0.45 1.00 1.25 2.28 2.85 200 1.00 17.19 14.21 E4 8 2.42 0.45 1.00 1.25 1.09 1.36 100 1.00 12.16 10.05 E5 8 3.86 0.45 1.00 1.25 1.74 2.17 100 1.00 12.16 10.05 TST, INC. CONSULTING ENGINEERS 5 9/8/94 C 3.2 Drainage Plan Development The proposed drainage plan consists of overland flow across lots which will be collected in the streets, directed to a detention pond then to the proposed Dry Creek Channel. Gutter flow in streets will be collected at low points via curb inlets, piped to the detention pond, then outlet to Dry Creek Channel. Subbasins were delineated based on a preliminary proposed grading plan. The proposed grading is not shown on the Preliminary Drainage Plan; however, it is a conservative assumption assuring that the streets will not be inundated. The results of the hydrologic analysis can be found in Table 1 with supporting calculations shown in Appendix A. Table 2 depicts the estimated detention requirements based on the weighted runoff rate found in the Drainage Master Plan. Supporting information for the detention requirements can be found in Appendix B. The Final Drainage Report shall include an analysis of street capacities to determine if curb inlets and storm sewers will be necessary at points further upstream than the low points. Curb inlets, channels, culverts, and detention facilities will be sized to intercept and convey runoff from the 100-year storm. Channels, roadside ditches, and detention facilities will be designed to incorporate a minimum of V of freeboard and will have velocities that do not promote erosion. 3.3 Erosion Control Plan An erosion control plan will be submitted with the Final Drainage Report. Quantities and types of erosion control measures to be used will be delineated in the Final Drainage Report. TST, Inc. September 12, 1994 1a793-" 4 3.0 DEVELOPED CONDITIONS PLAN 3.1 Design Criteria The drainage system presented in this report has been developed in accordance with the guidelines established by the Fort Collins Storm Drainage Design Criteria and Construction Standards (S.D.D.C.), and the Denver Regional Council of Government Urban Storm Drainage Criteria Manual (USDCM). Developed condition storm facilities were evaluated based on the 100-year storm frequency. Since a Drainage Master Plan for the area has been completed, we followed the Master Plan's guidelines; therefore, historic runoff was not calculated. Due to the limited size of the site, the Rational Method was. selected to calculate runoff for street capacity analysis. The Rational Method utilizes the S.D.D.C. Manual Equation: Q = Cf CIA where Q is the flow in CFS, A is the total Area of the basin in acres, Cf is the storm frequency adjustment factor, C is the runoff coefficient, and I is the rainfall intensity in inches per hour. The runoff coefficient, C, was selected to be 0.45 as taken from the S.D.D.C. Manual for RLP zoning. The frequency adjustment factor, Cf, is given on pages 3-5, Table 3-4 of the S.D.D.C. Manual and is 1.25 for the 100-year storm and 1.00 for the 2-year storm. The intensity (I) was taken rom the City of Fort Collins rainfall intensity duration curve in the S.D.D.C. Manual. To obtain the rainfall intensity, the time of concentration had to be determined.. The following equation was utilized to determine the time of concentration: 4=k+tt where t, is the time of concentration in minutes, t; is the initial or overland flow time in minutes, and t� is the concentrated flow time (ditch, channel, or gutter) in minutes. The initial or overland flow time was calculated using the equation on pages 3-5, section 3.1.7 in the S.D.D.C. Manual: t;= 1.87(1.1-CCfLD! S% where t; is the initial time of concentration, D is the length of the overland flow in feet, S is the average basin overland slope in percent. This procedure for computing time of concentration allows for overland flow as well as travel time for runoff collected in streets, gutters, channels, pipes, or ditches. The times of concentration calculated assumed only about 100 feet overland flow of the total travel length. The remainder'of the flow was considered as channel flow (in street gutters). TST, Inc. September 12, 1994 10-793-" 3 io 11 1.0 INTRODUCTION 1.1 Scope and Purpose This report presents the results of a Preliminary Drainage Evaluation for the Linden Grove P.U.D. A hydrologic analysis of the proposed development plan was completed to determine the location and magnitude of the storm runoff. A preliminary evaluation of major runoff conveyance elements was conducted to determine approximate channel size, culvert sizes, and detention pond sizes. The purpose of this report is to evaluate the development in preparation for a final stormwater management plan that will address: (1) overall storm drainage planning and management, (2) detention facilities size and location, and (3) erosion control. 1.2 Project Location and Description Linden Grove P.U.D. is a proposed residential site located in the Southeast Quarter of Section 1, Township 7 North, Range 69 West, of the 6th Principal Meridian, in Larimer County, Colorado. The site is roughly bounded by North Lemay Avenue to the East, Redwood Street to the West, East Vine Drive to the South, and Conifer Street to the North (see Figure 1). The proposed site falls within the Evergreen-Greenbriar Drainage Basin. Linden Grove P.U.D.. consists of 58.71 acres (more or less) and is within an RLP (Residential Low Density) Zoning District within the City of Fort Collins, Colorado. The development will have approximately 1R9 lots. All of the roadways within the development will be classified as local streets. 1.3 Previous Studies The "Evergreen-Greenbriar North Alta Vista Basin Drainage Master Plan" (draft copy by Lidstone and Anderson, Inc:, September 1994) was reviewed prior to commencement of this report. It was found that our site is only able to outlet 0.19 cfs per acre (11.15 cfs for entire site). 2.0 HISTORIC CONDITIONS The existing site, which is currently a farm field, has storm runoff which sheet flows to the Southeast corner of the property. No offsite flow is conveyed across proposed site (it is collected in Lake Canal Ditch). TST, Inc. September 12, 1994 10-793-" 1 L u TABLE OF CONTENTS 1.0 Introduction Pare 1.1 Scope and Purpose ................................... 1 1.2 Project Location and Description .......................... 1 1.3 Previous Studies .................................... 1 2.0 Historic Conditions ....................................... 1 3.0 Developed Conditions Plan 3.1 Design Criteria .............. 3 3.2 Drainage Plan Development ............................. 4 3.3 Erosion Control Plan ................................. 4 Figures Figure 1 - Vicinity Map ........................................ 2 Tables Table 1 - Hydrological Calculations Worksheet ........................... 5 Table 2 - Estimated Required Detention ............................... 7 Technical Appendix Appendix A -Rational Method Analysis Appendix B - Preliminary Detention Analysis TST, Inc. September 12, 1994 10-793-000 ii n a'' TSTI Mr. Glen Schleuter City of Fort Collins Stormwater Utility 235 Mathews Street P.O. Box 580 Fort Collins, CO 80522 Re: Linden Grove P.U.D. Project No. 10-793-000 Dear Glen: September 12, 1994 We are pleased to submit this Preliminary Drainage Report for Linden Grove P.U.D. This report was prepared based on the City of Fort Collins criteria and we believe it satisfies all the criteria set forth for a Preliminary Report. If you should have any questions and/or comments, please do not hesitate to contact me. Respectfully, TST, INC., CONSULTING ENGINEERS A�-4 - Steve F. Humann, P.E. MBR/lg Enclosure Michael B. Reeve, P.E. TSTINC. 748 Whalers Way - Building D 102 Inverness Terrace East ! Fort Collins, CO 80525 Suite 105 Consulting Engineers (303) 226-0557 Englewood, CO 80112 Metro Denver (303) 595-9103 (303)792-0557 Fax (303) 226-0204 Fax (303) 792-9489 No Text